Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-01960
StatusFinaled
Name TAHOE HOMES LLC
Site Address 3094 E HEARTLEAF LN
Project Name 
Customer Number 
ePlanReviewNo
Description
**WUI ZONE 'B" with WUI ZONE "A" REQUIREMENTS** To construct a new 2485s.f. three story single family dwelling. There is to be 2 1/2 bathrooms and 3-bedrooms. There is 629s.f. of living space on the main level with 1-bedroom and 1/2 bathroom; 1296s.f. with 1-bedroom and 1-full bathroom on the second level that extende over the 700s.f. 3-car garage; the third level master suite is 1-bedroom with a full bathroom. A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. R-1C / R-2D ok per david Moser. All per the approved plans, REScheck, Manual J & D report; ESC plan requirements; engineering details with engineer's calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/14/20145/15/20145/15/2014APASS
DetailsJim Storey
clint Phone #: ###-####
DOC - Permit Finaled5/15/20145/15/20145/15/2014PPASS
DetailsJim Storey
PubWorks Occupancy Approval5/14/20145/14/20145/14/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance3/4/20143/10/20143/10/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in3/4/20143/6/20143/6/2014PPASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Other2/18/20142/19/20142/19/2014PPART
DetailsJim Storey
fire soffit insp // Clint Phone #: ###-####
BLD-Final2/12/20142/13/20142/13/2014APASS
DetailsJim Storey
clint -fire can instection Phone #: ###-####
Plan Modification Accepted  2/13/2014 DONE
new manual j
Routing - MECHANICAL2/13/2014 2/13/2014 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing2/4/20142/5/20142/5/2014APASS
DetailsJim Storey
Rudy Phone #: ###-####
BLD-Wall Bracing1/27/20141/27/20141/27/2014PPART
DetailsMike Jordan
rudy Phone #: ###-####. Exterior wall bracing, 2nd story. Still needs to install MSTc 37 floor to floor strap at tall wall.
BLD-Foundation8/22/20138/22/20138/22/2013PPASS
DetailsJim Storey
4ish - anton Phone #: ###-####
BLD-Footing8/21/20138/21/20138/21/2013PPASS
DetailsJim Storey
Anton Phone #: ###-####
PubWorks Subgrade Approval8/21/20138/21/20138/21/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer. Building department may be scheduled for footing inspections. Jason Taylor ###-####
Issue PAID IN FULL permit  8/8/2013 DONE
DetailsBarbara Stitt
OVERRIDE  8/2/2013  
Routing - PLAN CHECK7/23/2013 8/2/2013 PASS
DetailsPerry Paine
1st review completed  8/2/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/2/2013 DONE
Case Summary (BLD)  8/2/2013  
Inspection Record Card- Bld  8/2/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  8/2/2013 DONE
DetailsTisha Gallop
Plan assigned to (CDM)7/25/20137/25/20138/1/2013 DEFR
DetailsCarl D Madsen
3 storyHillside Due 8/5
Plan assigned to (AJS) 7/18/20137/25/2013 DEFR
DetailsAdele J Schaffeld-Griffin
Due 8/5 Hillside
Route to Impact Fee Review7/18/20137/23/20137/23/2013 PASS
DetailsCindy M. Gould
Routing - FIRE7/23/20137/19/20137/23/2013 PASS
DetailsScott Arellano
No comments.
Routing - MECHANICAL7/22/2013 7/23/2013 PASS
DetailsTroy James
Routing - Erosion and Sediment7/23/2013 7/23/2013 PASS
DetailsKimberly M. Johnson
Plan requirement waived after site evaluation per email Jan 17, 2013.
Routing - PLANNING7/22/2013 7/22/2013 PASS
DetailsDavid Moser
Approved as redlined; reduce the wall on the east side by 1 foot so it complies with 9 foot setback
Routing - PUBLIC WORKS  7/22/2013 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside  7/19/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - Addressing7/18/2013 7/19/2013 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  7/18/2013 DONE
DetailsChristina Prado
Intake Approval  7/18/2013 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  7/18/2013 DONE
DetailsChristina Prado
Application received 7/18/2013