Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-02054
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8812 W PINE NUT LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1682 sq. ft., two story (first story 731 sq. ft., second story 951 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 48 sq. ft. of covered patio/porch and a 439 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/30/2014 DONE
DetailsCandy A. Nichols
BLD-Final4/23/20144/23/20144/23/2014PPASS
DetailsMike Jordan
DOC - Permit Finaled4/23/20144/23/20144/23/2014PPASS
DetailsMike Jordan
All issues resolved.
BLD-Final4/4/20144/7/20144/7/2014AFAIL
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Needs to patch common wall of garage with residence to eliminate opening protection issues.
BLD-Blower Door Test Results4/7/20144/7/20144/7/2014ADONE
DetailsMike Jordan
3.0
BLD-Wall cover12/10/201312/11/201312/11/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. interior wall bracing and firewall ok.
BLD-Energy code compliance11/18/201311/20/201311/20/2013APASS
DetailsMike Jordan
Call brian prior Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in11/13/201311/14/201311/14/2013AFAIL
DetailsMike Jordan
Call Brian prior to inspection. Phone #: ###-#### >> Inspection requested via web by Brian Stark. Firecaulk seems and ground wire at electrical ground at 1hr. firewall. Provide solid blocking between roof truss in garage at 1hr. wall. Provide full height blocking above interior shearwall. Complete airseal on 2nd floor ceiling fixtures. ok to insulate.
BLD-Framing/Rough-in11/12/201311/13/201311/13/2013PCANC
DetailsMike Jordan
Call prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark
BLD-Wall Bracing10/24/201310/25/201310/25/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall Bracing10/21/201310/22/201310/22/2013APART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 1st. story only.
BLD-Footing9/11/20139/12/20139/12/2013PPART
DetailsJim Sly
Greg Phone #: ###-#### Slab
BLD-Energy code compliance8/29/20138/29/20138/29/2013PPASS
DetailsMike Jordan
greg Phone #: ###-#### Rigid insulation at stemwall under slab on grade.
BLD-Foundation8/26/20138/27/20138/27/2013PPASS
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing8/27/20138/27/20138/27/2013PPASS
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Footing was inspected yesterday, the wrong permit number was called in.
BLD-Conference8/21/20138/21/20138/21/2013ADONE
DetailsMike Jordan
ESC Phone #: ###-#### >> Inspection requested via web by James Larkin
Issue PAID IN FULL permit  8/19/2013 DONE
DetailsChristina Prado
OVERRIDE  8/8/2013  
Telephone call  8/8/2013 DONE
DetailsTisha Gallop
called Jim and told him permit is ready and fee.
Permit Ready to Issue  8/8/2013 DONE
DetailsTisha Gallop
Plan assigned to (JG)8/7/20138/7/20138/7/2013 PASS
DetailsJavier Guzman
1st review completed  8/7/2013 DONE
DetailsJavier Guzman
Case Summary (BLD)  8/7/2013 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/7/2013 DONE
Inspection Record Card- Bld  8/7/2013 DONE
DetailsChristina Prado
Routing - PLAN CHECK8/6/2013 8/7/2013 PASS
DetailsJavier Guzman
Adele
Routing - MECHANICAL8/1/2013 8/6/2013 PASS
DetailsTroy James
Routing - PLANNING7/30/2013 8/5/2013 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS  7/30/2013 PASS
DetailsConnie Baumgartner
Route to Impact Fee Review7/26/20137/31/20137/29/2013 PASS
DetailsCindy M. Gould
Application received 7/26/20137/29/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  7/29/2013 DONE
DetailsBarbara Stitt
Intake Approval  7/29/2013 PASS
DetailsBarbara Stitt
Routing - Addressing7/29/2013 7/29/2013 PASS
DetailsJason C. Taylor
Recd Pcfee & Taken To Pln CK  7/26/2013 DONE
DetailsBarbara Stitt
Plan assigned to (AJS)7/29/20137/29/20137/7/2013 DEFR
DetailsAdele J Schaffeld-Griffin
Due 8/9