Case Summary (BLD) | | | 5/30/2014 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 4/23/2014 | 4/23/2014 | 4/23/2014 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/23/2014 | 4/23/2014 | 4/23/2014 | P | PASS |
Mike Jordan
|
|
|
All issues resolved.
|
BLD-Final | 4/4/2014 | 4/7/2014 | 4/7/2014 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Needs to patch common wall of garage with residence to eliminate opening protection issues.
|
BLD-Blower Door Test Results | 4/7/2014 | 4/7/2014 | 4/7/2014 | A | DONE |
Mike Jordan
|
|
|
3.0
|
BLD-Wall cover | 12/10/2013 | 12/11/2013 | 12/11/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark. interior wall bracing and firewall ok.
|
BLD-Energy code compliance | 11/18/2013 | 11/20/2013 | 11/20/2013 | A | PASS |
Mike Jordan
|
|
|
Call brian prior Phone #: ###-#### >> Inspection requested via web by Brian Stark
|
BLD-Framing/Rough-in | 11/13/2013 | 11/14/2013 | 11/14/2013 | A | FAIL |
Mike Jordan
|
|
|
Call Brian prior to inspection. Phone #: ###-#### >> Inspection requested via web by Brian Stark. Firecaulk seems and ground wire at electrical ground at 1hr. firewall. Provide solid blocking between roof truss in garage at 1hr. wall. Provide full height blocking above interior shearwall. Complete airseal on 2nd floor ceiling fixtures. ok to insulate.
|
BLD-Framing/Rough-in | 11/12/2013 | 11/13/2013 | 11/13/2013 | P | CANC |
Mike Jordan
|
|
|
Call prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark
|
BLD-Wall Bracing | 10/24/2013 | 10/25/2013 | 10/25/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark
|
BLD-Wall Bracing | 10/21/2013 | 10/22/2013 | 10/22/2013 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 1st. story only.
|
BLD-Footing | 9/11/2013 | 9/12/2013 | 9/12/2013 | P | PART |
Jim Sly
|
|
|
Greg Phone #: ###-#### Slab
|
BLD-Energy code compliance | 8/29/2013 | 8/29/2013 | 8/29/2013 | P | PASS |
Mike Jordan
|
|
|
greg Phone #: ###-#### Rigid insulation at stemwall under slab on grade.
|
BLD-Foundation | 8/26/2013 | 8/27/2013 | 8/27/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/27/2013 | 8/27/2013 | 8/27/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Footing was inspected yesterday, the wrong permit number was called in.
|
BLD-Conference | 8/21/2013 | 8/21/2013 | 8/21/2013 | A | DONE |
Mike Jordan
|
|
|
ESC Phone #: ###-#### >> Inspection requested via web by James Larkin
|
Issue PAID IN FULL permit | | | 8/19/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/8/2013 | | |
|
|
|
|
Telephone call | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
called Jim and told him permit is ready and fee.
|
Permit Ready to Issue | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JG) | 8/7/2013 | 8/7/2013 | 8/7/2013 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 8/7/2013 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 8/7/2013 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 8/6/2013 | | 8/7/2013 | | PASS |
Javier Guzman
|
|
|
Adele
|
Routing - MECHANICAL | 8/1/2013 | | 8/6/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 7/30/2013 | | 8/5/2013 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | | | 7/30/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 7/26/2013 | 7/31/2013 | 7/29/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 7/26/2013 | 7/29/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2013 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 7/29/2013 | | PASS |
Barbara Stitt
|
|
|
|
Routing - Addressing | 7/29/2013 | | 7/29/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (AJS) | 7/29/2013 | 7/29/2013 | 7/7/2013 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
Due 8/9
|