Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-02059
StatusFinaled
Name JH DEVELOPMENT INC
Site Address 1897 S TRAVERTINE WAY
Project NameTravertine
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, Permit for the construction of a new 3800 sq. ft., two story (first story 1900 sq. ft.)., (basement 1900 sq. ft.) single family dwelling with 3 bedrooms, and (2) 1/2 baths, approximately 183 sq. ft. of covered patio/porch and a 845 sq. ft. garage per the approved plans, prescriptive energy, structural calculations, plan review report and any notations. R-1A/DA zoning and setbacks per planning. AJS A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. All compaction testing results must be submitted as well. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  3/4/2015 DONE
BLD-Final6/25/20146/25/20146/25/2014PPASS
DetailsDave Hannah
Eric Phone #: ###-####
DOC - Permit Finaled6/25/20146/25/20146/25/2014PPASS
DetailsDave Hannah
PubWorks Occupancy Approval6/25/20146/25/20146/25/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance1/28/20141/29/20141/29/2014APASS
DetailsDave Hannah
eric Phone #: ###-####
BLD-Framing/Rough-in1/22/20141/22/20141/22/2014PPASS
DetailsDave Hannah
eric Phone #: ###-####
Plan Modification Accepted  12/9/2013 DONE
new manual j
Routing - MECHANICAL12/9/2013 12/9/2013 PASS
DetailsTroy James
resubmitted manaul j report
BLD-Foundation9/27/20139/30/20139/30/2013PPASS
DetailsDave Hannah
BEN Phone #: ###-####
BLD-Footing9/20/20139/20/20139/20/2013PPASS
DetailsDave Hannah
Ben Phone #: ###-####
PubWorks Subgrade Approval9/6/20139/6/20139/6/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
(F) Reprint permit  8/29/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  8/27/2013 DONE
DetailsChristina Prado
OVERRIDE  8/20/2013  
Plan assigned to (AJS)7/29/20137/29/20138/20/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 8/15 Hillside
Routing - PLAN CHECK8/20/2013 8/20/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  8/20/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/20/2013 DONE
Inspection Record Card- Bld  8/20/2013 DONE
Telephone call  8/20/2013 DONE
DetailsChristina Prado
called Robert to advise permit is ready and gave fees due
Permit Ready to Issue  8/20/2013 DONE
DetailsChristina Prado
Plan resubmittals received  8/16/2013 DONE
DetailsChristina Prado
received two sets of revised structural calcs, back elevation details and foundation details(both 8 1/2 X11); Taken to Adele for review
1st review completed  8/14/2013 FAIL
DetailsAdele J Schaffeld-Griffin
emailed comments to applicant 8/14/13
Routing - PLAN CHECK8/8/2013 8/14/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see plan review comments in documents
Routing - MECHANICAL8/13/2013 8/13/2013 PASS
DetailsTroy James
Routing - FIRE8/8/2013 8/8/2013 PASS
DetailsScott Arellano
Plans are approved as shown. No comments attached.
Routing - Erosion and Sediment8/7/2013 8/8/2013 PASS
DetailsKimberly M. Johnson
Routing - MECHANICAL8/1/2013 8/7/2013 FAIL
DetailsTroy James
emailed corrections to Don Heating Supply
Routing PW Grading-Hillside8/5/2013 8/6/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. All compaction testing results must be submitted as well. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PLANNING7/30/2013 8/1/2013 PASS
DetailsJoshua Johnson
Routing - PUBLIC WORKS7/30/2013 7/30/2013 PASS
DetailsConnie Baumgartner
Route to Impact Fee Review7/29/20138/1/20137/29/2013 PASS
DetailsCindy M. Gould
Routing - Addressing7/29/2013 7/29/2013 PASS
DetailsJason C. Taylor
Intake Approval  7/29/2013 PASS
Application received  7/28/2013 DONE
Application submitted via PDS Online on Jul 28 2013 5:27PM