Case Summary (BLD) | | | 5/20/2014 | | DONE |
|
|
|
|
BLD-Final | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | FAIL |
Mike Jordan
|
|
|
Steve Abbey-Please verify mech permit not required and document Thanks Phone #: ###-####. Provide the ADA signage at the two firedoors as noted on the approved plans.
|
FIRE-Final Inspection | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Tim, Kmart facilities, is going to repair the two inoperative exit signs.
|
Fees Due Hold | 8/15/2013 | | 8/21/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/14/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/14/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 7/29/2013 | 7/29/2013 | 8/9/2013 | | PASS |
Carl D Madsen
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/9/2013 | | DONE |
Christina Prado
|
|
|
called Mikael to advise permit is ready for pickup pending GC and gave fees due
|
Permit Ready to Issue | | | 8/9/2013 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 8/8/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/8/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/30/2013 | | 8/8/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 7/29/2013 | | 7/30/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 7/30/2013 | | 7/30/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 7/30/2013 | | 7/30/2013 | | PASS |
Brian Murphy
|
|
|
|
Application received | | 7/29/2013 | 7/29/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 7/29/2013 | | 7/29/2013 | | PASS |
Jason C. Taylor
|
|
|
|