Letter of compliance/Occupancy | | | 1/14/2016 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | PASS |
Jim Storey
|
|
|
Grading & Drainage only, all BLDs in Temp or FNL status
|
DOC - Permit Finaled | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 6/1/2015 | 6/1/2015 | 6/1/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Routing PW Solid Waste | 10/29/2013 | | 10/29/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 10/29/2013 | | 10/29/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Issue PAID IN FULL permit | | | 8/23/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 8/7/2013 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2013 | | DONE |
|
|
|
|
Routing - FIRE | 8/5/2013 | 8/5/2013 | 8/6/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached. Dedicated Fire Department Access roadways shall comply with BMC 7-01-29 & 7-01-33. Final approval will be subject to satisfactory field inspection.
|
Additional plans submitted | | | 8/6/2013 | | DONE |
Kimberly M. Johnson
|
|
|
construction schedule submitted
|
Routing - Erosion and Sediment | 8/1/2013 | | 8/6/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Passed with Redlines: Spoke with SWPPP author, Don Reynolds 8/6/2013: How will contractor stabilize laydown yard? Where will topsoil be stockpiled? Is the construction schedule available (as referenced in appendix)? What is the schedule of events for the drainage faciliities (i.e. seepage beds, interceptor swale?). Spoke with Preston at Idaho Sand and Gravel. He said that the laydown yard will be stabilized with 1 ft compacted pit run. The laydown yard will store all the topsoil from the project site and laydown yard area. Idaho Sand and Gravel will be using compacted pit run inside the project to stabilize the access roads, parking areas and working areas adjacent to the buildings. Scheduled to have 60-70% earth work complete this fall and the remaining complete in the spring. Spoke with Brett at Petra to request project schedule. Early tenative project schedule submitted. Brett confirmed topsoil stockpile location. Reviewed requirement with Brett to permit laydown area seperately because its on a different lot. Will forward lease agreement with landowner. See ESC13-00793 for laydown yard
|
Routing - PLANNING | 8/1/2013 | | 8/6/2013 | | PASS |
Josh Wilson
|
|
|
OK for grading/drainage/utility work only
|
Routing - PLAN CHECK | 8/1/2013 | | 8/6/2013 | | PASS |
Alexandra L. DeYoung
|
|
|
|
Routing - PLUMBING | 8/1/2013 | | 8/5/2013 | | PASS |
Bill VanDegrift
|
|
|
use fittings to offset storm drainage lines
|
Routing PW Sewer Design | 8/5/2013 | | 8/5/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 8/1/2013 | | 8/2/2013 | | PASS |
Mike D Hedge
|
|
|
Street lights not on this permit. I will watch for them on the electrical site plan when it comes through.
|
Routing PW Drainage | 8/1/2013 | | 8/2/2013 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 8/1/2013 | | PASS |
|
|
|
per Ron Hill - ok to not take in fees perm Jason B
|
Routing - Addressing | 8/1/2013 | | 8/1/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2013 | | 8/1/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | | 7/29/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2013 9:26AM
|
Plan assigned to (ALR) Alex | 8/1/2013 | | | | |
Alexandra L. DeYoung
|
|
|
|