Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-02073
StatusFinaled
Name RYAN CATHERINE W
Site Address 1109 N 10TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the remodel of an existing 1912s.f. 2-story single family dwelling in the R-2HD zone with DRH waived by Matt Halitsky. the project is to include the reconfiguration of the basement area that will include a utility, storage,1-bathroom and 1-bedroom with neww egress window. The relocation of the furnace and required ducting also included in the project. Separate electrical, plumbing and mechanical permits are required. All per the approved plans as marked, energy prescriptive method and the planreview notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/28/20143/31/20143/31/2014APASS
DetailsTony Young
Kevin Phone #: ###-####
DOC - Permit Finaled3/31/20143/31/20143/31/2014PPASS
DetailsTony Young
BLD-Framing/Rough-in12/5/201312/6/201312/6/2013APASS
DetailsJim Sly
kevin Phone #: ###-####
Frame and energy....OK.
BLD-Framing/Rough-in11/26/201312/2/201312/2/2013APART
DetailsTony Young
Kevin McTeague Phone #: ###-####,, OK TO START FOAM INSULATION,, NEEDS A MECH PERMIT FOR DUCTING,, VENTS
Telephone call  11/21/2013 DONE
Received call from Kenin M. discussed requirements for if separating toilet room from bathroom. (aded fan required) ok to use chapter R303 for adjoining rooms. 11-21-2013
BLD-Framing/Rough-in10/31/201310/31/201310/31/2013PNR
DetailsTony Young
Kevin Phone #: ###-####,, conf only,, ok so far
Application received 7/30/20137/30/2013 DONE
DetailsBarbara Stitt
Routing Walk-In (Zoning)7/30/20137/30/20137/30/2013APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)7/30/20137/30/20137/30/2013ADONE
DetailsPerry Paine
Plan assigned to (PEP)7/30/20137/30/20137/30/2013 PASS
DetailsPerry Paine
Case Summary (BLD)  7/30/2013  
Inspection Record Card- Bld  7/30/2013  
1st review completed  7/30/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/30/2013 DONE
Permit Ready to Issue  7/30/2013 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  7/30/2013 DONE
DetailsBarbara Stitt