Permit Information
Permit NumberBLD13-02077
StatusFinaled
Name TAHOE HOMES LLC
Site Address 2974 E HEARTLEAF LN
Project Name 
Customer Number 
ePlanReviewNo
Description
**WUI ZONE 'B" with WUI ZONE "A" REQUIREMENTS** To construct a new 2436s.f. 3-bedroom, 2-3/4/bath 2-story single family dwelling with 1106s.f. on the main level wit a 3/4 bathroom, there is 1330s.f. on the upper level with 2-bathrooms and 3-bedrooms, this level extends over the 629s.f. 2-car garage with shop area. A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. R-1C / R-2D ok per David Moser. All per the approved plans, REScheck, Manual J & D report; ESC plan requirements; engineering details with engineer's calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/5/20145/6/20145/6/2014APASS
DetailsJim Storey
garage code is 5032 Phone #: ###-#### >> Inspection requested via web by Clint Wall
DOC - Permit Finaled5/6/20145/6/20145/6/2014PPASS
DetailsJim Storey
BLD-Blower Door Test Results5/6/20145/6/20145/6/2014PDONE
DetailsJim Storey
2.9garage code is 5032 Phone #: ###-#### >> Inspection requested via web by Clint Wall
PubWorks Occupancy Approval5/2/20145/2/20145/2/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance1/8/20141/9/20141/9/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in1/6/20141/7/20141/7/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Other12/27/201312/30/201312/30/2013APASS
DetailsJim Storey
clint Phone #: ###-#### - fire soffit and can
BLD-Wall Bracing12/16/201312/16/201312/16/2013PPASS
DetailsJim Storey
joey Phone #: ###-#### exterior ok as well as soffit west side gyp.
BLD-Foundation11/26/201311/26/201311/26/2013PPASS
DetailsJim Storey
alvaro Phone #: ###-####
BLD-Footing11/25/201311/26/201311/26/2013APASS
DetailsJim Storey
ALBARO Phone #: ###-####
BLD-Footing11/21/201311/22/201311/22/2013ACANC
DetailsJim Storey
request 12 (Anton will be at the gym at 7:30pm on thursday to be your workout buddy) Anton Phone #: ###-#### 11-22-13 Alvaro called to cnacel this inspection ///dld
BLD-Footing11/21/201311/21/201311/21/2013PCANC
DetailsJim Storey
Avardo Phone #: ###-####
PubWorks Subgrade Approval11/19/201311/19/201311/19/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  10/30/2013 DONE
OVERRIDE  8/13/2013  
Inspection Record Card- Bld  8/13/2013 DONE
DetailsChristina Prado
Telephone call  8/13/2013 DONE
DetailsTisha Gallop
called Tahoe Homes and left vm permit is ready and fee.
Permit Ready to Issue  8/13/2013 DONE
DetailsTisha Gallop
Plan assigned to (AJS)7/30/20137/30/20138/12/2013 DEFR
DetailsAdele J Schaffeld-Griffin
Due 8/16 Hillside
Routing - PLAN CHECK  8/12/2013 PASS
DetailsAdele J Schaffeld-Griffin
Routing - FIRE8/12/2013 8/12/2013 PASS
DetailsScott Arellano
No comments.
Routing - PLAN CHECK8/12/2013 8/12/2013 PASS
DetailsPerry Paine
1st review completed  8/12/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/12/2013 DONE
Case Summary (BLD)  8/12/2013  
Routing - Erosion and Sediment8/8/2013 8/9/2013 PASS
DetailsKimberly M. Johnson
Routing - MECHANICAL8/2/2013 8/8/2013 PASS
DetailsTroy James
Route to Impact Fee Review7/30/20138/2/20138/2/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING8/2/2013 8/2/2013 PASS
DetailsDavid Moser
Routing - PUBLIC WORKS  8/2/2013 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside  8/1/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit a letter approving the site grading and drainge must be recieved by the project engineer and the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - Addressing  8/1/2013 PASS
DetailsJason C. Taylor
Application received 7/30/20137/31/2013 DONE
Plans ACCEPTED BY PLAN TECH  7/30/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/30/2013 DONE
DetailsTisha Gallop
Intake Approval  7/30/2013 PASS
DetailsTisha Gallop