BLD-Final | 4/11/2014 | 4/11/2014 | 4/11/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 4/11/2014 | 4/11/2014 | 4/11/2014 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 4/11/2014 | 4/11/2014 | 4/11/2014 | P | DONE |
Jim Storey
|
|
|
3.6
|
BLD-Final | 4/10/2014 | 4/11/2014 | 4/11/2014 | A | CANC |
Jim Storey
|
|
|
Please call Clint ###-#### if there are issues. Phone #: ###-#### >> Inspection requested via web by Leonard Dooms Inspection cancelled from web by: Clint Wall
|
Routing PW Grading-Hillside | 4/10/2014 | | 4/10/2014 | | PASS |
Jim Wyllie
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department.
|
BLD-Energy code compliance | 2/4/2014 | 2/7/2014 | 2/7/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Other | 1/24/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Jim Storey
|
|
|
Fire rated soffits - Clint Phone #: ###-####
|
Plan Modification Accepted | | | 1/17/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 1/17/2014 | | 1/17/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Other | 1/13/2014 | 1/14/2014 | 1/14/2014 | P | PASS |
Jim Storey
|
|
|
Fire sofit and fire can inspection-Clint Phone #: ###-####
|
BLD-Wall Bracing | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PASS |
Jim Storey
|
|
|
Joey Phone #: ###-####
|
BLD-Other | 12/20/2013 | 12/20/2013 | 12/20/2013 | P | PASS |
Dave Hannah
|
|
|
joey - shear inspection Phone #: ###-#### ok to cover second floor ext walls
|
BLD-Foundation | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Jim Storey
|
|
|
Ready after 4pm - Anton Phone #: ###-####
|
BLD-Footing | 9/9/2013 | 9/9/2013 | 9/9/2013 | P | PASS |
Jim Storey
|
|
|
Anton Phone #: ###-####
|
PubWorks Subgrade Approval | 9/9/2013 | 9/9/2013 | 9/9/2013 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 8/15/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 8/12/2013 | | |
|
|
|
|
Plan assigned to (PEP) | 8/7/2013 | 8/7/2013 | 8/12/2013 | | DONE |
Perry Paine
|
|
|
Due 8/16 Hillside
|
Routing - PLAN CHECK | 8/12/2013 | | 8/12/2013 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 8/12/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/12/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/12/2013 | | DONE |
Tisha Gallop
|
|
|
called Tahoe Homes and left vm permit is ready and fee
|
Permit Ready to Issue | | | 8/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | | | 8/12/2013 | | PASS |
Perry Paine
|
|
|
|
Routing - FIRE | 8/12/2013 | | 8/12/2013 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 8/8/2013 | | 8/9/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - MECHANICAL | 8/2/2013 | | 8/8/2013 | | PASS |
Troy James
|
|
|
|
Plan assigned to (AJS) | 7/30/2013 | 7/30/2013 | 8/7/2013 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
Due 8/16 Hillside
|
Route to Impact Fee Review | 7/30/2013 | 8/2/2013 | 8/2/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 8/2/2013 | | 8/2/2013 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 7/31/2013 | | 8/2/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 8/1/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit a letter approving the site grading and drainge must be recieved by the project engineer and the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 7/31/2013 | | 8/1/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 7/30/2013 | 7/31/2013 | | DONE |
|
|
|
|
Intake Approval | | | 7/31/2013 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/2013 | | DONE |
Tisha Gallop
|
|
|
|