Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-02080
StatusFinaled
Name TAHOE HOMES LLC
Site Address 3060 E HEARTLEAF LN
Project NameGRAMERCY II
Customer Number 
ePlanReviewNo
Description
**WUI ZONE 'B" with WUI ZONE "A" REQUIREMENTS** To construct a new 2518s.f. three story single family dwelling. There is to be 2 1/2 bathrooms and 3-bedrooms. There is 633s.f. of living space on the main level with 1-bedroom and 1/2 bathroom; 1325s.f. with 1-bedroom and 1-full bathroom on the second level that extende over the 695s.f. 3-car garage; the third level master suite is 1-bedroom with a full bathroom. A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. R-1C / R-2D ok per david Moser. All per the approved plans, REScheck, Manual J & D report; ESC plan requirements; engineering details with engineer's calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/5/20145/6/20145/6/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
DOC - Permit Finaled5/6/20145/6/20145/6/2014PPASS
DetailsJim Storey
BLD-Blower Door Test Results5/6/20145/6/20145/6/2014PDONE
DetailsJim Storey
2.9 Phone #: ###-#### >> Inspection requested via web by Clint Wall
PubWorks Occupancy Approval5/6/20145/6/20145/6/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final5/2/20145/5/20145/5/2014AFAIL
DetailsJim Storey
Clint Phone #: ###-#### need public works/ 311.7.2 lights on stairs
BLD-Energy code compliance2/18/20142/20/20142/20/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in2/18/20142/19/20142/19/2014APASS
DetailsJim Storey
Clint Phone #: ###-####
BLD-Framing/Rough-in2/17/20142/18/20142/18/2014AFAIL
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Other1/21/20141/22/20141/22/2014APASS
DetailsJim Sly
Fire can protection - Clint Phone #: ###-####
BLD-Wall Bracing1/13/20141/14/20141/14/2014APASS
DetailsJim Storey
Joey Phone #: ###-####
BLD-Wall Bracing1/7/20141/8/20141/8/2014APASS
DetailsJim Storey
joey Phone #: ###-####
BLD-Foundation10/10/201310/10/201310/10/2013PPASS
DetailsJim Storey
avarlo Phone #: ###-####
BLD-Footing10/8/201310/8/201310/8/2013PPASS
DetailsJim Storey
late as poss// Wes Phone #: ###-####
PubWorks Subgrade Approval9/30/20139/30/20139/30/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  8/15/2013 DONE
OVERRIDE  8/12/2013  
Plan assigned to (PEP)8/7/20138/7/20138/12/2013 DONE
DetailsPerry Paine
Routing - PLAN CHECK8/12/2013 8/12/2013 PASS
DetailsPerry Paine
1st review completed  8/12/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/12/2013 DONE
Inspection Record Card- Bld  8/12/2013 DONE
Permit Ready to Issue  8/12/2013 DONE
DetailsTisha Gallop
Routing - PLAN CHECK  8/12/2013 PASS
DetailsPerry Paine
Telephone call  8/12/2013 DONE
DetailsTisha Gallop
called Tahoe Homes and left vm permit is ready and fee
Routing - FIRE8/12/2013 8/12/2013 PASS
DetailsScott Arellano
No comments.
Routing - Erosion and Sediment8/8/2013 8/9/2013 PASS
DetailsKimberly M. Johnson
ESC plan waived
Routing - MECHANICAL8/2/2013 8/8/2013 PASS
DetailsTroy James
Plan assigned to (AJS)7/30/20137/30/20138/7/2013 DEFR
DetailsAdele J Schaffeld-Griffin
Due 8/16 Hillside
Route to Impact Fee Review7/30/20138/2/20138/2/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING8/2/2013 8/2/2013 PASS
DetailsDavid Moser
Routing - PUBLIC WORKS7/31/2013 8/2/2013 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside  8/1/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit a letter approving the site grading and drainge must be recieved by the project engineer and the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - Addressing7/31/2013 8/1/2013 PASS
DetailsJason C. Taylor
Application received 7/30/20137/31/2013 DONE
Plans ACCEPTED BY PLAN TECH  7/30/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/30/2013 DONE
DetailsTisha Gallop
Intake Approval  7/30/2013 PASS
DetailsTisha Gallop