Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-02082
StatusFinaled
Name JDM RENOVATION LLC
Site Address 233 N ORCHARD AVE
Project NameMillstream Group
Customer Number`
ePlanReviewNo
Description
(**VANILLA TI**) Permit is to remodel an existing 1,000 square foot office building by upgrading the existing restroom to comply with accessibility requirements and repairing minor damage from flood. Work includes: installation of new plumbing, installation of new drywall where it was removed, new flooring and new interior wall coverings. This building is not Fire Sprinklered. NOTE: an additional permit is required prior to this building being occupied. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/2/201312/18/2013 DONE
Telephone call  12/13/2013 DONE
send values in mail today
Second Notice 11/10/201311/27/2013 DONE
First Notice10/22/201310/22/201310/31/2013 DONE
DetailsTom Arcoraci
BLD-Final10/21/201310/22/201310/22/2013PPASS
DetailsTom Arcoraci
JOSH Phone #: ###-####
DOC - Permit Finaled10/22/201310/22/201310/22/2013PPASS
DetailsTom Arcoraci
FIRE-Final Inspection10/11/201310/14/201310/14/2013APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection10/11/201310/11/201310/11/2013PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference10/4/201310/7/201310/7/2013PDONE
DetailsTroy Cobbley
Josh Phone #: ###-####
BLD-Conference8/9/20138/9/20138/9/2013PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in8/5/20138/5/20138/5/2013PPASS
DetailsTom Arcoraci
josh Phone #: ###-####
Telephone call  8/5/2013 DONE
DetailsChristina Prado
Called Josh to advise permit is ready for pick up and gave fees due
Permit Ready to Issue  8/5/2013 DONE
DetailsChristina Prado
Inspection Record Card- Bld  8/5/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  8/5/2013 DONE
DetailsTisha Gallop
Application received 7/30/20138/2/2013 DONE
Plan assigned to (TLW)7/30/2013 8/2/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/30/2013 8/2/2013 PASS
DetailsTim L. Woodard
1st review completed  8/2/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/2/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/2/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  8/2/2013 DONE
CHANGE STATUS TO (REV)  7/30/2013 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  7/30/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  7/30/2013 DONE
DetailsChristina Prado