Second Notice | | 11/13/2014 | 11/24/2014 | | DONE |
Christina Prado
|
|
|
|
Print Statement | | | 11/24/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 10/5/2014 | 11/3/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | PASS |
Mike Jordan
|
|
|
Curt Phone #: ###-####. Ok for prm. occ.
|
Temporary Occupancy | 8/15/2014 | 11/13/2014 | 8/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
FIRE-Final Inspection | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PASS |
Forrest France
|
|
|
Verified plan resubmittals and previous correction items. Life safety final approved.
|
BLD-Final | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PART |
Mike Jordan
|
|
|
call before// Curt Phone #: ###-####. Ok for temp occ. Needs to install high/low drinking fountain.
|
CHANGE STATUS TO (ISS) | | | 8/1/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 7/31/2014 | | 8/1/2014 | | PASS |
Carl D Madsen
|
|
|
Modification to remove two nonbearing walls from the existing office area. CDM
|
OVERRIDE | | | 7/31/2014 | | |
|
|
|
|
Plan assigned to (CDM) | 7/29/2014 | 7/29/2014 | 7/31/2014 | | PASS |
Carl D Madsen
|
|
|
Plan modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/31/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/31/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/31/2014 | | DONE |
Christina Prado
|
|
|
Caled Curt to advise permit is ready to issue and gave fees due
|
Permit Ready to Issue | | | 7/31/2014 | | DONE |
Christina Prado
|
|
|
|
Plan Modification Accepted | | | 7/29/2014 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for the removal of one wall and add smaller wall in different location in office area; routed to Carl Madsen.
|
FIRE-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the correct door/exit path layout with the desited exit sign arrangement for approval. Also show the new wall being deleted. Install fire extinguisher as discussed.
|
BLD-Conference | 5/12/2014 | 5/13/2014 | 5/13/2014 | A | DONE |
Mike Jordan
|
|
|
Kurt-pleae call for access Phone #: ###-####
|
BLD-Energy code compliance | 2/24/2014 | 2/24/2014 | 2/24/2014 | P | PASS |
Mike Jordan
|
|
|
Curtis Phone #: ###-####
|
BLD-Framing/Rough-in | 2/14/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Mike Jordan
|
|
|
Curt Phone #: ###-####. All framing issues resolved. Ok to insulate.
|
BLD-Framing/Rough-in | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | FAIL |
Mike Jordan
|
|
|
curtis Phone #: ###-####. Airseal pack to be completed prior to framing inspection. Provide additional nailing on 3 ply T03 truss as well as the required 14 SDS screws on 2x6 blocks at both bearing ends. Correction notice posted.
|
BLD-Wall Bracing | 1/8/2014 | 1/9/2014 | 1/9/2014 | A | PASS |
Mike Jordan
|
|
|
Curt Phone #: ###-####. North wall ok to cover.
|
BLD-Other | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PART |
Mike Jordan
|
|
|
curt - shear inspection Phone #: ###-####. Needs to complete the north side of building, connect holddowns, and complete sheathing.
|
BLD-Foundation | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Mike Jordan
|
|
|
JOHN Phone #: ###-####
|
BLD-Foundation | 10/24/2013 | 10/25/2013 | 10/25/2013 | P | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Footing | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. All issues have been resolved.
|
BLD-Footing | 10/25/2013 | 10/25/2013 | 10/25/2013 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. All issues have been resolved. 2500 psi for design, clearance issues resolved. also noted per engineers letter that as built condtion at existing building is acceptable.
|
BLD-Footing | 10/21/2013 | 10/22/2013 | 10/22/2013 | A | FAIL |
Mike Jordan
|
|
|
John MIller Phone #: ###-####. Provide additional chairs on north footing line to provide the min. required clearances. Provide RFI from engineer for change in field conditions for connection to existing footing. Provide specified conc psi to be used and concrete design psi by engineer. Correction notice posted. Also noted ESC issues. No concrete allowed at this time.
|
Issue PAID IN FULL permit | | | 10/4/2013 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 10/1/2013 | | |
|
|
|
|
Routing - PUBLIC WORKS | 9/30/2013 | | 10/1/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 9/30/2013 | | 10/1/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 10/1/2013 | | 10/1/2013 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/1/2013 | | DONE |
|
|
|
|
Telephone call | | | 10/1/2013 | | DONE |
Christina Prado
|
|
|
called Robin to advise permit is ready pending ACHD & RP and gave fees due
|
Permit Ready to Issue | | | 10/1/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 8/2/2013 | 8/2/2013 | 9/30/2013 | | DONE |
Carl D Madsen
|
|
|
First review completed 8-22-13
|
Routing - PLAN CHECK | 8/28/2013 | | 9/30/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/26/2013 | | 9/30/2013 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 9/30/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/30/2013 | | DONE |
|
|
|
|
Routing - Design Review | 9/26/2013 | | 9/26/2013 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Erosion and Sediment | 9/3/2013 | | 9/3/2013 | | PASS |
Jason C. Taylor
|
|
|
See ESC Permit for specific details.
|
Routing - PLANNING | 9/3/2013 | | 9/3/2013 | | FAIL |
Andrea Tuning
|
|
|
The Design Review approval required awnings. The plans do not show the awnings. The applicant should either replace the awnings or modify the DR approval.
|
Routing - PLAN CHECK | 9/3/2013 | | 9/3/2013 | | FAIL |
Carl D Madsen
|
|
|
E-Mailed Robin and called. CDM
|
Plan resubmittals received | | | 8/29/2013 | | |
|
|
|
8-29-13 received 2 copies of sheets A0.0,A0.1,A0.2,A2.1,A2.2,A4.0,A5.0,A6.0,A6.1 sent to Carl M
|
Routing - FIRE | 8/22/2013 | 8/22/2013 | 8/28/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
1st review completed | | | 8/28/2013 | | FAIL |
|
|
|
Failed Plan check and PW.
|
Route to Impact Fee Review | 8/22/2013 | 8/27/2013 | 8/26/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 8/1/2013 | 8/6/2013 | 8/26/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 8/7/2013 | | 8/22/2013 | | FAIL |
Carl D Madsen
|
|
|
E-Mailed Plan review report to Robin 8-22-13 CDM
|
Routing - PLUMBING | 8/7/2013 | | 8/7/2013 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 8/7/2013 | | 8/7/2013 | | PASS |
Andrea Tuning
|
|
|
DRH13-212 Andrea
|
Routing - Erosion and Sediment | 8/6/2013 | | 8/7/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Notified Robin Gates and Michael Kingsley via email. Included as attachments the ECP template and ECP checklist
|
Routing PW Drainage | 8/5/2013 | | 8/6/2013 | | FAIL |
Brian Murphy
|
|
|
NEED IDWR OK ON SHALLOW INJECTION WELL WASH PAD
|
Routing - PUBLIC WORKS | 8/2/2013 | | 8/6/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | | | 8/5/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 8/5/2013 | | 8/5/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 8/1/2013 | | 8/2/2013 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 8/1/2013 | 8/1/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 8/1/2013 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 8/1/2013 | | | | |
John Menard
|
|
|
|