BLD-Final | 5/1/2014 | 5/2/2014 | 5/2/2014 | A | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-#### call garage code if not there
|
DOC - Permit Finaled | 5/2/2014 | 5/2/2014 | 5/2/2014 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Temp Occupancy Appr | 5/2/2014 | 5/2/2014 | 5/2/2014 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Conference | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | DONE |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
BLD-Energy code compliance | 12/3/2013 | 12/4/2013 | 12/5/2013 | P | PASS |
Dave Hannah
|
|
|
As late as possible please *Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 12/2/2013 | 12/2/2013 | 12/3/2013 | P | PART |
Dave Hannah
|
|
|
josh PLEASE call before going out Phone #: ###-#### ok to insulate needs fire blocking and two scabs on trusses
|
BLD-Wall Bracing | 12/2/2013 | 12/2/2013 | 12/3/2013 | P | PASS |
Dave Hannah
|
|
|
josh PLEASE call before going out Phone #: ###-####
|
Plan Modification Accepted | | | 12/2/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 12/2/2013 | | 12/2/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Framing/Rough-in | 11/26/2013 | 11/27/2013 | 11/27/2013 | P | NR |
Tony Young
|
|
|
Josh Phone #: ###-####,, c/n on back of permit card,, walk through conf only,, need mech pass,, do not insulate
|
BLD-Wall Bracing | 11/26/2013 | 11/27/2013 | 11/27/2013 | P | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, renail per plan
|
BLD-Foundation | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PASS |
Dave Hannah
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 9/18/2013 | 9/19/2013 | 9/19/2013 | P | PASS |
Dave Hannah
|
|
|
MANA Phone #: ###-####
|
PubWorks Subgrade Approval | 9/19/2013 | 9/19/2013 | 9/19/2013 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/17/2013 | 9/18/2013 | 9/18/2013 | P | NR |
Dave Hannah
|
|
|
Mana Phone #: ###-#### no inspection done need geo tect sign off
|
BLD-Foundation | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Dave Hannah
|
|
|
Requests around 2/basement wall - Mana Phone #: ###-####
|
BLD-Footing | 8/30/2013 | 9/3/2013 | 9/3/2013 | A | PASS |
Dave Hannah
|
|
|
mana Phone #: ###-####
|
PubWorks Subgrade Approval | 9/3/2013 | 9/3/2013 | 9/3/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer. Building department may be scheduled for footing inspections. Jason Taylor ###-####. Note: Check ESC Requirements for pre construction meeting, make sure BMP's are installed as I gave a verbal warning on Aug 29th.
|
BLD-Footing | 8/30/2013 | 8/30/2013 | 8/30/2013 | P | CANC |
Dave Hannah
|
|
|
mana Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/26/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/23/2013 | | |
|
|
|
|
Application received | | 8/2/2013 | 8/23/2013 | | DONE |
|
|
|
|
Plan assigned to (AJS) | | 8/2/2013 | 8/23/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 8/21 Hillside
|
Routing - PLAN CHECK | 8/23/2013 | | 8/23/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING | 8/23/2013 | | 8/23/2013 | | PASS |
David Moser
|
|
|
|
Case Summary (BLD) | | | 8/23/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/23/2013 | | DONE |
Tisha Gallop
|
|
|
called Roth Homes and them permit is ready and fee.
|
Permit Ready to Issue | | | 8/23/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 8/22/2013 | | |
|
|
|
Received 2 copies of revised calcs, 2 copies of sheets A-1, A-2, A-3, A-4, S-0, S-1, S-2, S-3, E-1, E-2 and taken to Adele's desk
|
Routing - PLAN CHECK | 8/14/2013 | | 8/19/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see plan review letter in documents emailed 8/19/13
|
1st review completed | | | 8/19/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 8/19/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
met with Jason about detailed cost of home submitted. Rita adjusted fee based of itimized porject cost submitted by Roth Homes.
|
Routing - FIRE | 8/14/2013 | 8/2/2013 | 8/14/2013 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 8/9/2013 | | 8/13/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - MECHANICAL | 8/5/2013 | | 8/9/2013 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/2/2013 | 8/7/2013 | 8/5/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 8/5/2013 | | 8/5/2013 | | FAIL |
David Moser
|
|
|
The appeal period is not over yet. It will end on August 12, 2013
|
Routing - Addressing | 8/2/2013 | | 8/5/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 8/5/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 8/5/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/2/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2013 | | |
Christina Prado
|
|
|
|