Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD13-02149
StatusFinaled
Name THE CHRISTENSEN CORPORATION
Site Address 950 W BANNOCK ST Unit: 250
Project NameBanner Bank Ste # 250
Customer Number 
ePlanReviewYes
Description
(BROWN AND CALDWELL - BANNER BANK BUILDING - STE 250) This building is required to be fire sprinklered because it is a high-rise. To create a 6,531 square foot office tenant space on the 2nd story of an existing high-rise building by combining spaces #250 (BLD09-01788) and #260 (BLD06-01773). Work is to include: removal of nordwall demountable partitions, revise existing rated corridor door to swing out, installation of new exit signs / emergency lighting, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Third Notice 4/6/20144/3/2014 DONE
follow up // received 3-20-14 in permit e-mail acct
Third Notice 3/9/20144/1/2014 DONE
mailed with letter
Third Notice 2/8/20143/4/2014 DONE
faxed
Third Notice 12/29/20132/3/2014 DONE
faxed
Second Notice 11/10/201312/24/2013 DONE
DetailsChristina Prado
mailed 12-26-13
First Notice 10/11/201310/31/2013 DONE
Faxed 10-31-13
BLD-Final9/30/201310/1/201310/1/2013PPASS
DetailsDave Hannah
Call prior to going Phone #: 8415809 >> Inspection requested via mobile web by Mike
BLD-Framing/Rough-in9/30/201310/1/201310/1/2013PPASS
DetailsDave Hannah
Call prior to going Phone #: 8415809 >> Inspection requested via mobile web by Mike
FIRE-Final Inspection9/30/201310/1/201310/1/2013APASS
DetailsForrest France
Fire life safety inspection completed acceptable.
Permanent Occupancy  10/1/2013 DONE
Permit Ready to Issue  9/30/2013 DONE
Print Occupancy Form  9/30/2013 DONE
Issue PAID IN FULL permit  9/30/2013 DONE
Intake Approval  8/9/2013 PASS
DetailsTim L. Woodard
Plan assigned to (TLW)8/9/2013 8/9/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK8/9/2013 8/9/2013 PASS
DetailsTim L. Woodard
1st review completed  8/9/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/9/2013 DONE
DetailsTim L. Woodard
Application received  8/6/2013 DONE
Application submitted via PDS Online on Aug 6 2013 3:34PM