BLD-Final | 1/7/2015 | 1/8/2015 | 1/8/2015 | A | PASS |
Jim Storey
|
|
|
Please call for access 30min - Aubrey Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | PASS |
Jim Sly
|
|
|
aubrey - please call 1/2 hr prior Phone #: ###-#### Wall and ceiling insulation....OK.
|
Routing - MECHANICAL | 1/28/2014 | | 1/28/2014 | | PASS |
Troy James
|
|
|
|
BLD-Energy code compliance | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Jim Storey
|
|
|
call 15 min before to meet // Aubrey Phone #: ###-####
|
BLD-Wall cover | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | CANC |
Jim Storey
|
|
|
Aubrey-Please call prior to inspection-Caulking and cover insepction please Phone #: ###-####
|
BLD-Wall Bracing | 10/10/2013 | 10/11/2013 | 10/11/2013 | P | PASS |
Jim Storey
|
|
|
Requesting 4 - Aubrey Phone #: ###-#### exterior ok to cover.
|
BLD-Foundation | 9/12/2013 | 9/12/2013 | 9/12/2013 | P | PASS |
Jim Storey
|
|
|
mana Phone #: ###-####
|
PubWorks Subgrade Approval | 9/11/2013 | 9/11/2013 | 9/11/2013 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PASS |
Jim Storey
|
|
|
mana Phone #: ###-####
|
Routing Walk-In (BLD) | 8/19/2013 | 8/19/2013 | 8/19/2013 | P | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 8/19/2013 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/19/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/19/2013 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2013 | | DONE |
|
|
|
With Mr. Smith on the requirements for engineering on foundations. Bob arnold verified that soils are ok..still need engineering for foundation along with subgrade inspection. Informed Jason Taylor of conversation. 8-13-2013 4:40p.m.
|
Routing Walk-In (Zoning) | 8/9/2013 | 8/9/2013 | 8/9/2013 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 8/9/2013 | 8/9/2013 | 8/9/2013 | A | FAIL |
Perry Paine
|
|
|
need foundation engineering and esc plan waiver request
|
1st review completed | | | 8/9/2013 | | FAIL |
|
|
|
need foundation engineering and esc plan waiver request
|
Application received | | 8/9/2013 | | | |
|
|
|
|