Permit Information
Permit NumberBLD13-02185
StatusFinaled
Name CANYON CREST HOMES
Site Address 4273 N ARROW VILLA WAY
Project Namelot 29 Block 1 Eyrie Canyon #6
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3112 sq. ft., two story (first story 2680 sq. ft.)., (second story 432 sq. ft.) single family dwelling with 4 bedrooms, and (2) full baths & 2 1/2 baths, approximately 141 sq. ft. of covered patio/porch and a 758 sq. ft. garage per the approved plans, plan review report, attached engineering and any notations. A-1 zoning and setbacks per planning. CDM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/13/2016 DONE
BLD-Blower Door Test Results4/25/20144/28/20144/28/2014PPASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by David Wipper
BLD-Final4/25/20144/28/20144/28/2014PPASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by David Wipper
DOC - Permit Finaled4/28/20144/28/20144/28/2014PPASS
DetailsTony Young
c of o issued
BLD-Final4/24/20144/25/20144/25/2014APASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by David Wipper
PubWorks Occupancy Approval4/25/20144/25/20144/25/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance11/7/201311/8/201311/8/2013PPASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Dan Geis
BLD-Framing/Rough-in11/5/201311/6/201311/6/2013PFAIL
DetailsTom Arcoraci
Should pass HVAC inspection in the AM Phone #: ###-#### >> Inspection requested via web by Dan Geis cn posted
BLD-Other11/5/201311/5/201311/5/2013APASS
DetailsTony Young
Drywall Soffits inspection Phone #: ###-#### >> Inspection requested via web by Dan Geis
BLD-Wall Bracing10/10/201310/11/201310/11/2013PPASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Dan Geis
BLD-Footing9/10/20139/11/20139/11/2013APART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing9/10/20139/10/20139/10/2013PNR
DetailsTony Young
BLD-Conference9/6/20139/9/20139/9/2013PPART
DetailsTony Young
This is for the erosion control inspection Phone #: ###-#### >> Inspection requested via web by David Wipper
PubWorks Subgrade Approval9/5/20139/5/20139/5/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
Issue PAID IN FULL permit  9/4/2013 DONE
OVERRIDE  9/3/2013  
Plan assigned to (CDM)8/14/20138/14/20139/3/2013 PASS
DetailsCarl D Madsen
ePlanReview First review completed
Telephone call  9/3/2013 DONE
DetailsTisha Gallop
called David Wipper (applicant) and left vm if want permit e-mailed or going to come in to issue permit.
PLANS/APPL TAKEN TO FRONT DESK  9/3/2013 DONE
Inspection Record Card- Bld  9/3/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  9/3/2013 DONE
DetailsChristina Prado
Routing - MECHANICAL8/30/2013 8/30/2013 PASS
DetailsTroy James
1st review completed  8/27/2013 FAIL
Routing - PLAN CHECK8/14/2013 8/27/2013 PASS
DetailsCarl D Madsen
ePlanReview
Routing - MECHANICAL8/14/2013 8/19/2013 FAIL
DetailsTroy James
eplan
Routing - FIRE8/14/20138/14/20138/15/2013 PASS
DetailsScott Arellano
No comments.
Routing PW Grading-Hillside8/14/2013 8/15/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Routing - Erosion and Sediment8/14/2013 8/15/2013 PASS
DetailsKimberly M. Johnson
Does not meet EPA SWPPP requirements. Approved per redlines
Payment Received  8/14/2013 DONE
Payment received via Govolutions
Route to Impact Fee Review8/14/20138/19/20138/14/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING8/14/2013 8/14/2013 PASS
DetailsJoshua Johnson
Routing - Addressing8/14/2013 8/14/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/14/2013 8/14/2013 PASS
DetailsBeverly Mountain
Application received  8/12/2013 DONE
Application submitted via PDS Online on Aug 12 2013 12:01PM