BLD-Aging Inspection | 6/19/2020 | 6/19/2020 | 6/25/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 3/10/2020 | 3/24/2020 | 3/24/2020 | P | NR |
Dave Hannah
|
|
|
Mark Phone #: ###-#### still needs pw
|
BLD-Final | 3/6/2020 | 3/10/2020 | 3/10/2020 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Final | 2/25/2020 | 3/3/2020 | 3/6/2020 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Final | 2/19/2020 | 2/21/2020 | 2/25/2020 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok pending PW hillside approval
|
BLD-Final | 2/12/2020 | 2/13/2020 | 2/19/2020 | A | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Final | 2/6/2020 | 2/12/2020 | 2/14/2020 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Final | 1/31/2020 | 2/4/2020 | 2/6/2020 | A | PART |
Tony Young
|
|
|
Mark Phone #: ###-####// got ok from Ron Johnson (fire) that drive is ok for now due to house is fully sprinklered and hard pack on sand and proximity on home// still needing final bond on revegitation approval from PW
|
BLD-Final | 1/29/2020 | 1/31/2020 | 1/31/2020 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok pending hillside
|
BLD-Conference | 1/22/2020 | 1/24/2020 | 1/24/2020 | P | PART |
Tony Young
|
|
|
Marc; Phone #: ###-####//./ walk through on final
|
BLD-Aging Inspection | 12/13/2019 | 12/13/2019 | 12/19/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Tony Young
|
|
|
status// work in progress,, ok
|
BLD-Aging Inspection | 7/26/2019 | 7/26/2019 | 8/1/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Tony Young
|
|
|
dry wall- Paul Phone #: ###-####,, garage interior drywall
|
BLD-Wall cover | 3/11/2019 | 3/13/2019 | 3/13/2019 | A | PART |
Tony Young
|
|
|
dry wall- Paul Phone #: ###-####,, work in progress on garage walls,, using glue and screws
|
Meeting | | | 3/6/2019 | | DONE |
|
|
|
as per Randy Hemmer-taking his name off the permit and has a letter stating it is now in the parcel owners name-see attached
|
Telephone call | | | 3/6/2019 | | DONE |
|
|
|
called parcel owenrs to let know they are the GC now since Randy Hemmer Const. is no longer the GC-told Jennifer (parcel owner) that she will be the GC and if she hires a new GC they will need to to fill out the 302 form and pay a transfer fee
|
BLD-Aging Inspection | 11/21/2018 | 11/21/2018 | 11/26/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/20/2018 | 11/20/2018 | 11/26/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, soffit ?s,, general walk through
|
BLD-Conference | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PART |
Tony Young
|
|
|
Mark- for the building barbeque setback requirements for combustible services Phone #: ###-####,, per manf specs
|
BLD-Framing/Rough-in | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Tony Young
|
|
|
Pool mec room framing - Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PART |
Tony Young
|
|
|
framing for outdoor pool bathroom // Mark Phone #: ###-####,, ok pending trades
|
BLD-Conference | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, general ?s,, ok to frame walls in pool bath area
|
BLD-Conference | 4/18/2018 | 4/18/2018 | 4/19/2018 | P | PASS |
Tony Young
|
|
|
Mark Ludlow Phone #: ###-####,, hand rail ?s
|
BLD-Conference | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, walk through
|
BLD-Aging Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/19/2016 | 5/19/2016 | 5/20/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/5/2016 | 1/6/2016 | 1/6/2016 | P | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, all ok to cover pending trades approval,, draft stops in place
|
BLD-Energy code compliance | 12/9/2015 | 12/10/2015 | 12/10/2015 | A | PART |
Mike Jordan
|
|
|
Tod Phone #: ###-####. Work in progress, basement. Also reviewed draft stop locations.
|
BLD-Framing/Rough-in | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PART |
Mike Jordan
|
|
|
Todd Phone #: ###-####. BAsement and main level. Needs to complete airseal pack, draftstopping and fireblocking.
|
BLD-Footing | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | PASS |
Jim Storey
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, upper level ok to cover
|
BLD-Framing/Rough-in | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, upper floor ok to insulate
|
BLD-Framing/Rough-in | 9/1/2015 | 9/2/2015 | 9/2/2015 | P | CANC |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
PubWorks Subgrade Approval | 9/2/2015 | 9/2/2015 | 9/2/2015 | | DONE |
Jason C. Taylor
|
|
|
***STORAGE AREA***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 8/24/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 8/19/2015 | 8/19/2015 | 8/24/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/19/2015 | | 8/24/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
500 SQ FOOT STORAGE ROM WITH DECK
|
Case Summary (BLD) | | | 8/24/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/24/2015 | | DONE |
|
|
|
Spoke with Randy informing him that the plans are ready to be picked up. Informed him we would need a revised value since sq ft have been added on.
|
Permit Ready to Issue | | | 8/24/2015 | | DONE |
|
|
|
DON NOT REISSUE PLAN MOD **NEED A REVISED CERT OF VALUE SINCE SQFT WAS ADDED TO THE HOME**
|
Inspection Record Card- Bld | | | 8/24/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/24/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/24/2015 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/19/2015 | | DONE |
|
|
|
Storage under outdoor patio. Routed to Adele
|
BLD-Conference | 7/1/2015 | 7/2/2015 | 7/2/2015 | P | DONE |
Dave Hannah
|
|
|
Todd Phone #: ###-#### thy have to install fire place as per manufacture aslo specker 1 hr boxs in soffits ok
|
CHANGE STATUS TO (ISS) | | | 6/5/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/4/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 6/3/2015 | 6/3/2015 | 6/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Orion CT Plan Modification
|
Routing - PLAN CHECK | 6/4/2015 | | 6/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan modification for basement gaming area. adding 308 sq ft
|
Routing - MECHANICAL | 6/3/2015 | | 6/4/2015 | | PASS |
Troy James
|
|
|
Plan mod with manual j changes. Emailed approved report to applicant.
|
Plan Reviewer's activity | | | 6/4/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
recieved engineer approval of steel shop drawings 6/3/15
|
Case Summary (BLD) | | | 6/4/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 6/4/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/4/2015 | | DONE |
|
|
|
please do not re issue-all requirements met
|
Telephone call | | | 6/4/2015 | | DONE |
|
|
|
called Randy to let know plan mod is ready and how much is owed-PLEASE do not re issue
|
Telephone call | | | 6/4/2015 | | DONE |
|
|
|
Left message for Randy informing him that the plans are to be picked up and what the fees are
|
Plan Modification Accepted | | | 6/3/2015 | | DONE |
|
|
|
plan mod received 2 of each sheet A2.0 & S1.1-also 2 struc calcs -took to Adele
|
BLD-Conference | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, outdoor kitchen area soffit light boxes ok,, verify with TJI on headered out boxes
|
BLD-Conference | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PASS |
Tony Young
|
|
|
Tod Phone #: ###-####,, upper soffit light boxes ok
|
BLD-Conference | 11/21/2014 | 11/26/2014 | 12/1/2014 | A | CANC |
Tony Young
|
|
|
Todd Phone #: ###-####-please call to meet
|
BLD-Conference | 11/18/2014 | 11/21/2014 | 11/21/2014 | A | DEFR |
Tony Young
|
|
|
Todd Phone #: ###-####-please call to meet
|
BLD-Conference | 11/13/2014 | 11/18/2014 | 11/18/2014 | A | DEFR |
Tony Young
|
|
|
Todd Phone #: ###-####-please call to meet
|
BLD-Conference | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | DEFR |
Tony Young
|
|
|
Todd Phone #: ###-####-please call to meet
|
BLD-Conference | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PART |
Tony Young
|
|
|
Todd Phone #: ###-####-please call to meet,, wants to insulate a triple wall area cavity in the stair,, ok,, no trades involved
|
BLD-Foundation | 8/19/2014 | 8/20/2014 | 8/20/2014 | A | PASS |
Phil Shearer
|
|
|
Bob Phone #: ###-####
|
BLD-Footing | 8/7/2014 | 8/8/2014 | 8/8/2014 | A | PASS |
Phil Shearer
|
|
|
late AM // Bob Phone #: ###-#### plainter footing
|
PubWorks Subgrade Approval | 6/16/2014 | 6/16/2014 | 6/16/2014 | | DONE |
Jason C. Taylor
|
|
|
*POOL RETAINING WALL PLANTER FOOTING ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
BLD-Wall Bracing | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, exterior ok to cover
|
BLD-Wall Bracing | 4/16/2014 | 4/17/2014 | 4/17/2014 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, exterior shear ok
|
BLD-Wall Bracing | 4/15/2014 | 4/16/2014 | 4/16/2014 | P | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, 90% done,,, will come back in am
|
BLD-Other | 4/7/2014 | 4/7/2014 | 4/7/2014 | P | PART |
Tony Young
|
|
|
Last pool retaining wall - Bob Phone #: ###-####
|
BLD-Footing | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | PART |
Tony Young
|
|
|
BOB Phone #: ###-####,, PENDING SPECIAL INSPECTION REPORT
|
BLD-Footing | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | NR |
Tony Young
|
|
|
bob Phone #: ###-####
|
PubWorks Subgrade Approval | 3/27/2014 | 3/27/2014 | 3/27/2014 | | DONE |
Jason C. Taylor
|
|
|
*POOL RETAINING WALL FOOTING ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
BLD-Foundation | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, retaining wall ok
|
BLD-Footing | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | PART |
Tony Young
|
|
|
Retaining wall - Bob Phone #: ###-####,, south west upper wall ftgs ok
|
PubWorks Subgrade Approval | 2/20/2014 | 2/20/2014 | 2/20/2014 | | DONE |
Jason C. Taylor
|
|
|
*Middle Retaining wall south side ONLY*. A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 2/18/2014 | 2/19/2014 | 2/19/2014 | P | PEND |
Tony Young
|
|
|
Retaining wall - Bob Phone #: ###-####,, need soils approval
|
BLD-Foundation | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PART |
Tony Young
|
|
|
bob -pour after lunch Phone #: ###-####,, S.I. on site
|
BLD-Footing | 1/31/2014 | 2/3/2014 | 2/3/2014 | A | PART |
Tony Young
|
|
|
bob Phone #: ###-####,, west side crawl area,,ok to pour if using cold weather provisions
|
BLD-Footing | 1/30/2014 | 1/31/2014 | 1/31/2014 | P | PART |
Tony Young
|
|
|
bob Phone #: ###-####,, work in progess,, will cover forms and heat then pour Monday
|
PubWorks Subgrade Approval | 1/31/2014 | 1/31/2014 | 1/31/2014 | | DONE |
Jason C. Taylor
|
|
|
*MAIN ENTRANCE, OFFICE, & MASTER BEDROOM ONLY*. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 1/22/2014 | 1/24/2014 | 1/24/2014 | A | PASS |
Tom Arcoraci
|
|
|
retaining wall // Bob Phone #: ###-####
|
BLD-Foundation | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | PASS |
Tony Young
|
|
|
bob Phone #: ###-####,, garden seperation 2'9" wall ok
|
BLD-Footing | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
PubWorks Subgrade Approval | 1/21/2014 | 1/21/2014 | 1/21/2014 | | DONE |
Jason C. Taylor
|
|
|
*GARAGE, GUEST ROOM, AND MASTER RETAINING WALL ONLY**** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 1/15/2014 | 1/17/2014 | 1/17/2014 | A | PEND |
Mike Jordan
|
|
|
bob Phone #: ###-####. Rebar ok. Needs subgrade approval from public works. No concrete is allowed at this time.
|
PubWorks Subgrade Approval | 1/17/2014 | 1/17/2014 | 1/17/2014 | | DONE |
Jason C. Taylor
|
|
|
*POOL RETAINING WALL AND PATIO DIVIDING WALLONLY* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 1/8/2014 | 1/9/2014 | 1/9/2014 | A | PART |
Tony Young
|
|
|
bob Phone #: ###-####,, retaing walls ok,,, work in progress
|
BLD-Foundation | 12/30/2013 | 1/2/2014 | 1/2/2014 | A | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, north garage and east portion of basement walls,, ok,, special inspector to be on site,, cold weather provisions in effect
|
BLD-Footing | 12/18/2013 | 12/18/2013 | 12/18/2013 | P | PART |
Tony Young
|
|
|
lte afternoon - bob Phone #: ###-####,, garage ftgs.. w. in progress
|
BLD-Footing | 12/13/2013 | 12/16/2013 | 12/16/2013 | A | PASS |
Jim Storey
|
|
|
bob please call before going out Phone #: ###-####
|
BLD-Footing | 12/6/2013 | 12/9/2013 | 12/9/2013 | A | PEND |
Tony Young
|
|
|
Mud scheduled for 11-Bob Phone #: ###-####,, too cold to pour
|
BLD-Footing | 12/5/2013 | 12/6/2013 | 12/6/2013 | A | CANC |
Tony Young
|
|
|
Mud scheduled for 11-Bob Phone #: ###-####
|
BLD-Foundation | 11/14/2013 | 11/14/2013 | 11/14/2013 | P | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, tall walls,, work in progress
|
BLD-Footing | 10/18/2013 | 10/21/2013 | 10/21/2013 | A | PEND |
Tony Young
|
|
|
Bob-mid morning Phone #: ###-####,, pending special inspection reports
|
BLD-Footing | 10/17/2013 | 10/18/2013 | 10/18/2013 | A | PART |
Tony Young
|
|
|
Bob-late morning Phone #: ###-####,, basement footings,, 98 % done,, will have a special inspector on site for the pour on Monday,, 3500 psi concrete
|
PubWorks Subgrade Approval | 10/8/2013 | 10/8/2013 | 10/8/2013 | | DONE |
Jason C. Taylor
|
|
|
*BASEMENT FOOTING ONLY* A letter from the applicant’s geotechnical engineer indicating that the basement footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/1/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 9/30/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 8/13/2013 | 8/13/2013 | 9/30/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 8/30 Hillside 10,000
|
Routing - MECHANICAL | 9/30/2013 | | 9/30/2013 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 9/30/2013 | | 9/30/2013 | | PASS |
Jason C. Taylor
|
|
|
Addendums received for setback requirements.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2013 | | DONE |
|
|
|
|
Telephone call | | | 9/30/2013 | | DONE |
Christina Prado
|
|
|
Called Randy to advise permit is ready pending GC form and gave fees due
|
Permit Ready to Issue | | | 9/30/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 9/27/2013 | | 9/27/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 9/27/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Additional plans submitted | | | 9/26/2013 | | DONE |
Tisha Gallop
|
|
|
received e-mail (scaneed and attached in documens) to include value of retaining walls($39,000) for outdoor kitchen and pool deck which are included in scope of work for this permit.
|
Routing PW Grading-Hillside | 9/17/2013 | | 9/25/2013 | | FAIL |
Jason C. Taylor
|
|
|
Grading plans are approved, Hillside report needs revised to address setbacks. Jason Taylor ###-####.
|
Plan resubmittals received | | | 9/24/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A4.1, A4.2, A4.3, S1.1, S1.2, S2.1, S2.2, S3.1, S4.0, S4.1S4.2, S5.1 and seven sets of plans markedC1.0 as well as one plan review report, two sets of rescheck revisions, site plan, structural response letters, stem wall details, ICC evaluation, eng calcs, retaining wall calcs and landscape plans;taken to Adele for review
|
Routing - MECHANICAL | 9/23/2013 | | 9/23/2013 | | FAIL |
Troy James
|
|
|
emailed correction to Don at heating supply
|
Routing - PLAN CHECK | 9/13/2013 | | 9/20/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see second plan review letter in documents emailed to Trey
|
Plan resubmittals received | | | 9/17/2013 | | DONE |
Christina Prado
|
|
|
received three sets of revised plan sheet marked A5.1; Taken to Adel efor further review
|
Plan resubmittals received | | | 9/13/2013 | | DONE |
Christina Prado
|
|
|
received two sets revised eng calcs, ESC plans, hillside report, special insp statement, roofing details, plan review report, reduced site plan and plans marked ESC, C1.0, A2.0, A2.1, A2.2, A3.1, A3.2, A4.1, A4.2, A4.3, S5.1, A6.1, A6.2, S1.1, S1.2, S2.1, S2.2, S3.1, S4.0. S5.1 & E1.0; Taken to Adele for further review
|
Routing - PLAN CHECK | 8/28/2013 | | 9/3/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed plan review comments 9/3/13
|
1st review completed | | | 9/3/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 8/28/2013 | | 8/28/2013 | | PASS |
Scott Arellano
|
|
|
This structure is required to be fire sprinklered in accordance with NFPA 13D; as per specified plat note #13 of Somerset Ridge #4. A separate fire sprinkler permit will be required.
|
Routing - Erosion and Sediment | 8/20/2013 | | 8/22/2013 | | PASS |
Jason C. Taylor
|
|
|
See ESC permit for specific details.
|
Routing - MECHANICAL | 8/15/2013 | | 8/20/2013 | | FAIL |
Troy James
|
|
|
emailed correction to Don heating supply
|
Routing - PLANNING | 8/15/2013 | | 8/15/2013 | | PASS |
Sue Cummings
|
|
|
X rf: CHF13-25
|
Routing - Addressing | 8/13/2013 | | 8/15/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 8/13/2013 | | 8/15/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Grading-Hillside | 8/13/2013 | | 8/15/2013 | | FAIL |
Jason C. Taylor
|
|
|
Hillside report needs revised, missing retaining wall design/calculations. Jason Taylor ###-####
|
Route to Impact Fee Review | 8/12/2013 | 8/15/2013 | 8/14/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 8/12/2013 | 8/13/2013 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/13/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 8/12/2013 | | PASS |
Tisha Gallop
|
|
|
|