Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02193
StatusFinaled
Name THE CHRISTENSEN CORPORATION
Site Address 950 W BANNOCK ST STE Unit: 807
Project NameBanner Bank Building Ste # 807
Customer Number 
ePlanReviewYes
Description
(INTELLECTUAL VENTURES - BANNER BANK BUILDING - STE 807) This building is required to be fire sprinklered because it is a high-rise. To remodel a 1,852 square foot office tenant space on the 8th story of an existing high-rise. Work is to include: [construction of 4 new offices, a conference room, work/coffee bar, open area using existing demountable wall system], installation of break room sink, relocate lights / ducts only, provide independent switching, installation of new rated glass assembly (no wired glass), and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Second Notice 10/11/201310/3/2013 DONE
This permit finaled on the web by Marva Schwager
First Notice 9/27/201310/1/2013 DONE
BLD-Final9/13/20139/16/20139/17/2013PPASS
DetailsDave Hannah
Phone #: 8415809 >> Inspection requested via mobile web by Mike
Permanent Occupancy  9/17/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection9/12/20139/13/20139/16/2013PPASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
BLD-Framing/Rough-in8/27/20138/28/20138/29/2013APASS
DetailsDave Hannah
As early as possible Phone #: 8415809 >> Inspection requested via mobile web by Mike
Print Occupancy Form  8/26/2013 DONE
Permit Ready to Issue  8/26/2013  
Issue PAID IN FULL permit  8/26/2013 DONE
1st review completed  8/23/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/23/2013 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)8/19/2013 8/23/2013 PASS
DetailsTim L. Woodard
ePlanReview - Level 3 TI
Routing - PLAN CHECK8/19/2013 8/23/2013 PASS
DetailsTim L. Woodard
Routing - FIRE8/19/20138/19/20138/21/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Routing PW Sewer Rating8/19/2013 8/19/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing8/19/2013 8/19/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/19/2013 8/19/2013 PASS
DetailsBeverly Mountain
Pending Assignment by JCB8/19/2013 8/19/2013 DONE
DetailsJason Blais
Intake Approval  8/16/2013 PASS
The intake review was delayed because the application was submitted on Aug. 13 at 4:35 PM just before a 2 day vacation. Application accepted for review after the plan intake review.
Application received  8/12/2013 DONE
Application submitted via PDS Online on Aug 12 2013 3:42PM