FIRE-Conference | 3/17/2014 | 3/17/2014 | 3/17/2014 | P | DONE |
Forrest France
|
|
|
Walkthrough for the remainder of the remodel area at the first floor south half. Discussed project schedule, trade related work, life safety items, etc.
|
BLD-Ceiling Grid Inspection | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | PEND |
Tony Young
|
|
|
nate Phone #: ###-####,, ok pending trades
|
BLD-Wall Bracing | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | PASS |
Tony Young
|
|
|
nate Phone #: ###-####,, bracing interior walls per plan
|
BLD-Framing/Rough-in | 1/30/2014 | 1/30/2014 | 1/30/2014 | P | PART |
Tony Young
|
|
|
nate Phone #: ###-####, need to brace interior walls per plans,, all else ok
|
BLD-Framing/Rough-in | 1/29/2014 | 1/30/2014 | 1/30/2014 | A | PART |
Tony Young
|
|
|
nate Phone #: ###-####,, main floor interior walls ok to cover,, per plan
|
FIRE-Final Inspection | 1/6/2014 | 1/7/2014 | 1/7/2014 | A | PART |
Forrest France
|
|
|
Walkthrough for fire life safety at the second floor and basement levels completed. Noted items needed prior to final include; door hardware per plan review notes at the conference room, post max occupant load sign, repair two exit signs at the second floor, some finishes incomplete at the basement. Discussed existing fire alarm appliances at the first floor.
|
FIRE-Final Inspection | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PART |
Forrest France
|
|
|
Phase one work including the basement and 2nd floor areas as noted.
|
BLD-Ceiling Grid Inspection | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | PART |
Tom Arcoraci
|
|
|
nate basement only Phone #: ###-#### needs elec ok border tiles ok to install
|
BLD-Ceiling Grid Inspection | 12/10/2013 | 12/10/2013 | 12/10/2013 | P | PASS |
Tom Arcoraci
|
|
|
nate Phone #: ###-####
|
BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PART |
Jim Storey
|
|
|
Nate Phone #: ###-#### 2nd floor ok to cover/ basement fire blk ceilling batgroom// remove paper insulation backing/
|
BLD-Framing/Rough-in | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PEND |
Tony Young
|
|
|
Nate Phone #: ###-####
|
Print Occupancy Form | | | 9/24/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/24/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 9/23/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 9/23/2013 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/20/2013 | 8/20/2013 | 9/14/2013 | | PASS |
Carl Westfall
|
|
|
ST LUKE'S CAPITAL CITY FAMILY MEDICINE (20 days - Sept 13) ePlanRevies
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2013 | | DONE |
|
|
|
|
1st review completed | | | 9/13/2013 | | PASS |
|
|
|
Passed in all agencies
|
Routing - PLAN CHECK | 8/20/2013 | | 9/13/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with red lines.
|
Routing - FIRE | 8/20/2013 | 8/20/2013 | 9/4/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Routing - PLUMBING | 8/20/2013 | | 8/23/2013 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 8/20/2013 | | 8/21/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/20/2013 | | 8/21/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 8/20/2013 | | 8/21/2013 | | PASS |
Jason C. Taylor
|
|
|
See ESC permit for conditions of approval.
|
Routing PW Sewer Rating | 8/21/2013 | | 8/21/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 8/21/2013 | | 8/21/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Pending Assignment by JCB | 8/20/2013 | | 8/20/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 8/19/2013 | | PASS |
|
|
|
Plan intake review approved. OK to submit for a permit.
|
Application received | | | 8/13/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2013 9:52AM
|