Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02237
StatusFinaled
Name EDGE BREWERY
Site Address 525 N STEELHEAD WAY
Project NameEDGE BREWERY
Customer Number 
ePlanReviewYes
Description
(EDGE BREWERY) To remodel an existing 14,012 square foot tenant space in an existing warehouse and office building for use as a Production Beer Brewery/Tavern/Restaurant. Work to include: Construct new interior partition walls to create new offices, commercial kitchen, men's and women's accessible restrooms, dining/bar room, brewery, and warehouse; install a new vestibule with new doors and associated exit door hardware; provide new exit signage and emergency egress illumination lighting per plans; related interior finishes in compliance with chapter 8 of the 2009 IBC; mechanical, plumbing, and electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new certificate of occupancy is required to be obtained after all work has been inspected and approved. The maximum occupant load of the Bar/Restaurant room shall be 155 persons and shall be posted in a conspicuous place near the main exit. NOTE: This building is fully fire sprinklered for area increase. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/23/2014 DONE
Print Statement  7/17/2014 DONE
DetailsChristina Prado
Second Notice 6/15/20147/9/2014 DONE
First Notice 5/10/20146/5/2014 DONE
DetailsChristina Prado
Permanent Occupancy  4/30/2014 DONE
DetailsChristina Prado
Zoning Approval4/24/20144/24/20144/24/2014 PASS
DetailsJosh Wilson
Landscaping complete. Bond ok for release.
BLD-Final1/31/20142/3/20142/3/2014APASS
DetailsMike Jordan
marcus Phone #: ###-####. ok for temp. occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection1/31/20142/3/20142/3/2014APASS
DetailsTroy Cobbley
Life safety passed
Temporary Occupancy2/3/20145/4/20142/3/2014 DONE
DetailsDarla L Downs
Zoning Approval Temp2/3/20142/3/20142/3/2014 PASS
DetailsJosh Wilson
90-day temp occ. Bond is in place. JGW
FIRE-Conference1/14/20141/15/20141/15/2014ADONE
DetailsTroy Cobbley
I went over life safety requirements with Marcus, the owner. One additional exit discharge light is needed at the northwest exit door, additional fire extinguishers for the seating area and a K class for the kitchen. It appears that a sprinkler monitoring system is required but its existance on site could not be verified, Marcus is going to follow up. The new kitchen hood suppression system will need to be connected to this fire alarm system as well as a separate permit for the work. The fire sprinkler permit still needs to be finaled and the fire suppression permit needs to be tested and finaled. All other items appear to be ok.
BLD-Conference1/14/20141/15/20141/15/2014ADONE
DetailsMike Jordan
DAVE Phone #: ###-####
BLD-Framing/Rough-in1/15/20141/15/20141/15/2014APASS
DetailsMike Jordan
DAVE Phone #: ###-####
OVERRIDE  9/13/2013  
Plan assigned to (SRZ)8/19/20138/19/20139/13/2013 PASS
DetailsSam Zahorka
1st review completed. ePlanReview - Edge Brewery
Issue PAID IN FULL permit  9/13/2013 DONE
DetailsBarbara Stitt
Print Occupancy Form  9/13/2013 DONE
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  9/13/2013 DONE
DetailsSam Zahorka
Permit Ready to Issue  9/13/2013 DONE
DetailsChristina Prado
Ready pending RP info - owners went to get signed up and will be back in shortly 9/13 11:20AM
Routing - PLANNING9/3/2013 9/12/2013 PASS
DetailsDavid Moser
CZC13-00203 was approved for the new dumpster enclosure.
Routing - FIRE9/3/20139/3/20139/4/2013 PASS
DetailsScott Arellano
Attached plan review report to case.
Routing - PLAN CHECK9/3/2013 9/3/2013 PASS
DetailsSam Zahorka
Routing PW Environmental9/3/2013 9/3/2013 PASS
DetailsWalt Baumgartner
OK, corrections made.
1st review completed  8/29/2013 DONE
DetailsSam Zahorka
Routing - PLANNING8/19/2013 8/29/2013 FAIL
DetailsDavid Moser
David Moser - CUP13-00035
Routing - PLAN CHECK8/19/2013 8/29/2013 FAIL
DetailsSam Zahorka
Routing - FIRE8/19/20138/19/20138/21/2013 FAIL
DetailsScott Arellano
Emailed resubmittal ittem to architect. Attached report to case and plans.
Routing - Erosion and Sediment8/19/2013 8/20/2013 PASS
DetailsJason C. Taylor
ESC Permit and Waiver Request Letter approved. Jason Taylor ###-####
Routing - PLUMBING8/19/2013 8/20/2013 PASS
DetailsBill VanDegrift
plans approved with
1) 120 deg. max hot water to hand sinks and lavs.
2) floor sink P-5 to grease waste per public works review.
3) all floor sinks to be exposed under cabinets.
Routing - Addressing8/19/2013 8/19/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/19/2013 8/19/2013 PASS
DetailsBeverly Mountain
Pending Assignment by JCB8/19/2013 8/19/2013 DONE
DetailsJason Blais
Routing PW Sewer Rating8/19/2013 8/19/2013 PASS
DetailsConnie Baumgartner
Routing PW Environmental8/19/2013 8/19/2013 FAIL
DetailsWalt Baumgartner
Re route floor sink P 5 in kitchen to grease interceptor line
Payment Received  8/16/2013 DONE
Payment received via Govolutions
Intake Approval  8/16/2013 PASS
DetailsJason Blais
Application received  8/15/2013 DONE
Application submitted via PDS Online on Aug 15 2013 1:58PM