First Notice | | 11/14/2014 | 1/2/2015 | | DONE |
|
|
|
|
BLD-Final | 11/3/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Storey
|
|
|
Brady Phone #: ###-####
|
FIRE-Final Inspection | 11/3/2014 | 11/4/2014 | 11/4/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 11/4/2014 | | DONE |
|
|
|
|
BLD-Final | 6/11/2014 | 6/12/2014 | 6/12/2014 | A | PART |
Jim Storey
|
|
|
rick Phone #: ###-#### smoke seal placment/ duchdoor/airline
|
FIRE-Final Inspection | 6/6/2014 | 6/9/2014 | 6/9/2014 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given for the "in-fill" area. Life safety is complete in this area.
|
BLD-Ceiling Grid Inspection | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Jim Storey
|
|
|
Craig Phone #: ###-#### need fire listing 3 hr posted above ceilling
|
Plan resubmittals received | | | 4/15/2014 | | DONE |
|
|
|
received transmittal in two copies of plan sheet A3-10, taking to John Menard
|
BLD-Other | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | PASS |
Jim Storey
|
|
|
fire wall under stairs // Rick Phone #: ###-#### south fire walls ok at stair 1 and 2 nd/ elv. ok/ all interior walls ok to cover.
|
BLD-Other | 3/21/2014 | 3/24/2014 | 3/24/2014 | A | PASS |
Jim Storey
|
|
|
rick - sheet rock - fire wall Phone #: ###-####
|
BLD-Other | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PASS |
Jim Storey
|
|
|
Fire wall insepction--Late morning please-Rick Phone #: ###-#### 2nd floor 5/8 three layer aplacation ok.
|
BLD-Framing/Rough-in | 3/13/2014 | 3/14/2014 | 3/14/2014 | P | PART |
Jim Storey
|
|
|
late afternoon - craig Phone #: ###-#### aming of 3 hr wall and core board ok to start 5/8 gyp.
|
BLD-Energy code compliance | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | PASS |
Jim Storey
|
|
|
craig Phone #: ###-####
|
BLD-Conference | 3/5/2014 | 3/6/2014 | 3/6/2014 | P | PASS |
Jim Storey
|
|
|
rick - about 1 pm please Phone #: ###-####
|
BLD-Conference | 2/13/2014 | 2/14/2014 | 2/14/2014 | A | PASS |
Jim Storey
|
|
|
rick - 10am please Phone #: ###-#### reviewed 3 hr wall location and assembly type.
|
BLD-Concrete | 11/25/2013 | 11/26/2013 | 11/26/2013 | A | PASS |
Jim Storey
|
|
|
RICK Phone #: ###-#### placed w/si
|
BLD-Footing | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | PASS |
Jim Storey
|
|
|
RICK - REBAR Phone #: ###-#### pending si report.
|
BLD-Foundation | 11/11/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Jim Storey
|
|
|
We need a Concrete Inspection. Phone #: ###-#### >> Inspection requested via web by Rick Slama south wall ok
|
BLD-Concrete | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PASS |
Jim Storey
|
|
|
Rick Phone #: ###-#### si and rebar ok storm drain incapsulated w/concrete per engineer.
|
OVERRIDE | | | 10/9/2013 | | |
|
|
|
|
Application received | | 8/16/2013 | 10/9/2013 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/16/2013 | | 10/9/2013 | | PASS |
John Menard
|
|
|
1st Review Complete 9-6-2013
|
Telephone call | | | 10/9/2013 | | DONE |
Barbara Stitt
|
|
|
Called Richard and told him that permit is ready, fees due, need GC & RP info and ACHD info//10-9-13 @ 2:10pm//BAS
|
Issue PAID IN FULL permit | | | 10/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 10/8/2013 | | 10/9/2013 | | PASS |
Jason C. Taylor
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2013 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 10/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 10/8/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of SWPPP narrative; taken to John Menard.
|
Routing - PLAN CHECK | 9/30/2013 | | 10/1/2013 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 10/1/2013 | | PASS |
John Menard
|
|
|
Reviewed and approved structural and nonstructural plan and calculation revisions. JCM
|
Routing - PLANNING Land Div | 10/1/2013 | | 10/1/2013 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size. (319 acres)
|
Routing - FIRE | 9/30/2013 | 9/30/2013 | 9/30/2013 | | PASS |
Scott Arellano
|
|
|
|
Routing - Erosion and Sediment | 9/30/2013 | | 9/30/2013 | | FAIL |
Jason C. Taylor
|
|
|
Plans submitted but Narritive is missing. Please submit ESC narritive for approval. Jason Taylor ###-####.
|
Routing - PLAN CHECK | 9/12/2013 | | 9/30/2013 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 9/23/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of response to architectural and response to fire review, two copies of plan sheets G2.00, A0.01, A1.01, A1.30, A3.01, A3.10, A4.01 A5.01, E2.1L, E2.2L; inserted by arch. rep. and taken back to John Menard.
|
1st review completed | | | 9/12/2013 | | FAIL |
Craig D. Hanson
|
|
|
Failed, ESC, Plan Check, Structural, fire
|
Routing - FIRE | 9/6/2013 | | 9/12/2013 | | FAIL |
Craig D. Hanson
|
|
|
Sent report to architec on 09/12/13
|
Routing - PLAN CHECK | 8/26/2013 | | 9/6/2013 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 9/6/2013 | | DONE |
Tisha Gallop
|
|
|
received four copies of structural response to comments, structural calculations and plan sheet ESC1; inserted into plans by permit tech and taken back to Fire Review.
|
Plan resubmittals requested | | | 9/6/2013 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Plan resubmittals requested | | | 8/28/2013 | | DONE |
John Menard
|
|
|
E-mailed the architrect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 8/16/2013 | | 8/27/2013 | | FAIL |
John Menard
|
|
|
Called Action Couriers for pick up
|
Routing - PLANNING | 8/23/2013 | | 8/26/2013 | | PASS |
Sarah Schafer
|
|
|
Ok- no Design Review overlay. JGW 8-26-13
|
Routing - PLUMBING | 8/21/2013 | | 8/23/2013 | | PASS |
Daryl Spivey
|
|
|
Provide tempered water to lavs and showers.
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 8/20/2013 | | 8/21/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 8/20/2013 | | 8/21/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 8/20/2013 | | 8/20/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing PW Sewer Rating | 8/20/2013 | | 8/20/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 8/19/2013 | | 8/20/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 8/19/2013 | | 8/19/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Erosion and Sediment | | | 8/19/2013 | | FAIL |
Jason C. Taylor
|
|
|
Plans not submitted. Please route plans to Jason Taylor when they are submitted for approval.
|
Routing - Addressing | 8/16/2013 | | 8/19/2013 | | PASS |
Jason C. Taylor
|
|
|
Project address was changed to 4321 S Kennedy St as it is closer to the actual project. Overall Address for Western Aircraft is 4300 S. Kennedy St. Jason Taylor ###-####.
|
Plan routing begun/NEW & ADDTN | | | 8/16/2013 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2013 | | |
|
|
|
8-16-13 ok per Carl W to take in
|