Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD13-02271
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 1879 S CENTURY WAY
Project NameWestern Recycling
Customer Number 
ePlanReviewYes
Description
Western Recycling - New Production Warehouse - To construct a new 37,595 square foot, one story, pre-engineered metal warehouse building with a 1,820 square foot unfinish mezzanine for future office space. A separate tenant improvement permit will be required to finish the mezzanine as an office occcupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing PW Environmental9/6/2013 9/11/3013 PASS
DetailsConnie Baumgartner
Third Notice 11/9/201412/2/2014 DONE
Second Notice 10/16/201411/4/2014 DONE
First Notice 9/15/201410/6/2014 DONE
Permanent Occupancy  9/5/2014 DONE
PubWorks Occupancy Approval9/3/20149/3/20149/3/2014 DONE
DetailsBrian Murphy
ok per BGM
FIRE-Final Inspection9/2/20149/2/20149/2/2014PPASS
DetailsTroy Cobbley
life safety passed. Fire extinguishers are placed but brackets will not be available for acouple of days.
BLD-Final8/29/20149/2/20149/2/2014APASS
DetailsPhil Shearer
Ron Phone #: ###-####
DOC - Permit Finaled9/2/20149/2/20149/2/2014PPASS
DetailsPhil Shearer
BLD-Final8/28/20148/29/20148/29/2014ACANC
DetailsPhil Shearer
Ron Phone #: ###-####
BLD-Final5/15/20145/16/20145/16/2014PPART
DetailsTom Arcoraci
Ron-wants temp co Phone #: ###-####
Zoning Approval5/16/20145/16/20145/16/2014 DONE
DetailsJosh Wilson
FIRE-Final Inspection5/8/20145/9/20145/9/2014APART
DetailsTroy Cobbley
A temporary occupancy for life safety is being given until the interior equipmetent has been installed and possible fire sprinkler modifications performed.
FIRE-Conference5/2/20145/5/20145/6/2014PDONE
DetailsTroy Cobbley
Went over life safety requirements with Mike. I deferred knox box location to the fire dept. I noted missing exit signs, building address and fire extinguisher and approval notes. Also project is not to be finaled until the interior equipment has been installed.
BLD-Framing/Rough-in4/29/20144/30/20144/30/2014APASS
DetailsTom Arcoraci
Ron-Ceiling grid inspection please Phone #: ###-####
BLD-Framing/Rough-in4/3/20144/4/20144/4/2014APASS
DetailsTom Arcoraci
Gayle Phone #: ###-####
Plan assigned to (JCM)3/28/2014 4/3/2014 PASS
DetailsJohn Menard
Plan Modification
Routing - PLAN CHECK3/28/2014 4/3/2014 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  4/3/2014 DONE
DetailsJohn Menard
CHANGE STATUS TO (ISS)  4/3/2014 DONE
DetailsTisha Gallop
plan mod approved and paid
Routing - FIRE3/28/2014 4/1/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Report MOD 04-01-14
BLD-Footing3/28/20143/31/20143/31/2014APASS
DetailsTom Arcoraci
ron Phone #: ###-####
BLD-Foundation3/27/20143/28/20143/28/2014APASS
DetailsTom Arcoraci
Ron - Late AM Please Phone #: ###-####
BLD-Energy code compliance3/26/20143/27/20143/27/2014APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in3/25/20143/26/20143/26/2014APASS
DetailsTom Arcoraci
Ron Phone #: ###-####
BLD-Footing3/25/20143/25/20143/25/2014PPASS
DetailsTom Arcoraci
ron Phone #: ###-####
BLD-Foundation2/13/20142/14/20142/14/2014APEND
DetailsTony Young
ron Phone #: ###-####,, dock area,, west side,, pending special inspection report
BLD-Foundation2/4/20142/5/20142/5/2014APASS
DetailsTom Arcoraci
request first thing in AM .. Ron Phone #: ###-####
BLD-Footing1/23/20141/23/20141/23/2014PPASS
DetailsTom Arcoraci
ron Phone #: ###-#### spec insp
BLD-Foundation1/21/20141/21/20141/21/2014PPART
DetailsJim Sly
Ron-Please call at least 30 mins prior to inspection Phone #: ###-####
80% of North wall...... Covered.......supplimental heat.
BLD-Foundation1/16/20141/16/20141/16/2014PPART
DetailsMike Jordan
ron Phone #: ###-####. pEnding special inspection.
BLD-Foundation1/13/20141/15/20141/15/2014APART
DetailsMike Jordan
Ron Phone #: ###-####
BLD-Footing1/13/20141/15/20141/15/2014APASS
DetailsMike Jordan
Ron Phone #: ###-####
BLD-Footing12/31/20131/2/20141/2/2014APASS
DetailsJim Storey
Ron Phone #: ###-####
BLD-Conference12/23/201312/24/201312/24/2013APASS
DetailsTom Arcoraci
BLD-Footing12/20/201312/23/201312/23/2013APASS
DetailsTom Arcoraci
ron Phone #: ###-####
BLD-Foundation12/18/201312/19/201312/19/2013APASS
DetailsTom Arcoraci
ron Phone #: ###-####
BLD-Concrete12/12/201312/12/201312/12/2013PPASS
DetailsTom Arcoraci
BLD-Footing12/11/201312/12/201312/12/2013APART
DetailsTom Arcoraci
ron Phone #: ###-####
BLD-Footing12/3/201312/5/201312/5/2013APART
DetailsTom Arcoraci
Ron Phone #: ###-#### spec inspector on site cold weather protection appears in place
OVERRIDE  11/26/2013  
Issue PAID IN FULL permit  11/26/2013 DONE
DetailsChristina Prado
Print Occupancy Form  11/26/2013 DONE
DetailsChristina Prado
Telephone call  11/26/2013 DONE
DetailsChristina Prado
Spoke to Mike over phone - Mike provided revised values early October, emailed fee calc and advised proper forms will need to be filled out at time of permit issuance. Also advised ACHD is req'd
Permit Ready to Issue  11/26/2013 DONE
DetailsChristina Prado
Routing - Erosion and Sediment11/22/2013 11/25/2013 PASS
DetailsJason C. Taylor
PLANS/APPL TAKEN TO FRONT DESK  11/25/2013 DONE
DetailsJohn Menard
Plan assigned to (JCM)9/6/2013 11/25/2013 PASS
DetailsJohn Menard
1st Review Complete 10/22
Routing Off Site - STRUCTURAL11/13/2013 11/21/2013 PASS
DetailsJohn Menard
Plan Reviewer's activity  11/19/2013 PASS
DetailsJohn Menard
Reviewed and approved plan resubmittals. JCM
Routing - PLAN CHECK11/13/2013 11/19/2013 PASS
DetailsJohn Menard
Routing - FIRE11/13/2013 11/19/2013 PASS
DetailsScott Arellano
See Fire Report Rev 1
Routing - Erosion and Sediment11/13/2013 11/15/2013 FAIL
DetailsJason C. Taylor
1st review completed  10/23/2013 DONE
DetailsJohn Menard
Routing - PLAN CHECK9/6/2013 10/22/2013 FAIL
DetailsJohn Menard
Routing - PUBLIC WORKS9/6/2013 10/21/2013 PASS
DetailsConnie Baumgartner
Routing PW Drainage9/6/2013 10/21/2013 PASS
DetailsBrian Murphy
Routing - PLANNING10/1/2013 10/1/2013 PASS
DetailsDavid Moser
Routing - PLANNING Land Div10/1/2013 10/1/2013 PASS
DetailsDave Abo
ROS13-00059 completed.
Routing - FIRE9/6/20139/6/20139/30/2013 FAIL
DetailsCraig D. Hanson
Routing - PLANNING9/6/2013 9/25/2013 FAIL
DetailsDavid Moser
Need to complete the ROS and need approval letter from Airport for Wildlife Plan
Routing Off Site - STRUCTURAL9/6/2013 9/19/2013 FAIL
DetailsJohn Menard
Routing - Design Review9/6/2013 9/11/2013 PASS
DetailsJosh Wilson
Routing - PLUMBING9/6/2013 9/10/2013 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Route to Impact Fee Review9/6/2013 9/10/2013 PASS
DetailsCindy M. Gould
Routing PW Sewer Rating9/6/2013 9/10/2013 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment9/6/2013 9/10/2013 FAIL
DetailsJason C. Taylor
Needs SWPPP Plan submitted for review. Jason Taylor ###-####
Routing PW Street Lights9/6/2013 9/9/2013 PASS
DetailsMike D Hedge
Routing PW Solid Waste9/6/2013 9/9/2013 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div9/6/2013 9/9/2013 FAIL
DetailsDave Abo
Must complete Record of Survey for Parcel Consolidation.
ROS13-00059
Routing PW Sewer Design9/6/2013 9/9/2013 PASS
DetailsKyle S. Rosenmeyer
Payment Received  9/6/2013 DONE
Payment received via Govolutions
Pending Assignment by JCM9/6/2013 9/6/2013 DONE
DetailsJohn Menard
Routing - Addressing9/6/2013 9/6/2013 PASS
DetailsEmily Dixon
Application received  8/20/2013 DONE
Application submitted via PDS Online on Aug 20 2013 9:38AM