BLD-Final | 10/16/2013 | 10/17/2013 | 10/17/2013 | A | PASS |
Mike Jordan
|
|
|
DAMIR Phone #: ###-####
|
DOC - Permit Finaled | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 9/19/2013 | 9/19/2013 | 9/19/2013 | P | PASS |
Mike Jordan
|
|
|
sysko Phone #: ###-####. gable end truss modified per provided engineering. ok to cover.
|
BLD-Framing/Rough-in | 9/16/2013 | 9/17/2013 | 9/17/2013 | P | FAIL |
Mike Jordan
|
|
|
Sysco Phone #: ###-####. Gable end truss requires continous bearing. Provide bearing or engineered fix from truss co.
|
BLD-Concrete | 8/23/2013 | 8/26/2013 | 8/26/2013 | A | PART |
Mike Jordan
|
|
|
Damir Phone #: ###-####. Footings for ne patio cover. Concrete already placed. Homeowner had pictures of concrete placement. Noted footings in place but not able to verify size of footings. Contractor accepts all liability for footings.
|
Routing Walk-In (Zoning) | 8/21/2013 | 8/21/2013 | 8/21/2013 | A | PASS |
Josh Wilson
|
|
|
OK per A-1 setbacks. JGW 8-21-13
|
Routing Walk-In (BLD) | 8/21/2013 | 8/21/2013 | 8/21/2013 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 8/21/2013 | 8/21/2013 | 8/21/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 8/21/2013 | | |
|
|
|
|
1st review completed | | | 8/21/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/21/2013 | | | |
|
|
|
|