Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-02304
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 3101 W MAIN ST Unit: 110
Project NameRiverfront Plaza - Ste 101
Customer Number 
ePlanReviewNo
Description
(XTREME CONSULTING - RIVERFRONT PLAZA - STE 101) This building is fully fire sprinklered for area increase. To remodel an existing 4,452 square foot office tenant space by adding an office, relocating reception area, convert break room to work room, convert conference room to break room. Work is to include: construction of a newly defined private office and erect a wall to isolate smaller break room area, installation of break room sink, relocate lights / ducts only, provide independent switching, and interior finishes. NOTE: this space was originally built out under BLD05-00568 for “Pinnacle Pension”. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/2/2014 DONE
Second Notice 12/7/201312/30/2013 DONE
Faxed 12-30-13
First Notice 11/22/201311/27/2013 DONE
Permanent Occupancy  11/12/2013 DONE
DetailsChristina Prado
BLD-Final10/30/201310/31/201310/31/2013PDONE
DetailsDave Hannah
John Phone #: ###-####
BLD-Final10/31/201310/31/201310/31/2013APASS
DetailsDave Hannah
John Phone #: ###-####
FIRE-Final Inspection10/30/201310/31/201310/31/2013APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final10/29/201310/30/201310/31/2013PNR
DetailsDave Hannah
John Phone #: ###-#### needs fire finals first
FIRE-Final Inspection10/29/201310/30/201310/30/2013AFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire alarm permit has been addressed.
Routing - Addressing10/30/2013 10/30/2013 PASS
DetailsJason C. Taylor
Address previously submitted was incorrect. Applicant requested that the address suite change from 101 to 110. Applicant resubmited overall building layout to verify all current addresses. Jason Taylor ###-####
FIRE-Conference10/29/201310/29/201310/29/2013PDONE
DetailsForrest France
Regarding project schedule, fire life safety inspection and fire alarm testing for tenant remodel work.
BLD-Ceiling Grid Inspection10/29/201310/29/201310/29/2013PPASS
DetailsDave Hannah
john Phone #: ###-####
FIRE-Conference10/22/201310/22/201310/22/2013ADONE
DetailsForrest France
Tenant remodel work will require modifications to the existing fire alarm system to be completed with an issued fire alarm permit as discussed.
BLD-Framing/Rough-in9/30/201310/2/201310/2/2013PPASS
DetailsTom Arcoraci
DON Phone #: ###-####
Issue PAID IN FULL permit  8/29/2013 DONE
Print Occupancy Form  8/29/2013 DONE
Plan assigned to (TLW)8/22/2013 8/28/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK8/23/2013 8/28/2013 PASS
DetailsTim L. Woodard
1st review completed  8/28/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/28/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/28/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  8/28/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  8/28/2013 DONE
DetailsBarbara Stitt
Telephone call  8/28/2013 DONE
DetailsBarbara Stitt
Left a voice message for Cornel that permit is and fees due on 8-28-13 @ 4:55pm//BAS
Routing - PUBLIC WORKS8/22/2013 8/23/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing8/22/2013 8/23/2013 PASS
DetailsJason C. Taylor
Routing PW Sewer Rating8/23/2013 8/23/2013 PASS
DetailsConnie Baumgartner
Application received 8/22/20138/22/2013 DONE
Plans ACCEPTED BY PLAN TECH  8/22/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/22/2013 DONE
DetailsTisha Gallop