First Notice | | 1/24/2014 | 2/4/2014 | | DONE |
|
|
|
This permit finaled on the web by Mike Salyer
|
BLD-Final | 1/13/2014 | 1/14/2014 | 1/14/2014 | A | PASS |
Mike Jordan
|
|
|
call 30 min ahead // Garrett Phone #: ###-####. Ok for perm. occ.
|
FIRE-Final Inspection | 1/13/2014 | 1/14/2014 | 1/14/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 1/14/2014 | | DONE |
Tisha Gallop
|
|
|
issued new cert of occ with new occ load per plan mod
|
Permit Ready to Issue | | | 1/13/2014 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/13/2014 | | DONE |
Tisha Gallop
|
|
|
plan mod to change occupancy classification of one room. Need to do over Fire L/S and Structual final inspections to receive new certificate of occupancy.
|
Print Occupancy Form | | | 1/13/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (AJS) | 1/10/2014 | 1/10/2014 | 1/10/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Met with Jason Blais to discuss exit separation for conference room. We both agree that with the rated construction, non combustible, fire sprinkler, 3 exits from the room that I could approve the use of conference room per the revised plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2014 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/10/2014 | | DONE |
|
|
|
start mod per jason/adele
|
BLD-Final | 11/26/2013 | 11/27/2013 | 11/27/2013 | A | PASS |
Tom Arcoraci
|
|
|
GARRETT please call 30 min before going out Phone #: ###-####
|
Permanent Occupancy | | | 11/27/2013 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 10/16/2013 | 10/16/2013 | 10/16/2013 | P | PASS |
Forrest France
|
|
|
For verification of repairs and revised locations of EM lights.
|
BLD-Final | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | PART |
Dave Hannah
|
|
|
Garrett Phone #: ###-#### ok for temp occ needs to install one door and side lights
|
FIRE-Final Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety okay pending EM lights and one exit sign are repaired or provided per plan as discussed. MIssing door/frame and glass to be completed prior to structural final.
|
BLD-Other | 10/7/2013 | 10/8/2013 | 10/9/2013 | A | PASS |
Dave Hannah
|
|
|
Garrett Phone #: ###-#### ok to cover ceiling grid
|
FIRE-Sprinkler Rough-in | 10/3/2013 | 10/3/2013 | 10/3/2013 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work okayed to cover as noted.
|
BLD-Framing/Rough-in | 9/23/2013 | 9/24/2013 | 9/24/2013 | A | PASS |
Dave Hannah
|
|
|
Garrett Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2013 | 9/20/2013 | 9/20/2013 | A | PASS |
Dave Hannah
|
|
|
garrett Phone #: ###-####
|
Permit Ready to Issue | | | 9/11/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/11/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 9/11/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 8/26/2013 | 8/26/2013 | 9/10/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level I Due 8/30
|
Routing - PLAN CHECK | 9/10/2013 | | 9/10/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/4/2013 | | 9/4/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
See change marks in e plan
|
Routing - PLAN CHECK | 8/26/2013 | | 8/29/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 8/29/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plans
|
Routing PW Sewer Rating | 8/26/2013 | | 8/27/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/26/2013 | | 8/27/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/26/2013 | | 8/26/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 8/26/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 8/22/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 22 2013 11:05AM
|