Permit Information
Permit NumberBLD13-02305
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 225 N 9TH ST Unit: 200
Project NameCLEARWATER ANALYTICS
Customer Number 
ePlanReviewYes
Description
(CLEARWATER ANALYTICS-Suite 200) (Sedgewick Building)Plan Modification 1/10/14 to include conference room as shown on submitted floor plan and revised occupant load. Permit for T.I of existing tenant space on second floor. Tenant space created under BLD12-01166. Scope of work to include; demo of existing partition was per approved plans. Construction of new nonbearing partition walls for new office lay out including new break room per approved plans. Interior finish shall be per chapter 8, IBC.This building is fire sprinklered to meet high rise provisions. There is 1 conference roomr, office space, office space and break rooms space. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/24/20142/4/2014 DONE
This permit finaled on the web by Mike Salyer
BLD-Final1/13/20141/14/20141/14/2014APASS
DetailsMike Jordan
call 30 min ahead // Garrett Phone #: ###-####. Ok for perm. occ.
FIRE-Final Inspection1/13/20141/14/20141/14/2014APASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  1/14/2014 DONE
DetailsTisha Gallop
issued new cert of occ with new occ load per plan mod
Permit Ready to Issue  1/13/2014 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  1/13/2014 DONE
DetailsTisha Gallop
plan mod to change occupancy classification of one room. Need to do over Fire L/S and Structual final inspections to receive new certificate of occupancy.
Print Occupancy Form  1/13/2014 DONE
DetailsTisha Gallop
Plan assigned to (AJS)1/10/20141/10/20141/10/2014 DONE
DetailsAdele J Schaffeld-Griffin
Met with Jason Blais to discuss exit separation for conference room. We both agree that with the rated construction, non combustible, fire sprinkler, 3 exits from the room that I could approve the use of conference room per the revised plans.
PLANS/APPL TAKEN TO FRONT DESK  1/10/2014 DONE
Plan Modification Accepted  1/10/2014 DONE
start mod per jason/adele
BLD-Final11/26/201311/27/201311/27/2013APASS
DetailsTom Arcoraci
GARRETT please call 30 min before going out Phone #: ###-####
Permanent Occupancy  11/27/2013 DONE
DetailsChristina Prado
FIRE-Final Inspection10/16/201310/16/201310/16/2013PPASS
DetailsForrest France
For verification of repairs and revised locations of EM lights.
BLD-Final10/15/201310/16/201310/16/2013APART
DetailsDave Hannah
Garrett Phone #: ###-#### ok for temp occ needs to install one door and side lights
FIRE-Final Inspection10/15/201310/15/201310/15/2013PPASS
DetailsForrest France
Fire life safety okay pending EM lights and one exit sign are repaired or provided per plan as discussed. MIssing door/frame and glass to be completed prior to structural final.
BLD-Other10/7/201310/8/201310/9/2013APASS
DetailsDave Hannah
Garrett Phone #: ###-#### ok to cover ceiling grid
FIRE-Sprinkler Rough-in10/3/201310/3/201310/3/2013PPART
DetailsForrest France
Overhead fire sprinkler work okayed to cover as noted.
BLD-Framing/Rough-in9/23/20139/24/20139/24/2013APASS
DetailsDave Hannah
Garrett Phone #: ###-####
BLD-Framing/Rough-in9/19/20139/20/20139/20/2013APASS
DetailsDave Hannah
garrett Phone #: ###-####
Permit Ready to Issue  9/11/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  9/11/2013 DONE
DetailsChristina Prado
Print Occupancy Form  9/11/2013 DONE
DetailsChristina Prado
Plan assigned to (AJS)8/26/20138/26/20139/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level I Due 8/30
Routing - PLAN CHECK9/10/2013 9/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  9/10/2013 DONE
Routing - PLAN CHECK9/4/2013 9/4/2013 FAIL
DetailsAdele J Schaffeld-Griffin
See change marks in e plan
Routing - PLAN CHECK8/26/2013 8/29/2013 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  8/29/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plans
Routing PW Sewer Rating8/26/2013 8/27/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing8/26/2013 8/27/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/26/2013 8/26/2013 PASS
DetailsBeverly Mountain
Intake Approval  8/26/2013 PASS
DetailsAdele J Schaffeld-Griffin
Application received  8/22/2013 DONE
Application submitted via PDS Online on Aug 22 2013 11:05AM