Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-02308
StatusFinaled
Name PRISTINE POOLS AND SPAS
Site Address 1826 S TRAVERTINE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the placement of a new 56s.f. pool / spaw with R-1A approved by Leon Letson. The spa will use chlorine tabs and cartridge filter for disinfection. ESC Plan Waiver approved by Jayson Taylor. Subgrade approval will be required from a geotechnical engineer prior to placement of concrete footing, etc. Jason Taylor 384-3946. Separate electrical permit is required and bonding of all metal parts is required to be approved by the electrical division prior to approval for placement of any concrete by the structural division. All per the approvedplans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/1/201412/2/201412/2/2014PPASS
DetailsPhil Shearer
Margo ###-####
DOC - Permit Finaled12/2/201412/2/201412/2/2014PPASS
DetailsPhil Shearer
Telephone call  11/20/2014 DONE
DetailsChristina Prado
Per telephone conversation with Pristine Pools & Spa - Request to release of liability as job will not be completed by this company. Permit reverted back to homeowner until new GC is declared or project is completed. See scanned request from GC in documents/// C_P
BLD-Other10/14/201310/15/201310/15/2013APASS
DetailsDave Hannah
ryan - rebar Phone #: ###-#### rebar for spa ok after elec is oked.
BLD-Footing9/25/20139/25/20139/25/2013PFAIL
DetailsJim Storey
RYAN Phone #: ###-#### RYAN Phone #: ###-####,, need electrical inspection on bonding,, and soils report
BLD-Foundation9/24/20139/25/20139/25/2013AFAIL
DetailsTony Young
RYAN Phone #: ###-####,, need electrical inspection on bonding,, and soils report
Issue PAID IN FULL permit  8/27/2013 DONE
DetailsChristina Prado
OVERRIDE  8/22/2013  
Routing Walk-In (PW Hillside)8/22/20138/22/20138/22/2013PPASS
DetailsJason C. Taylor
Subgrade approval will be required from a geotechnical engineer prior to placement of concrete footing, etc. Jason Taylor ###-####
Routing Walk-In (Zoning)8/22/20138/22/20138/22/2013PPASS
DetailsLeon Letson
Routing Walk-In (BLD)8/22/20138/22/20138/22/2013PDONE
DetailsPerry Paine
Plan assigned to (PEP)8/22/20138/22/20138/22/2013 PASS
DetailsPerry Paine
Inspection Record Card- Bld  8/22/2013  
1st review completed  8/22/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/22/2013 DONE
Permit Ready to Issue  8/22/2013 DONE
DetailsChristina Prado
Routing - Erosion and Sediment8/22/2013 8/22/2013 PASS
DetailsJason C. Taylor
See ESC Permit for conditions.
Application received 8/22/2013