BLD-Final | 12/10/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Jim Sly
|
|
|
Ryan Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Other | 9/6/2013 | 9/9/2013 | 9/9/2013 | A | PASS |
Dave Hannah
|
|
|
rebar - ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 8/28/2013 | 8/28/2013 | 8/28/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer. Pool footings/walls may be scheduled for inspection with the building department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 8/27/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (PEP) | 8/26/2013 | 8/26/2013 | 8/26/2013 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 8/23/2013 | 8/23/2013 | 8/26/2013 | A | DONE |
Perry Paine
|
|
|
|
1st review completed | | | 8/26/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/26/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/26/2013 | | |
|
|
|
|
Telephone call | | | 8/26/2013 | | |
|
|
|
8-26-13 called Jamie left message permit ready and fee given ///dld
|
Routing Walk-In (Zoning) | 8/23/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Leon Letson
|
|
|
|
Routing Walk-In (PW Hillside) | 8/22/2013 | 8/22/2013 | 8/23/2013 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
A letter from the applicant’s geotechnical engineer indicating that the pool perimeter drainage, as described int he geotechnical report, is acceptable must be approved by Public Works prior to permit final. Call Jason Taylor at ###-####
|
Routing - Erosion and Sediment | 8/23/2013 | | 8/23/2013 | | PASS |
Jason C. Taylor
|
|
|
RP must be identified prior to ESC Permit being issued. See ESC permit for details. Jason Taylor ###-####.
|
Application received | | 8/22/2013 | | | |
|
|
|
|