Print Statement | | | 5/15/2014 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | | 3/13/2014 | 5/5/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/3/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Dave Hannah
|
|
|
Aaron Baker Phone #: ###-####
|
BLD-Final | 2/12/2014 | 2/12/2014 | 2/12/2014 | P | PEND |
Dave Hannah
|
|
|
Aaron Phone #: ###-#### ok for temp occ ok for perm after plumbing gos perm occ
|
Temporary Occupancy | 2/12/2014 | 5/13/2014 | 2/12/2014 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Forrest France
|
|
|
C/N items verified for completion. Fire life safety finaled.
|
FIRE-Final Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 | P | NR |
Forrest France
|
|
|
Items noted include; suite address, post max occupant load sign, post signage at the second exit passageway per review note #3, project related fire sprinkler permit needs finaled.
|
BLD-Ceiling Grid Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 | A | PASS |
Dave Hannah
|
|
|
Request first inspection of day - aaron Phone #: ###-####
|
BLD-Framing/Rough-in | 1/31/2014 | 1/31/2014 | 2/3/2014 | P | PART |
Dave Hannah
|
|
|
Ceiling grid inspection please-Aaron Phone #: ###-#### needs th finish installing lights
|
BLD-Energy code compliance | 1/9/2014 | 1/9/2014 | 1/10/2014 | P | PASS |
Dave Hannah
|
|
|
ROGER Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2014 | 1/3/2014 | 1/6/2014 | P | PART |
Dave Hannah
|
|
|
aaron Phone #: ###-#### ok to cover walls
|
BLD-Conference | 12/12/2013 | 12/16/2013 | 12/17/2013 | A | DONE |
Dave Hannah
|
|
|
AARON Phone #: ###-####
|
BLD-Conference | 12/12/2013 | 12/13/2013 | 12/12/2013 | A | CANC |
Dave Hannah
|
|
|
AARON Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 10/25/2013 | | 10/28/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2013 | | |
|
|
|
|
Print Occupancy Form | | | 10/28/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/28/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/28/2013 | | DONE |
Christina Prado
|
|
|
Called Richard to advise permit is ready and gave fees due
|
Plan assigned to (CJW) | 8/23/2013 | | 10/28/2013 | | PASS |
Carl Westfall
|
|
|
FLATBREAD NEAPOLITAN PIZZERIA
|
Routing - PLUMBING | 10/24/2013 | | 10/25/2013 | | PASS |
Daryl Spivey
|
|
|
May require additional backflow protection
Per plan and ISPC.
|
Plan resubmittals received | | | 10/25/2013 | | |
|
|
|
10-25-13 received 1 transmittal , 1 copy of sheets A100, A511 sent to Carl W.
|
Plan resubmittals received | | | 10/24/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked e3.2 & e4.2 as well as 1 revised set of structural calcs;Taken to Carl Westfall for further review
|
Routing - MECHANICAL | | | 10/24/2013 | | PASS |
|
|
|
|
Routing - FIRE | 10/22/2013 | | 10/23/2013 | | PASS |
Craig D. Hanson
|
|
|
|
Plan resubmittals received | | | 10/22/2013 | | DONE |
Christina Prado
|
|
|
received two sets of revised structural calcs; Taken to Carl Westfall for further review
|
Routing - PLAN CHECK | 10/18/2013 | | 10/22/2013 | | FAIL |
Carl Westfall
|
|
|
Need more information
|
Plan resubmittals received | | | 10/18/2013 | | DONE |
|
|
|
Rec'd response letter, specs and sheets a0.01; a0.10; A100; A151; A314; A315; A511; M0.1; M0.2; M2.2; M6.1; M6.2; P2.2a; UP2.2; e2.2; e3.2; e4.1; e4.2 - taken to carl w
|
Meeting | | | 9/25/2013 | | DONE |
|
|
|
Met with the Architect, Mech Engineer, and the Owner to discuss the grease duct shaft concerns.
|
Route to Impact Fee Review | 9/17/2013 | 9/20/2013 | 9/19/2013 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement
|
Routing - FIRE | 9/17/2013 | 9/17/2013 | 9/19/2013 | | FAIL |
Craig D. Hanson
|
|
|
Oven clarification and back egress hall redesign.
|
1st review completed | | | 9/19/2013 | | FAIL |
|
|
|
Failed Mech, Plans, Fire
|
Routing - PLAN CHECK | 9/13/2013 | | 9/17/2013 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Sept 14 and was finished on Sept 17. Revised drawings were required. See the plan review report.
|
Routing - Design Review | 9/13/2013 | | 9/13/2013 | | PASS |
Sarah Schafer
|
|
|
The grille to be installed on the Main Street elevation was shown on the Shell and Core permit. In speaking with Richard Honsinger from Erstad Architects they are still working on the scrubbers to be installed in the vents to make sure there is no soot on the building from the wood burning oven to be installed. The soot would be my main concern with the location of the vent.
|
Routing - PLAN CHECK | 9/3/2013 | | 9/12/2013 | | PEND |
Carl Westfall
|
|
|
Took site copy to Fire to see if they could get started on it.
|
Routing - MECHANICAL | 8/27/2013 | | 9/3/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to architect
|
Routing - PLUMBING | 8/26/2013 | | 8/27/2013 | | PASS |
Bill VanDegrift
|
|
|
May require additional backflow protection on equipment.
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 8/23/2013 | | 8/26/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 8/26/2013 | | 8/26/2013 | | PASS |
Walt Baumgartner
|
|
|
Plans indicated kitchen drains to common shell & core grease line.
|
Routing PW Sewer Rating | 8/26/2013 | | 8/26/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/23/2013 | | 8/23/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Pending Assignment by JCB | 8/22/2013 | | 8/23/2013 | | DONE |
Jason Blais
|
|
|
|
Application received | | 8/22/2013 | 8/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/22/2013 | | DONE |
|
|
|
|
Intake Approval | | | 8/22/2013 | | PASS |
Tim L. Woodard
|
|
|
|