BLD-Final | 9/17/2013 | 9/18/2013 | 9/18/2013 | P | PASS |
Tony Young
|
|
|
Joann Phone #: ###-####
|
FIRE-Final Inspection | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | PASS |
Forrest France
|
|
|
Correction notice items verified for completion. Life safety passed.
|
Permanent Occupancy | | | 9/18/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | NR |
Tony Young
|
|
|
joanne Phone #: ###-####,, need f/l/s 1st
|
FIRE-Final Inspection | 9/10/2013 | 9/10/2013 | 9/11/2013 | P | FAIL |
Forrest France
|
|
|
Missing panic hardware, exit signs/EM lights, and signage at the main entry/exit per plan review red-lines. Also need to remove storage from the mezzanine level and replace one fire extinguisher at the recieving area with the correct rating/size.
|
Issue PAID IN FULL permit | | | 9/10/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 8/27/2013 | 8/27/2013 | 8/30/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 8/30
|
Routing - PLAN CHECK | 8/30/2013 | | 8/30/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 8/30/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/30/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/30/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/30/2013 | | DONE |
Christina Prado
|
|
|
Left message for Larry advising permit is ready for pick up
|
Routing - PLAN CHECK | 8/26/2013 | | 8/28/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
email sent 8/28/13 to larry to request site visit meeting
|
1st review completed | | | 8/28/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Telephone call | | | 8/28/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
email address on application came back non deliverable called and left voice message to call me. 8/28/13
|
Plan assigned to (TLW) | 8/26/2013 | | 8/27/2013 | | DEFR |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/26/2013 | | DONE |
|
|
|
|
First Notice | | 9/28/2013 | | | |
|
|
|
|
Application received | | 8/26/2013 | | | |
|
|
|
|