BLD-Conference | 2/24/2018 | 3/8/2018 | 3/8/2018 | A | CANC |
Tony Young
|
|
|
status review to close out permit Inspection cancelled from web by: Timothy Beaudoin
|
BLD-Final | 2/15/2018 | 2/21/2018 | 2/24/2018 | A | PEND |
Tony Young
|
|
|
status review to close out permit
|
BLD-Final | 2/13/2018 | 2/15/2018 | 2/15/2018 | A | PEND |
Tony Young
|
|
|
status review to close out permit
|
BLD-Conference | 2/8/2018 | 2/13/2018 | 2/13/2018 | A | NH |
Tony Young
|
|
|
status review to close out permit
|
BLD-Conference | 2/7/2018 | 2/8/2018 | 2/8/2018 | P | PEND |
Tony Young
|
|
|
status review to close out permit
|
BLD-Conference | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | NH |
Tony Young
|
|
|
|
Zoning Approval | 2/7/2018 | 2/7/2018 | 2/7/2018 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Energy code compliance | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | PASS |
Tony Young
|
|
|
Insulators will be there in the AM and should be finished prior to 12pm. Call Tim if there are any problems. Thank you. Phone #: ###-#### >> Inspection requested via web by Timothy Beaudoin
|
BLD-Framing/Rough-in | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####0
|
BLD-Foundation | 11/14/2013 | 11/14/2013 | 11/14/2013 | P | PART |
Tony Young
|
|
|
adam Phone #: ###-####
|
BLD-Footing | 11/8/2013 | 11/8/2013 | 11/10/2013 | P | PART |
Tony Young
|
|
|
adam Phone #: ###-####,, work in progress,, ok to pour when ready
|
Print Occupancy Form | | | 10/23/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/23/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 10/16/2013 | | |
|
|
|
|
Print Occupancy Form | | | 10/16/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
called Cathy to advise permit is ready pending GC, ACHD & RP info and gave fees due
|
Permit Ready to Issue | | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 8/27/2013 | 8/27/2013 | 10/15/2013 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Case Summary (BLD) | | | 10/15/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/9/2013 | | 10/15/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Erosion and Sediment | 10/10/2013 | | 10/14/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 10/14/2013 | | |
|
|
|
10-14-13 received 1 correction, and 2 copies of sheets A2.01,A3.01,A6.01 inserted by Catherine Sewell and taken back to Carl M
|
Plan resubmittals received | | | 10/11/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of ESC narrative and plans; taken to Carl Madsen.
|
Routing - PUBLIC WORKS | 10/9/2013 | | 10/10/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 10/9/2013 | | 10/10/2013 | | PASS |
Brian Murphy
|
|
|
LESS THAN 1000 SQUARE FREE
|
Routing - PLAN CHECK | 9/20/2013 | | 10/9/2013 | | FAIL |
Carl D Madsen
|
|
|
East wall is required to be one hour construction and need a continuity detail for wall at the stair section. CDM
|
Routing - Design Review | 10/9/2013 | | 10/9/2013 | | PASS |
Matthew A Halitsky
|
|
|
|
Plan resubmittals received | | | 10/1/2013 | | |
|
|
|
10-1-13 received 1 transmittal,1 comment,1 response,1 evaluation report, 3 structural calcs , 5 copies of sheets S1.01 & S2.01 , and 4 copies of sheets G1.00,A1.01,A2.01,A2.02,A4.01,A4.02,A6.01, and 5 copies of sheets A3.01 inserted by Catherine Sewell and taken back to Carl M.
|
1st review completed | | | 9/20/2013 | | FAIL |
|
|
|
Failed PW, Plan check,Errosion,
|
Route to Impact Fee Review | 8/27/2013 | 8/30/2013 | 9/19/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 9/18/2013 | 8/27/2013 | 9/19/2013 | | PASS |
Craig D. Hanson
|
|
|
See attached letter for field verification
|
Routing - PLAN CHECK | 9/17/2013 | | 9/18/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Design Review | 9/6/2013 | | 9/17/2013 | | PASS |
Matthew A Halitsky
|
|
|
|
Routing Off Site - STRUCTURAL | 8/27/2013 | | 9/9/2013 | | PASS |
Carl D Madsen
|
|
|
Receive first review comments E-Mailed to Cathy Sewell 9-9-13 CDM All review comments were adressed with no reason to route back to the structural outsouce engineer. CDM 10-15-13
|
Routing - PLUMBING | 9/3/2013 | | 9/6/2013 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Drainage | 8/29/2013 | | 8/30/2013 | | FAIL |
Brian Murphy
|
|
|
DOWNSPOUT LOCATION
|
Routing PW Sewer Rating | 8/29/2013 | | 8/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | | | 8/29/2013 | | FAIL |
Jason C. Taylor
|
|
|
ESC plan required, waiver denied. Please submit plans for review. Jason Taylor ###-####.
|
Routing - Addressing | 8/28/2013 | | 8/29/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 8/27/2013 | | 8/28/2013 | | PASS |
Dave Abo
|
|
|
Existing structure built in 1927 on parcel. Parcel created prior to October 30, 1965.
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/27/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/27/2013 | | DONE |
Christina Prado
|
|
|
called Action Couriers for pick up
|
Application received | | 8/27/2013 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/30/2013 | | | | FAIL |
Beverly Mountain
|
|
|
Failed by Drainage - Brian Murphy
|