BLD-Final | 10/1/2013 | 10/2/2013 | 10/2/2013 | A | PASS |
Dave Hannah
|
|
|
mike Phone #: ###-####
|
Permanent Occupancy | | | 10/2/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/30/2013 | 10/1/2013 | 10/1/2013 | A | PASS |
Forrest France
|
|
|
Life safety inspection completed satisfactory. PFE at the mezzanine level to be installed on a bracket as discussed.
|
Plan Reviewer's activity | | | 9/9/2013 | | DONE |
Tim L. Woodard
|
|
|
Per discussion with Dixie Fellows I have added a note into the scope of work for BLD13-02382 that states no food prep is being done at this location. All equipment is removed. TLW
|
Print Occupancy Form | | | 9/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
(F) Reprint permit | | | 9/9/2013 | | DONE |
|
|
|
|
Telephone call | | | 9/9/2013 | | |
|
|
|
called Mike Strand and left vm that scope of work has been modified to reflect this is coffee shop with no food prep. Told him need to come down and pick up paperwork and reschedule all inspections.
|
Plan assigned to (TLW) | 8/28/2013 | | 9/4/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/29/2013 | | 9/4/2013 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 9/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 9/4/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 9/4/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/4/2013 | | DONE |
Tisha Gallop
|
|
|
called John Fitzgerald as requested, and told him permit is ready.
|
Issue PAID IN FULL permit | | | 9/4/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PUBLIC WORKS | 8/28/2013 | | 8/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/29/2013 | | 8/29/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 8/29/2013 | | 8/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 8/29/2013 | | 8/29/2013 | | PASS |
Walt Baumgartner
|
|
|
Approved without grease abatement at this time. Change of use or equipment will require upgrade.
|
Application received | | 8/28/2013 | 8/28/2013 | | DONE |
|
|
|
|
First Notice | | 10/12/2013 | | | |
|
|
|
|