Second Notice | | 5/15/2014 | 6/10/2014 | | DONE |
|
|
|
This permit finaled on the web by Chris Collett
|
First Notice | | 4/14/2014 | 5/5/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/4/2014 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval | 4/2/2014 | 4/2/2014 | 4/2/2014 | | DONE |
Andrea Tuning
|
|
|
|
Telephone call | | | 4/1/2014 | | DONE |
Barbara Stitt
|
|
|
Left a message for Chris to contact me regarding the bond on this permit ASAP on 4-1-14 @ 4:00
|
Telephone call | | | 3/28/2014 | | |
Barbara Stitt
|
|
|
Left a voice message for Chris Collette @ ###-#### to call me ASAP regarding temp occupancy expiration
|
Change Expiration Date Only | | | 3/10/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 2/25/2014 | 2/25/2014 | 3/4/2014 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 12/26/2013 | 12/27/2013 | 12/27/2013 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by steven barth
|
FIRE-Final Inspection | 12/26/2013 | 12/27/2013 | 12/27/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
Temporary Occupancy | 12/27/2013 | 3/27/2014 | 12/27/2013 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval Temp | 12/27/2013 | 12/27/2013 | 12/27/2013 | | DONE |
Andrea Tuning
|
|
|
Temp occupancy given for 90 days. Once banding on building and landscaping is complete, final occupancy may be granted.
|
BLD-Ceiling Grid Inspection | 12/24/2013 | 12/24/2013 | 12/24/2013 | P | PASS |
Tony Young
|
|
|
Electrical inspection around 10am today. Any time after that would be appreciated. Phone #: ###-#### >> Inspection requested via web by steven barth
|
BLD-Framing/Rough-in | 11/21/2013 | 11/22/2013 | 11/22/2013 | A | DONE |
Tony Young
|
|
|
Framing inspection for short parapet top extensions on the west and south sides. Phone #: ###-#### >> Inspection requested via web by steven barth
|
BLD-Framing/Rough-in | 11/20/2013 | 11/21/2013 | 11/21/2013 | P | PASS |
Mike Jordan
|
|
|
Inspection on exterior framing, north side around door. Phone #: ###-#### >> Inspection requested via web by steven barth. Framing ok per Tom A. Inspector#408.
|
BLD-Wall cover | 11/15/2013 | 11/18/2013 | 11/18/2013 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by steven barth,, walls ok
|
BLD-Framing/Rough-in | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PART |
Tony Young
|
|
|
steve Phone #: ###-####,, need trades,, ok to one side interior walls
|
OVERRIDE | | | 10/22/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/22/2013 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2013 | | DONE |
Christina Prado
|
|
|
emailed Chris with Radix fees due
|
Permit Ready to Issue | | | 10/22/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 9/6/2013 | 9/6/2013 | 10/21/2013 | | PASS |
Sam Zahorka
|
|
|
1st review completed. ePlanReview - Level 3 TI - Jack In The Box
|
Routing - PLAN CHECK | 10/14/2013 | | 10/21/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | 10/14/2013 | | 10/17/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 10/14/2013 | | DONE |
Jason Blais
|
|
|
Plan resubmittals re-routed to applicable review disciplines.
|
Routing - Design Review | 10/14/2013 | | 10/14/2013 | | PASS |
Andrea Tuning
|
|
|
Site Plan has been redlined to require a Class II tree.
|
1st review completed | | | 10/8/2013 | | FAIL |
Jason Blais
|
|
|
Failed in DR, ESC and Building.
|
Routing Off Site - C.D.H | 9/6/2013 | | 10/8/2013 | | PASS |
Jason Blais
|
|
|
|
Routing PW Street Lights | 9/6/2013 | | 10/7/2013 | | PASS |
|
|
|
No street lighting required.
|
Routing PW Solid Waste | 9/6/2013 | | 10/7/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 9/6/2013 | | 10/7/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PLAN CHECK | 9/6/2013 | | 9/20/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - FIRE | 9/6/2013 | 9/6/2013 | 9/12/2013 | | PASS |
Craig D. Hanson
|
|
|
Attached review coments to case
|
Routing PW Sewer Rating | 9/6/2013 | | 9/10/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLUMBING | 9/6/2013 | | 9/10/2013 | | PASS |
Bill VanDegrift
|
|
|
May require additional backflow protection on installed equipment.
Per plan and ISPC.
|
Routing PW Drainage | 9/6/2013 | | 9/9/2013 | | PASS |
Brian Murphy
|
|
|
|
Pending Assignment by JCB | 9/6/2013 | | 9/6/2013 | | DONE |
Jason Blais
|
|
|
|
Routing - PLANNING | 9/6/2013 | | 9/6/2013 | | PASS |
Cody Riddle
|
|
|
Cody Riddle - (David Moser is out) CUP13-00042
|
Routing - Design Review | 9/6/2013 | | 9/6/2013 | | FAIL |
Andrea Tuning
|
|
|
Andrea Tuning - DRH13-00232
The applicant was required to install a Class II or Class III tree located near the northwest corner of the building. COndition 1b.
|
Routing - Addressing | 9/6/2013 | | 9/6/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/6/2013 | | 9/6/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 9/6/2013 | | 9/6/2013 | | FAIL |
Jason C. Taylor
|
|
|
Needs full ESC Plan and narritive.
|
Intake Approval | | | 9/5/2013 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Sam Zahorka on 9/4/13. Plan Review Fees paid on 9/5/13.
|
Application received | | | 8/28/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 28 2013 5:20PM
|