Second Notice | | 4/10/2014 | 4/3/2014 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Barber
|
First Notice | | 3/29/2014 | 3/31/2014 | | DONE |
Christina Prado
|
|
|
mailed 4-1-14
|
Permanent Occupancy | | | 3/19/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/18/2014 | 3/18/2014 | 3/18/2014 | P | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 3/13/2014 | 3/14/2014 | 3/14/2014 | A | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Plumbing signs off Perm.
|
FIRE-Final Inspection | 3/12/2014 | 3/13/2014 | 3/13/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Need to provide ADA hardware on the pocket door.
|
BLD-Other | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PART |
Jim Sly
|
|
|
Shaft wall inspection please-Steve Phone #: ###-#### Inspection of inside layer ( shaftwall Liner) and fire stopping of all penitrations in 1hr shaft ........starting from 3rd floor to the roof. Need to inspect outside layer and firestopping.
|
BLD-Other | 3/10/2014 | 3/10/2014 | 3/10/2014 | P | CANC |
Jim Sly
|
|
|
call 20 min before to meet // shaft wall insp// steve Phone #: ###-####
|
BLD-Conference | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | PART |
Jim Sly
|
|
|
steve Phone #: ###-#### Talked about 1 hr shaft with Steve (3rd floor only). Unable to see other floors.......No keys to rooms.
|
BLD-Framing/Rough-in | 1/24/2014 | 1/27/2014 | 1/27/2014 | A | PASS |
Dave Hannah
|
|
|
steve Phone #: ###-#### wood headers removed and steel installed
|
BLD-Conference | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | FAIL |
Dave Hannah
|
|
|
Steve-PLease call at least 15-20 mins prior to inspection Phone #: ###-#### remove wood beams over doors
|
BLD-Framing/Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | FAIL |
Jim Storey
|
|
|
Steve Phone #: ###-#### remove wood headers 3 locations/ seal floor penatrations/ ok to gyp exterior walls and interior that are clean.
|
Print Occupancy Form | | | 10/8/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/8/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/8/2013 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 9/4/2013 | 9/4/2013 | 10/3/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 10/1 Level 3 TI - ePlanReview
|
Routing - PLAN CHECK | 10/3/2013 | | 10/3/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2013 | | DONE |
|
|
|
|
1st review completed | | | 9/27/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 9/4/2013 | | 9/27/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
Routing - Addressing | 9/4/2013 | | 9/16/2013 | | PASS |
Emily Dixon
|
|
|
The suite number is 308
|
Routing - PLUMBING | 9/4/2013 | | 9/10/2013 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - FIRE | 9/4/2013 | 9/4/2013 | 9/9/2013 | | PASS |
Scott Arellano
|
|
|
Attached plans to case.
|
Routing - PUBLIC WORKS | 9/4/2013 | | 9/5/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 9/5/2013 | | 9/5/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 9/4/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Pending Assignment by JCB | 9/4/2013 | | 9/4/2013 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 8/29/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2013 9:43AM
|