First Notice | | 12/21/2013 | 12/30/2013 | | DONE |
|
|
|
|
BLD-Final | 12/10/2013 | 12/11/2013 | 12/11/2013 | A | PASS |
Jim Sly
|
|
|
DARREN Phone #: ###-#### OK for perm occ.
|
Permanent Occupancy UNPAID FEE | | | 12/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 12/10/2013 | 12/10/2013 | 12/10/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Fees Due Hold | 12/7/2013 | | 12/10/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Statement | | | 12/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 11/22/2013 | 11/22/2013 | 11/22/2013 | P | PART |
Jim Sly
|
|
|
Darren ###-#### OK for Temp Occ. OK for Perm Occ when....Fire spr, fire life, Electr. OK's for Perm Occ.
|
FIRE-Final Inspection | 11/20/2013 | 11/22/2013 | 11/22/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Romeo Gervais permission until the remaining sprinkler work is complete for the HC Company tenant.
|
BLD-Final | 11/21/2013 | 11/22/2013 | 11/22/2013 | A | NR |
Jim Sly
|
|
|
darren Phone #: ###-####
|
Temporary Occupancy | 11/22/2013 | 2/20/2014 | 11/22/2013 | | DONE |
Tisha Gallop
|
|
|
pending fire and structural
|
FIRE-Final Inspection | 11/21/2013 | 11/21/2013 | 11/21/2013 | P | FAIL |
Troy Cobbley
|
|
|
Need the exit signs and the emergency lights repaired prior to a temporary sign off.
|
FIRE-Final Inspection | 11/19/2013 | 11/20/2013 | 11/20/2013 | A | CANC |
Troy Cobbley
|
|
|
Not ready for life safety.
|
Print Occupancy Form | | | 11/20/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | CANC |
Troy Cobbley
|
|
|
Not ready for inspection. Rescheduled for tomorrow.
|
BLD-Ceiling Grid Inspection | 10/30/2013 | 10/31/2013 | 11/1/2013 | A | PASS |
Jim Sly
|
|
|
call 1/2 hr before // Darren Phone #: ###-####
|
BLD-Energy code compliance | 10/4/2013 | 10/7/2013 | 10/7/2013 | A | PASS |
Jim Sly
|
|
|
darren Phone #: ###-####
|
BLD-Framing/Rough-in | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Jim Sly
|
|
|
darren Phone #: ###-####
|
Print Occupancy Form | | | 10/4/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 10/4/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/4/2013 | | DONE |
Barbara Stitt
|
|
|
E-mailed Nick Van Diepen that permit is ready, fees due and need ACHD info on 10-4-13 @ 9:00am//BAS
|
Print Occupancy Form | | | 10/4/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 10/4/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 9/4/2013 | 9/4/2013 | 10/3/2013 | | PASS |
Carl Westfall
|
|
|
YMCA DAYCARE - ePlanReview - (20 days - Sept 27)
|
Routing - PLAN CHECK | 10/1/2013 | | 10/3/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2013 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/1/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/4/2013 | | 9/26/2013 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Sept 23 and finished on Sept 26. Revised drawings were required.
|
1st review completed | | | 9/26/2013 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 9/26/2013 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 9/4/2013 | | 9/25/2013 | | PASS |
Susan Scovel
|
|
|
|
Routing - FIRE | 9/4/2013 | 9/4/2013 | 9/12/2013 | | PASS |
Craig D. Hanson
|
|
|
Completed.
|
Routing - PLUMBING | 9/4/2013 | | 9/10/2013 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Erosion and Sediment | 9/4/2013 | | 9/5/2013 | | PASS |
Jason C. Taylor
|
|
|
ESC covered under ESC13-00358 for shell.
|
Routing PW Sewer Rating | 9/4/2013 | | 9/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plan Reviewer's activity | | | 9/4/2013 | | DONE |
Jason Blais
|
|
|
Emailed architect rep to contact ACHD for evaluation of any impact fees due. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
|
Routing - PLANNING | 9/4/2013 | | 9/4/2013 | | PASS |
Cody Riddle
|
|
|
Cody Riddle - CUP Exemption Letter uploaded into ePlanReview
The childcare facility is an approved accessory use in this location/building per the previous determination letter attached in ePlan Review.
|
Routing - Addressing | 9/4/2013 | | 9/4/2013 | | PASS |
Emily Dixon
|
|
|
Address is 12650 W Bridger St Suite 130.
|
Routing - PUBLIC WORKS | 9/4/2013 | | 9/4/2013 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 9/4/2013 | | 9/4/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 9/3/2013 | | FAIL |
|
|
|
Please re-upload sheet A6.11. The original upload failed.
|
Intake Approval | | | 9/3/2013 | | PASS |
Carl D Madsen
|
|
|
|
Application received | | | 8/29/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2013 4:51PM
|