Case Summary (BLD) | | | 8/6/2015 | | DONE |
|
|
|
|
BLD-Final | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | PASS |
Jim Sly
|
|
|
maggie Phone #: ###-#### OK for perm. occ.
|
FIRE-Final Inspection | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
First Notice | | 3/3/2014 | 2/21/2014 | | DONE |
Christina Prado
|
|
|
|
Permanent Occupancy | | | 2/21/2014 | | DONE |
Christina Prado
|
|
|
|
FIRE-Conference | 2/14/2014 | 2/14/2014 | 2/14/2014 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with the owner. The keyed deadbolt will need to removed from the door to the Brewing room. I let her know that single action will be required. Also the manual flush bolts in the in-active leaf of the main exit will need to be removed unless she can meet the exception or automatic flush bolts installed. She had no "small documents" either.
|
BLD-Conference | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | PART |
Tony Young
|
|
|
maggie Phone #: ###-####,, ?s on demising wall,, may need to go to architect
|
FIRE-Conference | 12/23/2013 | 12/24/2013 | 12/27/2013 | A | DONE |
Forrest France
|
|
|
Regarding project related hood suppression work.
|
FIRE-Conference | 12/23/2013 | 12/23/2013 | 12/23/2013 | A | DONE |
Forrest France
|
|
|
Regarding project related FIR permit.
|
OVERRIDE | | | 10/28/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/28/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 10/28/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/28/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 9/5/2013 | | 10/7/2013 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PLANNING | 9/5/2013 | | 10/7/2013 | | PASS |
Carl D Madsen
|
|
|
signed of per eplan
|
Routing - Addressing | 9/5/2013 | | 10/7/2013 | | PASS |
Carl D Madsen
|
|
|
signed off per eplan
|
Routing - PLAN CHECK | 10/7/2013 | | 10/7/2013 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2013 | | DONE |
|
|
|
|
Routing - PLUMBING | 10/4/2013 | | 10/4/2013 | | PASS |
Bill VanDegrift
|
|
|
per Bill V.
|
Routing PW Environmental | 10/3/2013 | | 10/3/2013 | | PASS |
Walt Baumgartner
|
|
|
Plan resubmit shows outside in ground GI, exact location at rear of building to be coordinated,
|
Routing - PUBLIC WORKS | 10/3/2013 | | 10/3/2013 | | PASS |
Beverly Mountain
|
|
|
|
1st review completed | | | 9/25/2013 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/5/2013 | | 9/25/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 9/5/2013 | | 9/23/2013 | | PASS |
Craig D. Hanson
|
|
|
Pending Building Official analysis of Occupancy Classification and Occupant Load.
|
Routing PW Environmental | 9/12/2013 | | 9/12/2013 | | FAIL |
Walt Baumgartner
|
|
|
Plans re-routed, no corrections provided. Grease interceptor required.
|
Routing PW Sewer Rating | 9/5/2013 | | 9/10/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLUMBING | 9/5/2013 | | 9/10/2013 | | FAIL |
Daryl Spivey
|
|
|
Resubmit with changes required by Public Works environmental.
|
Routing - Erosion and Sediment | 9/5/2013 | | 9/6/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Intake Approval | | | 9/5/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 9/5/2013 | | 9/5/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 9/5/2013 | | 9/5/2013 | | FAIL |
Walt Baumgartner
|
|
|
Changemark notation in ProjDox and phone call to engineer
|
Intake Approval | | | 9/3/2013 | | FAIL |
Tim L. Woodard
|
|
|
Elizabeth,
Submittal appears to be complete; however, sheet A2.0 and all M sheets do not account for required stamping area. Refer to the "Electronic Submittal Guide" for all E-Plan review requirements.
Best regards,
Tim Woodard
City of Boise
208 384 3817
twoodard@cityofboise.org
|
Application received | | | 8/30/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 30 2013 11:12AM
|