Third Notice | | 7/14/2014 | 8/5/2014 | | DONE |
|
|
|
This permit finaled on the web by David Moorhouse
|
Second Notice | | 6/20/2014 | 7/9/2014 | | DONE |
|
|
|
|
First Notice | 5/21/2014 | 5/21/2014 | 6/10/2014 | | DONE |
Jim Sly
|
|
|
Faxed 6-10-14
|
BLD-Final | 5/20/2014 | 5/20/2014 | 5/21/2014 | P | PASS |
Jim Sly
|
|
|
Dave-Please call for access code Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 5/21/2014 | 5/21/2014 | 5/21/2014 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 5/16/2014 | 5/19/2014 | 5/19/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 3/10/2014 | 3/11/2014 | 3/11/2014 | A | NR |
Jim Sly
|
|
|
call for lock box code// david Phone #: ###-#### Need Fire/Life safety final
|
BLD-Energy code compliance | 11/13/2013 | 11/14/2013 | 11/14/2013 | P | PASS |
Jim Sly
|
|
|
David-Please call for access information Phone #: ###-####
|
BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PART |
Jim Sly
|
|
|
David-Please call for access information Phone #: ###-#### C/N Arch to verify 1hr walls thru-out? Eng to approve additional loading on trusses.
|
OVERRIDE | | | 10/16/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 9/17/2013 | 9/17/2013 | 10/3/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 9/30 e plan level II
|
Routing - PLAN CHECK | 10/3/2013 | | 10/3/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2013 | | DONE |
|
|
|
|
1st review completed | | | 9/30/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 9/17/2013 | | 9/30/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
Routing - Addressing | 9/17/2013 | | 9/18/2013 | | PASS |
Emily Dixon
|
|
|
Need to include suite number 100.
|
Routing PW Sewer Rating | 9/17/2013 | | 9/18/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 9/17/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Erosion and Sediment | 9/17/2013 | | 9/17/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 9/17/2013 | | 9/17/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 9/16/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete and up load the 518 check list.
Please delete the sheets that were replaced by revised plans reading left to right. .
Please indicate the total length of all trench work. Concrete saw cutting where a total length is greater than 39 feet requires a ESC permit and waiver letter.
|
Intake Approval | | | 9/12/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete and up load the 518 check list.
Please re upload the drawings to read left to right.
Please provide required stamping area on drawings.
Please indicate the total length of all trench work. Concrete saw cutting where a total length is greater than 39 feet requires a ESC permit and waiver letter.
|
Payment Received | | | 9/6/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/6/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 6 2013 2:29PM
|