Permit Information
Permit NumberBLD13-02477
StatusFinaled
Name TRI-QUEST BUILDERS & DEVELOPERS INC
Site Address 305 S 6TH ST
Project NameChipotle Mexican Grill
Customer Number 
ePlanReviewYes
Description
(CHIPOTLE MEXICAN GRILL) This building has a fire sprinkler system. To construct interior tenant improvements for a new restaurant tenant within a new 1,809 square foot shell building. The building shell was constructed under permit BLD13-00731. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, a grease hood and duct, a dishwasher hood and duct, kitchen equipment, tables, stools, chairs, and interior finishes. To support roof top mechanical equipment, changes to the roof structure are required. Special Inspection is required for any field welding of roof trusses. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/10/20145/20/2014 DONE
Second Notice 4/11/20145/5/2014 DONE
First Notice 3/15/20144/1/2014 DONE
DetailsBarbara Stitt
Faxed 4-1-14
Permanent Occupancy  3/5/2014 DONE
DetailsChristina Prado
BLD-Final2/25/20142/26/20142/26/2014PPASS
DetailsDave Hannah
perry Phone #: ###-####
FIRE-Final Inspection2/21/20142/24/20142/24/2014APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
BLD-Other2/6/20142/7/20142/7/2014APASS
DetailsTony Young
acoustical ceiling // Perry Phone #: ###-####
BLD-Framing/Rough-in1/17/20141/17/20141/23/2014PPASS
DetailsDave Hannah
perry late as possible PLEASE Phone #: ###-####
BLD-Footing1/2/20141/2/20141/3/2014PPASS
DetailsDave Hannah
Rebar inspection please-Perry Phone #: ###-####
BLD-Concrete12/31/201312/31/201312/31/2013PCANC
DetailsJim Sly
Rebar - Perry Phone #: ###-####
Permit Ready to Issue  12/9/2013  
Issue PAID IN FULL permit  12/9/2013 DONE
Print Occupancy Form  12/9/2013 DONE
Plan assigned to (CJW)9/26/20139/26/201311/1/2013 PASS
DetailsCarl Westfall
CHIPOTLE - ePlanReview - Level 3 TI - (20 days - Oct 22)
Routing Off Site - C.D.H10/31/2013 11/1/2013 PASS
DetailsByron Grover
Routing - Design Review10/31/2013 11/1/2013 PASS
DetailsCody Riddle
Rails added to short exterior walls.

Approved. The rails are consistent with DR approval, and required for the patio by City Clerk and other agencies.

The awning over the public right-of-way is allowed through the master agreement with the Ada County Highway Distrct. CER
Routing - PLAN CHECK11/1/2013 11/1/2013 PASS
DetailsCarl Westfall
Drawings approved after issues were resolved.
PLANS/APPL TAKEN TO FRONT DESK  11/1/2013 DONE
Routing - PLAN CHECK10/29/2013 10/31/2013 FAIL
DetailsCarl Westfall
Item 35 that applies to the occupancy of the public way was not resolved.
Plan resubmittals received  10/29/2013 DONE
Plan resubmittals requested  10/11/2013 DONE
1st review completed  10/11/2013 DONE
Routing - PLAN CHECK9/26/2013 10/11/2013 FAIL
DetailsCarl Westfall
A few items need to be resolved.
Routing Off Site - C.D.H9/26/2013 10/8/2013 FAIL
DetailsByron Grover
Review not completed. Fee and more information required.
Routing - FIRE9/26/20139/26/201310/1/2013 PASS
DetailsCraig D. Hanson
Routing - Design Review9/26/2013 9/27/2013 PASS
DetailsSarah Schafer
Sarah Schafer Approved per DRH12-00319.
Plan Reviewer's activity  9/26/2013 DONE
DetailsJason Blais
Emailed contact to have him contact ACHD for evaluation of any additional impact fees are due. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
Routing PW Sewer Rating9/26/2013 9/26/2013 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste9/26/2013 9/26/2013 PASS
DetailsPeter J. McCullough
Routing PW Environmental9/26/2013 9/26/2013 PASS
DetailsWalt Baumgartner
GI installed w/ Shell & core. Kitchen plans show all necessary drainage route to GI, OK
Pending Assignment by JCB9/26/2013 9/26/2013 DONE
DetailsJason Blais
Routing - Erosion and Sediment9/26/2013 9/26/2013 PASS
DetailsEvan Jenkins
Routing - PLUMBING9/26/2013 9/26/2013 PASS
DetailsBill VanDegrift
1. Provide RPBP on filtered water.
2. Provide a RPBP on carbonater for soda.
3. May require an RPBP on rethermalizer equipment.
4. May requir additional backflow protection on equipment.
5. Provide tempered water to public lavs and hand wash sinks.
Routing - Addressing9/26/2013 9/26/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/26/2013 9/26/2013 PASS
DetailsBeverly Mountain
Payment Received  9/25/2013 DONE
Payment received via Govolutions
Intake Approval  9/25/2013 PASS
DetailsJason Blais
Prescreen passed on 9/23/13. Plan Review Fees paid on 9/25/13.
Intake Approval  9/19/2013 FAIL
DetailsTim L. Woodard
Please provide an ESC Waiver, ESC Application, and an exterior lighting compliance. Also please reupload sheet HD2 in the horizontal position.

Please email me with any questions,
twoodard@cityofboise.org
Application received  9/6/2013 DONE
Application submitted via PDS Online on Sep 6 2013 4:34PM