Permit Information
Permit NumberBLD13-02490
StatusFinaled
Name PERKINS CONSTRUCTION
Site Address 5009 W CASSIA ST
Project NameGood Shepherd Lutheran Church
Customer Number 
ePlanReviewYes
Description
(Good Shepherd Lutheran Church - parking lot) Grading permit to remove the existing parking lot and light poles and replace it with a new, larger parking lot approved by the Public Works Department. There will also be new light poles and landscaping as approved under DRH13-00293. No new buildings are to be constructed or installed under this permit. // leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/8/201411/20/2014 DONE
This permit finaled on the web by Maureen Yogerst
Second Notice 10/16/201411/3/2014 DONE
First Notice9/30/20149/30/201410/6/2014 DONE
DetailsPhil Shearer
BLD-Final9/29/20149/30/20149/30/2014APASS
DetailsPhil Shearer
Nick Phone #: ###-####
DOC - Permit Finaled9/30/20149/30/20149/30/2014PPASS
DetailsPhil Shearer
FIRE-Final Inspection9/26/20149/26/20149/26/2014PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection9/23/20149/23/20149/23/2014PFAIL
DetailsTroy Cobbley
Waiting of signage or curb painting(fire dept access) before a final sign off.
BLD-Other9/23/20149/23/20149/23/2014ADONE
DetailsLori Flook
Brian Murphy signed occupany card.
FIRE-Final Inspection9/19/20149/19/20149/19/2014PFAIL
DetailsTroy Cobbley
There were no city approved plans or fire review documents for the inspection so I spoke to Nick about a possible requirement for fire dept access signage. No actual inspection was performed.
PubWorks Occupancy Approval9/25/20149/25/20149/19/2014 DONE
DetailsLori Flook
Brian Murphy inspected
BLD-Other8/5/20148/6/20148/6/2014ACANC
DetailsPhil Shearer
George-seepage bed Phone #: ###-####
public owrks need to do the inspection
OVERRIDE  7/8/2014  
Issue PAID IN FULL permit  7/8/2014 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  7/8/2014 DONE
DetailsTisha Gallop
Permit Ready to Issue  7/8/2014 DONE
DetailsChristina Prado
Extend Review Timeline  3/27/2014 DONE
DetailsChristina Prado
180 day extension granted from 3/8/14
Plan assigned to (LEG) Tisha2/27/2014 3/18/2014 DONE
DetailsTisha Gallop
Routing - PLAN CHECK3/17/2014 3/18/2014 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  3/18/2014 DONE
DetailsTisha Gallop
Routing - Design Review3/17/2014 3/17/2014 PASS
DetailsAndrea Tuning
Plan resubmittals received  3/17/2014  
resub received
Routing - PLAN CHECK2/27/2014 3/17/2014 PASS
DetailsTisha Gallop
Tisha
Routing - Erosion and Sediment2/27/2014 3/12/2014 PASS
DetailsEvan Jenkins
Recieved this plan on 3-11-14 and approved
Routing PW Drainage2/27/2014 3/7/2014 PASS
DetailsBrian Murphy
Routing - FIRE2/27/20142/27/20143/5/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 03-05-14
Routing - PLANNING Land Div2/27/2014 2/28/2014 PASS
DetailsTodd Tucker
Routing - Addressing2/27/2014 2/27/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS2/27/2014 2/27/2014 PASS
DetailsBeverly Mountain
Routing - Design Review2/27/2014 2/27/2014 FAIL
DetailsAndrea Tuning
DRH13-00293 // All pole lighting is requried to be located outside of the required planters. Sheet E.01 should be modified to located the pole lighting outside of the interior planter island to comoply wtih the Design Review approval (DRH13-00293).
Routing PW Street Lights2/27/2014 2/27/2014 PASS
DetailsMike D Hedge
Plans ACCEPTED BY PLAN TECH  2/27/2014 DONE
DetailsTisha Gallop
Intake Approval  2/27/2014 PASS
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/27/2014 DONE
DetailsTisha Gallop
Application received  9/9/2013 DONE
Application submitted via PDS Online on Sep 9 2013 4:48PM