Permit Information
Permit NumberBLD13-02526
StatusFinaled
Name VISTA CONSTRUCTION INC
Site Address 813 S VISTA AVE
Project NameVista Bar Addition
Customer Number 
ePlanReviewYes
Description
(Vista Bar - Grading and Drainage) Permit to grub, clean , excavate, grade, import and compact site earth materials in preparation for future 945 sq. ft. addition to the Vista Bar. Scope of work for this permit includes installation of drainage swale and drainage retention features, underground power, new water line, landscape water backflow and lines, and relocate existing gas meter. All work is to be done according to the approved plans. No footings or construction is allowed under this permit. Any new parking lot work is NOT included in this permit. Ref DRH13-00262.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/7/20151/12/2015 DONE
Third Notice 12/7/20141/2/2015 DONE
sent with letter
Third Notice 11/15/201412/2/2014 DONE
follow up
Third Notice 10/11/201411/10/2014 DONE
mailed with letter
Third Notice 9/8/201410/6/2014 DONE
mailed to Vista Const
Third Notice 7/14/20149/3/2014 DONE
mailed to Vista Const
Third Notice 6/15/20147/9/2014 DONE
mailed to Vista Const
Second Notice 5/15/20146/10/2014 DONE
DetailsBarbara Stitt
FaxedFaxed 6-10-14
First Notice4/22/20144/22/20145/5/2014 DONE
DetailsTom Arcoraci
BLD-Final4/21/20144/22/20144/22/2014ADONE
DetailsTom Arcoraci
need to close out grading permit, main permit Bld13-02584 is finaled.
DOC - Permit Finaled4/22/20144/22/20144/22/2014PPASS
DetailsTom Arcoraci
PubWorks Occupancy Approval3/25/20143/25/20143/25/2014 DONE
DetailsTiffany Lowery
OVERRIDE  10/2/2013  
Issue PAID IN FULL permit  10/2/2013 DONE
Inspection Record Card- Bld  10/2/2013 DONE
DetailsTisha Gallop
Routing - Erosion and Sediment10/1/2013 10/2/2013 PASS
DetailsJason C. Taylor
Routing - PLAN CHECK10/1/2013 10/2/2013 PASS
DetailsTisha Gallop
passed all departments
PLANS/APPL TAKEN TO FRONT DESK  10/2/2013 DONE
DetailsTisha Gallop
Permit Ready to Issue  10/2/2013  
Plan assigned to (LEG) Tisha9/17/2013 10/2/2013 DONE
DetailsTisha Gallop
Plan resubmittals received  10/1/2013 DONE
Routing - PLAN CHECK9/26/2013 9/30/2013 PEND
DetailsTisha Gallop
failed ESC
Routing PW Drainage9/26/2013 9/26/2013 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment9/26/2013 9/26/2013 FAIL
DetailsJason C. Taylor
ESC Narritve needs edits. See changemarks for details. Jason Taylor ###-####.
1st review completed  9/26/2013 DONE
DetailsTisha Gallop
failed ESC and Drainage
Plan resubmittals received  9/26/2013 DONE
Routing - PLAN CHECK9/17/2013 9/23/2013 PASS
DetailsTisha Gallop
ePlan review
Routing PW Drainage9/17/2013 9/20/2013 FAIL
DetailsBrian Murphy
10 feet needed from foundation
Routing - PLANNING9/17/2013 9/19/2013 PASS
DetailsSue Cummings
Routing - PLUMBING9/17/2013 9/18/2013 PASS
DetailsDaryl Spivey
Install per ISPC.
Routing - FIRE9/17/20139/17/20139/17/2013 PASS
DetailsScott Arellano
No comments attached.
Routing PW Street Lights9/17/2013 9/17/2013 PASS
DetailsMike D Hedge
No street lighting required.
Routing - Addressing9/17/2013 9/17/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/17/2013 9/17/2013 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment9/17/2013 9/17/2013 FAIL
DetailsJason C. Taylor
Waiver Request DENIED. Two full sets of ESC plansd need to be submitted to the front desk for approval. Jason Taylor ###-####.
Plans ACCEPTED BY PLAN TECH  9/17/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  9/17/2013 DONE
DetailsChristina Prado
Intake Approval  9/16/2013 PASS
DetailsTisha Gallop
Application received  9/13/2013 DONE
Application submitted via PDS Online on Sep 13 2013 10:23AM
Intake Approval  9/13/2013 FAIL
DetailsTisha Gallop
just need water line location and details. Already spoke with Pat McKeegan.