Second Notice | | 2/7/2014 | 2/19/2014 | | DONE |
Christina Prado
|
|
|
completed 2-19-14
|
First Notice | | 1/5/2014 | 1/28/2014 | | DONE |
|
|
|
|
Zoning Approval | 12/26/2013 | 12/26/2013 | 12/26/2013 | | PASS |
Sarah Schafer
|
|
|
|
Permanent Occupancy | | | 12/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 12/20/2013 | 12/20/2013 | 12/20/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Final | 12/19/2013 | 12/20/2013 | 12/20/2013 | P | PASS |
Dave Hannah
|
|
|
gary Phone #: ###-####
|
FIRE-Conference | 12/18/2013 | 12/18/2013 | 12/18/2013 | P | DONE |
Forrest France
|
|
|
On site conference with contractor regarding project related fire sprinkler and hood suppression system work.
|
BLD-Ceiling Grid Inspection | 12/17/2013 | 12/17/2013 | 12/17/2013 | P | PASS |
Dave Hannah
|
|
|
GARY Phone #: ###-####
|
Plan assigned to (SRZ) | 11/26/2013 | 11/26/2013 | 11/27/2013 | | PASS |
Sam Zahorka
|
|
|
Panda Express - Plan Modification ePlanReview
|
Print Occupancy Form | | | 11/27/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/27/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 11/26/2013 | | 11/27/2013 | | PASS |
Sam Zahorka
|
|
|
Plan modification - umbrella structure at outdoor patio
|
Plan Modification Accepted | | | 11/26/2013 | | DONE |
Tisha Gallop
|
|
|
plan modification started in ePlanReview for the structural engineering for the outdoor umbrella
|
CHANGE STATUS TO (ISS) | | | 11/21/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 11/21/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 11/12/2013 | 11/12/2013 | 11/20/2013 | | PASS |
Sam Zahorka
|
|
|
Pending Fire and Plumbing to PASS. (Panda Express) - Plan Modification
|
Routing - PLAN CHECK | 11/20/2013 | | 11/20/2013 | | PASS |
Jason Blais
|
|
|
For Sam Zahorka. Plan Mod fees form uploaded into ePlanReview under Agency Comments.
|
Routing - FIRE | 11/14/2013 | 11/14/2013 | 11/19/2013 | | PASS |
Scott Arellano
|
|
|
See Fire Report Revision 1
|
Routing - PLUMBING | 11/14/2013 | | 11/19/2013 | | PASS |
Bill VanDegrift
|
|
|
1. DCVA on water service not to be installed more than 5 feet above floor.
2. RPBP required for soda machine.
3. Ice maker may require an DCVA if not air gapped.
4. RPBP required on chemical feeder if not air gapped.
5. Tempered water required at public handwash sinks.
6. Additional backflow protection may be required on installed equipment.
|
Routing PW Environmental | 11/14/2013 | | 11/15/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2013 | | 11/14/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing Off Site - C.D.H | 11/14/2013 | | 11/14/2013 | | PASS |
Jason Blais
|
|
|
Approved by Brigitta Gruenberg of CDHD in ePlanReview.
|
Routing PW Sewer Rating | 11/14/2013 | | 11/14/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/14/2013 | | 11/14/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2013 | | 11/14/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 11/14/2013 | | 11/14/2013 | | PASS |
Sam Zahorka
|
|
|
|
Plan Modification Accepted | | | 11/12/2013 | | DONE |
Christina Prado
|
|
|
request rec'd for plan mod per Angie B
|
Issue PAID IN FULL permit | | | 11/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 11/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 9/24/2013 | 9/24/2013 | 10/22/2013 | | PASS |
Sam Zahorka
|
|
|
2nd Review completed. 10/21/13 - 1st review completed. Level 3 TI - Panda Express
|
Permit Ready to Issue | | | 10/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 10/21/2013 | | 10/22/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/21/2013 | | 10/21/2013 | | FAIL |
Sam Zahorka
|
|
|
Called the architect and discussed the two last corrections.
|
1st review completed | | | 10/10/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 9/24/2013 | | 10/10/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing Off Site - C.D.H | 9/24/2013 | | 10/10/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - FIRE | 9/24/2013 | 9/24/2013 | 9/30/2013 | | PASS |
Craig D. Hanson
|
|
|
|
Routing PW Solid Waste | 9/24/2013 | | 9/26/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Rating | 9/24/2013 | | 9/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 9/24/2013 | | 9/25/2013 | | PASS |
Walt Baumgartner
|
|
|
GI in place as part of shell & core, OK
|
Routing - Design Review | 9/24/2013 | | 9/25/2013 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - DRH13-00284 Approved.
|
Routing - PLUMBING | 9/24/2013 | | 9/25/2013 | | PASS |
Bill VanDegrift
|
|
|
1. Provide DCVA on water service to bld.
2. Require a RPBP on Kay chemical feed system.
3. Install per ISPC.
|
Routing - Addressing | 9/24/2013 | | 9/24/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/24/2013 | | 9/24/2013 | | PASS |
Beverly Mountain
|
|
|
|
Plan Reviewer's activity | | | 9/24/2013 | | DONE |
Jason Blais
|
|
|
Emailed contact to have her contact ACHD for evaluation of any additional impact fees are due. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
|
Intake Approval | | | 9/24/2013 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCB | 9/24/2013 | | 9/24/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 9/18/2013 | | FAIL |
John Menard
|
|
|
Plan sheeet M600 was submitted; however, the Heating and Cooling load calculations were not included on that sheet. Please submit the required Heating and Cooling load calculations for this project. JCM
|
Intake Approval | | | 9/17/2013 | | FAIL |
John Menard
|
|
|
The submittal checklist indicates that the required Mechanical Comcheck energy compliance and the Heating and Cooling load calculations were submitted on plan sheet M600; however, it does not appear that plan sheet M600 was uploaded. Please upload plan sheet M600 with the required mechanical energy and load calculations. JCM
|
Intake Approval | | | 9/16/2013 | | FAIL |
John Menard
|
|
|
The permit application is not complete. Please complete a plan intake checklist for a level 3, major tenant improvement project. Please upload the completed checklist along with all of the applicable items required on the checklist. JCM
|
Payment Received | | | 9/14/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/14/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 14 2013 6:32PM
|