DOC - Permit Expired | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Jim Storey
|
|
|
Expires: 08/02/14
|
Letter of compliance/Occupancy | | | 4/14/2014 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/31/2014 | 2/3/2014 | 2/3/2014 | A | PASS |
Forrest France
|
|
|
"Wave four" completed. Final walkthrough passed. Fire life safety finaled.
|
BLD-Final | 1/30/2014 | 2/3/2014 | 2/3/2014 | A | PART |
Jim Storey
|
|
|
greg Phone #: ###-#### final ok pending ele.
|
FIRE-Final Inspection | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | DEFR |
Forrest France
|
|
|
Overbooked
|
FIRE-Final Inspection | 1/15/2014 | 1/16/2014 | 1/16/2014 | A | PART |
Forrest France
|
|
|
Fire life safety walkthrough completed for wave "two" and wave "three" project phases.
|
BLD-Final | 12/31/2013 | 1/2/2014 | 1/3/2014 | P | PART |
Jim Storey
|
|
|
greg Phone #: ###-####wave one ok need ada signage/ occ load sign ok fo temp.
|
FIRE-Final Inspection | 12/31/2013 | 1/2/2014 | 1/2/2014 | P | PART |
Forrest France
|
|
|
Completed fire life safety walkthrough of "wave one" areas as noted on plan set. Remainder of the tenant remodel examined for exit sign placement and locations.
|
FIRE-Conference | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | DONE |
Forrest France
|
|
|
Regarding project completion schedule
|
BLD-Framing/Rough-in | 10/14/2013 | 10/14/2013 | 10/14/2013 | A | PASS |
Jim Storey
|
|
|
ok to cover pending ele and plm
|
Plan assigned to (301) | 9/16/2013 | 9/16/2013 | 10/11/2013 | | PASS |
Jim Storey
|
|
|
|
Routing - PLAN CHECK | 9/16/2013 | | 10/11/2013 | | PASS |
Jim Storey
|
|
|
Jim Storey
|
Routing - MECHANICAL | 10/10/2013 | | 10/11/2013 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/11/2013 | | DONE |
Christina Prado
|
|
|
called Chris to advise permit is ready pending GC form and gave fees due
|
Permit Ready to Issue | | | 10/11/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2013 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/10/2013 | | DONE |
Christina Prado
|
|
|
received two sets of revised plan sheets marked M0.00, M2.11 & M2.12: routed to Troy(435) for review
|
Routing - PLUMBING | 9/23/2013 | | 9/23/2013 | | PASS |
Jim Johnson
|
|
|
as per plan and ISPC
|
Routing - MECHANICAL | 9/20/2013 | | 9/20/2013 | | FAIL |
Troy James
|
|
|
need mechanical engineers designed plans, emailed architect
|
Plan Reviewer's activity | | | 9/19/2013 | | DONE |
|
|
|
|
Print permit w/o conditions | | | 9/19/2013 | | |
|
|
|
|
1st review completed | | | 9/19/2013 | | |
|
|
|
|
Routing PW Sewer Rating | 9/18/2013 | | 9/18/2013 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | 9/16/2013 | 9/16/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/16/2013 | | DONE |
Barbara Stitt
|
|
|
|