Permit Information
Permit NumberBLD13-02584
StatusFinaled
Name VISTA CONSTRUCTION INC
Site Address 813 S VISTA AVE
Project NameVista Bar Addition
Customer Number 
ePlanReviewYes
Description
(VISTA BAR ADDITION) MODIFICATION TO REMOVE THE PARAPET FROM THE NORTH WALL. Permit for the construction of a 945 sq. ft. addition to an existing 2,545 sq. ft. bar with work to include the removal of a portion of the A-Frame roof to provide an opening between the new and existing structures, construction of the new wood framed addition and minor exterior improvements per hte approved pan, attached engineering and any notations. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/7/20151/12/2015 DONE
Third Notice 12/7/20141/2/2015 DONE
sent with letter
Third Notice 11/15/201412/2/2014 DONE
follow up
Third Notice 10/11/201411/10/2014 DONE
mailed with letter
Third Notice 9/8/201410/6/2014 DONE
mailed to Vista Const
Third Notice 7/14/20149/3/2014 DONE
mailed to Vista Const
Second Notice 6/20/20147/9/2014 DONE
First Notice 5/1/20146/10/2014 DONE
DetailsBarbara Stitt
Faxed 6-10-14
FIRE-Final Inspection4/21/20144/21/20144/21/2014PPASS
DetailsForrest France
Life safety final approved.
FIRE-Final Inspection4/21/20144/21/20144/21/2014PPASS
DetailsForrest France
Previous correction items completed and verified.
BLD-Final4/21/20144/21/20144/21/2014PPASS
DetailsTom Arcoraci
Mike ###-#### ok for perm
Zoning Approval4/21/20144/21/20144/21/2014 DONE
DetailsAndrea Tuning
Permanent Occupancy  4/21/2014 DONE
DetailsTisha Gallop
BLD-Final2/24/20142/25/20142/25/2014APART
DetailsTom Arcoraci
Mike Phone #: ###-#### ok for temp needs perm landing at rear door
FIRE-Final Inspection2/24/20142/25/20142/25/2014APART
DetailsForrest France
Fire life safety okay pending max. occupant sign is posted, manual thumbturn at the main entry/exit is removed, post signage at the main entry "door to remain unlocked....", landing is not yet complete at the back exit. Note* items to be completed prior to structural final.
BLD-Energy code compliance1/29/20141/29/20141/29/2014PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in1/28/20141/29/20141/29/2014APASS
DetailsTom Arcoraci
mike Phone #: ###-####
OVERRIDE  1/28/2014  
Permit Ready to Issue  1/28/2014 DONE
Print Occupancy Form  1/28/2014 DONE
DetailsChristina Prado
(F) Reprint permit  1/28/2014 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  1/28/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK1/22/2014 1/27/2014 PASS
DetailsCarl D Madsen
ePlan - Plan Mod
Plan assigned to (CDM)1/23/2014 1/27/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  1/27/2014 DONE
BLD-Framing/Rough-in1/21/20141/22/20141/22/2014APART
DetailsMike Jordan
partial - mike Phone #: ###-####. ok to rock mechanical wall for furnace, pending electrical.
Plan Modification Accepted  1/22/2014 DONE
DetailsChristina Prado
received request for plan modification
BLD-Conference1/8/20141/9/20141/9/2014APASS
DetailsJim Storey
Mike Phone #: ###-####
BLD-Conference12/26/201312/26/201312/26/2013PPASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Concrete12/11/201312/11/201312/11/2013PCANC
DetailsTom Arcoraci
BLD-Foundation12/9/201312/10/201312/10/2013APASS
DetailsTom Arcoraci
Dan Phone #: ###-####
BLD-Foundation12/6/201312/9/201312/9/2013ACANC
DetailsTom Arcoraci
dan Phone #: ###-####
BLD-Footing12/3/201312/3/201312/3/2013PPART
DetailsJim Storey
Dan Phone #: ###-#### ext ft ok
OVERRIDE  10/30/2013  
Issue PAID IN FULL permit  10/30/2013 DONE
DetailsBarbara Stitt
Print Occupancy Form  10/30/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  10/30/2013 DONE
DetailsBarbara Stitt
Routing Off Site - STRUCTURAL10/21/2013 10/29/2013 PASS
DetailsCarl D Madsen
Final resubmittal has adressed remaining review comments. There is no need to route back to off-site structural. CDM
Routing - PLAN CHECK10/21/2013 10/29/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/29/2013 DONE
Plan assigned to (CDM)9/26/2013 10/29/2013 PASS
DetailsCarl D Madsen
First review completed
Routing PW Street Lights9/26/2013 10/28/2013 PASS
DetailsMike D Hedge
No review required, no street lights required.
Routing - FIRE10/23/201310/23/201310/23/2013 PASS
DetailsCraig D. Hanson
Updated notes regarding Fire Sprinklers
Routing - Erosion and Sediment10/21/2013 10/23/2013 PASS
DetailsJason C. Taylor
1st review completed  10/7/2013 FAIL
Routing Off Site - STRUCTURAL9/26/2013 10/7/2013 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK9/26/2013 10/3/2013 FAIL
DetailsCarl D Madsen
Routing - FIRE9/26/20139/26/201310/1/2013 PASS
DetailsCraig D. Hanson
Sprinkler system required
Routing PW Sewer Rating9/26/2013 9/30/2013 PASS
DetailsConnie Baumgartner
Routing - PLUMBING9/26/2013 9/30/2013 PASS
DetailsDaryl Spivey
Require tempered water to public lavs.
Per plan and ISPC.
Routing - PLANNING Land Div9/26/2013 9/27/2013 PASS
DetailsDave Abo
Lots 2 & 3, Lamperts First Subdivision
Routing PW Drainage9/26/2013 9/27/2013 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment9/26/2013 9/27/2013 FAIL
DetailsJason C. Taylor
ESC Narritive needs revised. See Changemarks on other permit. Jason Taylor ###-####
Route to Impact Fee Review9/26/2013 9/27/2013 PASS
DetailsCindy M. Gould
Routing PW Environmental9/26/2013 9/27/2013 PASS
DetailsWalt Baumgartner
Bench Sewer bar only upgrade, no food prep
Routing - Design Review9/26/2013 9/26/2013 PASS
DetailsAndrea Tuning
Routing - Addressing9/26/2013 9/26/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/26/2013 9/26/2013 PASS
DetailsBeverly Mountain
Pending Assignment by JCM9/26/2013 9/26/2013 DONE
DetailsJohn Menard
Intake Approval  9/24/2013 FAIL
DetailsTim L. Woodard
Pat,

Refer to the redlines on attached doc. Need changes made to submittal. Also a few sheets uploaded vertically and need reuploaded horizontally.

Best regards,

Tim Woodard
Plans Examiner II / City of Boise
###-####
twoodard@cityofboise.org
Payment Received  9/20/2013 DONE
Payment received via Govolutions
Application received  9/19/2013 DONE
Application submitted via PDS Online on Sep 19 2013 10:32PM
Routing PW Solid Waste9/26/2013    
DetailsPeter J. McCullough