Third Notice | | 1/10/2015 | 1/16/2015 | | DONE |
|
|
|
This permit finaled on the web by Lisa Bawdon
|
Second Notice | | 12/13/2014 | 1/5/2015 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 1/5/15
|
First Notice | | 11/6/2014 | 12/3/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/27/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 10/17/2014 | 10/20/2014 | 10/20/2014 | A | PASS |
Mike Jordan
|
|
|
Thomas Phone #: ###-####. Ok for perm occ.
|
Telephone call | | | 10/10/2014 | | DONE |
Candy A. Nichols
|
|
|
called Lisa about temp occ-Lisa will do some research and either email Jason B or call in for the final
|
BLD-Final | 10/3/2014 | 10/6/2014 | 10/6/2014 | A | PASS |
Mike Jordan
|
|
|
Call prior to going Phone #: 8016338210 >> Inspection requested via mobile web by Thomas Nielson. ok for perm occ.
|
BLD-Final | 6/26/2014 | 6/27/2014 | 6/27/2014 | A | FAIL |
Mike Jordan
|
|
|
Sanford Phone #: ###-#### or store mngr ###-####. Testing criteria that was submitted does not meet NFPA701 or 289.
|
Temporary Occupancy | 5/6/2014 | 8/4/2014 | 5/6/2014 | | DONE |
Christina Prado
|
|
|
|
PubWorks Occupancy Approval | 5/6/2014 | 5/6/2014 | 5/6/2014 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 5/2/2014 | 5/5/2014 | 5/5/2014 | P | PART |
Mike Jordan
|
|
|
sanford Phone #: ###-####. Needs flame spread info for decorative trim. ok for temp occ.
|
FIRE-Final Inspection | 5/2/2014 | 5/5/2014 | 5/5/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 5/2/2014 | 5/5/2014 | 5/5/2014 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide the third E-stop, permianant mount the E-stop sign, provide additional warning signs at pumps, test the duct smoke detectors, blank the thumbturn lock at the main exit as discussed
|
BLD-Conference | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | DONE |
Mike Jordan
|
|
|
Sanford Phone #: ###-####. Need tactile exit signs at door #1 and #2. Provide smoke and flame spread for trees.
|
BLD-Ceiling Grid Inspection | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Jim Sly
|
|
|
stanford Phone #: ###-####
|
BLD-Energy code compliance | 3/5/2014 | 3/6/2014 | 3/6/2014 | A | PASS |
Mike Jordan
|
|
|
Exterior insulation - Sanford Phone #: ###-####
|
BLD-Energy code compliance | 2/25/2014 | 2/26/2014 | 2/26/2014 | A | PASS |
Mike Jordan
|
|
|
Stanford Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2014 | 2/24/2014 | 2/24/2014 | P | PASS |
Mike Jordan
|
|
|
sanford Phone #: ###-####. Ok to insulate exterior walls. Ok to cover interior walls.
|
BLD-Wall Bracing | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | PASS |
Mike Jordan
|
|
|
Water proofing - Sanford Phone #: ###-#### . Remainder of exterior shear walls ok to cover.
|
BLD-Energy code compliance | 2/6/2014 | 2/7/2014 | 2/7/2014 | P | PART |
Jim Sly
|
|
|
Sanford Phone #: ###-#### Walls each side of store front, North 1/4th of East wall, and all of North wall OK to cover. Inspection of approved washers on bolts at bottom wall track......OK.
|
BLD-Framing/Rough-in | 2/5/2014 | 2/6/2014 | 2/6/2014 | P | PART |
Mike Jordan
|
|
|
Partial - Sanford Phone #: ###-####. Exterior shear wall at souh west corner at exterior cooler, interior steel stud framed walls at north wall and partial east wall at interior cooler. Interior cooler portion ok to insulate. Per shear wall notes, needs to provide plate washers at shearwall areas on anchor bolts. Will verify at energy code inspection.
|
BLD-Foundation | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | PASS |
Mike Jordan
|
|
|
foundation insulation - Sanford Phone #: ###-####
|
BLD-Foundation | 1/7/2014 | 1/9/2014 | 1/9/2014 | A | PART |
Mike Jordan
|
|
|
sanford Phone #: ###-####. perimeter stemwalls. Work in progress, pending special inspection.
|
BLD-Footing | 1/2/2014 | 1/6/2014 | 1/6/2014 | A | PASS |
Mike Jordan
|
|
|
sanford PLEASE CALL BEFORE GOING OUT Phone #: ###-####. perimeter footings ok. Will have special inspection. also reviewed all special inspection reports to date for soils. ok.
|
Print Occupancy Form | | | 12/11/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/11/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/11/2013 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/13/2013 | | 11/29/2013 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2013 | | DONE |
|
|
|
|
Routing - PLUMBING | 11/29/2013 | | 11/29/2013 | | PASS |
Carl D Madsen
|
|
|
See E-Plan review
|
Plan assigned to (CDM) | 10/15/2013 | | 11/29/2013 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PLANNING Land Div | 10/15/2013 | | 11/29/2013 | | PASS |
Dave Abo
|
|
|
|
Routing PW Solid Waste | 10/15/2013 | | 11/29/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 11/13/2013 | | 11/20/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 11/13/2013 | | 11/14/2013 | | PASS |
Mike D Hedge
|
|
|
Street light reuirement dropped for this project. No street light required.
|
Routing - PUBLIC WORKS | 11/13/2013 | | 11/13/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 11/13/2013 | | 11/13/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 10/15/2013 | | 11/6/2013 | | FAIL |
Brian Murphy
|
|
|
needs absorbent for hydrocarbons
|
1st review completed | | | 11/6/2013 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/15/2013 | | 11/6/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/15/2013 | | 11/6/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 10/15/2013 | | 10/25/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Add Note - Contact Boise City Public Works for plug permit prior to plugging existing sewer service.
|
Routing - PLUMBING | 10/15/2013 | | 10/22/2013 | | FAIL |
Daryl Spivey
|
|
|
1) vents must be 6" above flood level before connecting to other vents.UPC 605.3
2)provide dcva on service line of provide 4" floor sink. upc603.3.9
3)provide RP upstream of filter water system. United Water rquirement.
4) provide RP upstream of the pressure water system. UPC table 6-2
|
Route to Impact Fee Review | 10/15/2013 | 10/18/2013 | 10/18/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 10/15/2013 | 10/15/2013 | 10/17/2013 | | PASS |
Craig D. Hanson
|
|
|
|
Routing - Design Review | 10/15/2013 | | 10/17/2013 | | PASS |
Josh Wilson
|
|
|
Ok per conditions of approval for DRH13-00192. JGW 10-17-13
|
Routing PW Sewer Rating | 10/15/2013 | | 10/16/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Street Lights | 10/15/2013 | | 10/16/2013 | | PASS |
Mike D Hedge
|
|
|
Street lights required, none shown on plans. See E-Plan review
|
Intake Approval | | | 10/15/2013 | | PASS |
|
|
|
fees paid
|
Routing PW Environmental | 10/15/2013 | | 10/15/2013 | | PASS |
Walt Baumgartner
|
|
|
GI indicated on plans for kitchen drainage
|
Routing - Addressing | 10/15/2013 | | 10/15/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/15/2013 | | 10/15/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 10/15/2013 | | 10/15/2013 | | PASS |
Evan Jenkins
|
|
|
|
Intake Approval | | | 10/3/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see change marks on 518 check list
|
Intake Approval | | | 9/25/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see change marks on 518 check list and change marks on drawings for items that need to be addressed.
|
Application received | | | 9/20/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 20 2013 10:50AM
|
Pending Assignment by JCM | 10/15/2013 | | | | |
John Menard
|
|
|
|