Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD13-02587
StatusFinaled
Name R & O CONSTRUCTION
Site Address 3080 S FIVE MILE RD
Project NameMaverik store #485
Customer Number 
ePlanReviewYes
Description
(MAVERIK COUNTRY STORE) Permit for the construction of a new 5,542 sq. ft. convenience store and fuel canopy. The main store area is 4,790 sq. ft. plus two 200 sq. ft. trellises on the north side of the building for a total building area of 5,542 sq. ft. The new fuel canopy is 52 feet X 108 feet totaling 5,616 sq. ft. Work will include construction of the new structures grading and drainage and landscaping. All work per the approved plans. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/10/20151/16/2015 DONE
This permit finaled on the web by Lisa Bawdon
Second Notice 12/13/20141/5/2015 DONE
DetailsCandy A. Nichols
sent in mail 1/5/15
First Notice 11/6/201412/3/2014 DONE
Permanent Occupancy  10/27/2014 DONE
DetailsChristina Prado
BLD-Final10/17/201410/20/201410/20/2014APASS
DetailsMike Jordan
Thomas Phone #: ###-####. Ok for perm occ.
Telephone call  10/10/2014 DONE
DetailsCandy A. Nichols
called Lisa about temp occ-Lisa will do some research and either email Jason B or call in for the final
BLD-Final10/3/201410/6/201410/6/2014APASS
DetailsMike Jordan
Call prior to going Phone #: 8016338210 >> Inspection requested via mobile web by Thomas Nielson. ok for perm occ.
BLD-Final6/26/20146/27/20146/27/2014AFAIL
DetailsMike Jordan
Sanford Phone #: ###-#### or store mngr ###-####. Testing criteria that was submitted does not meet NFPA701 or 289.
Temporary Occupancy5/6/20148/4/20145/6/2014 DONE
DetailsChristina Prado
PubWorks Occupancy Approval5/6/20145/6/20145/6/2014 DONE
DetailsTiffany Lowery
BLD-Final5/2/20145/5/20145/5/2014PPART
DetailsMike Jordan
sanford Phone #: ###-####. Needs flame spread info for decorative trim. ok for temp occ.
FIRE-Final Inspection5/2/20145/5/20145/5/2014APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval5/2/20145/5/20145/5/2014 PASS
DetailsJosh Wilson
FIRE-Final Inspection4/30/20144/30/20144/30/2014PFAIL
DetailsTroy Cobbley
Provide the third E-stop, permianant mount the E-stop sign, provide additional warning signs at pumps, test the duct smoke detectors, blank the thumbturn lock at the main exit as discussed
BLD-Conference4/30/20144/30/20144/30/2014PDONE
DetailsMike Jordan
Sanford Phone #: ###-####. Need tactile exit signs at door #1 and #2. Provide smoke and flame spread for trees.
BLD-Ceiling Grid Inspection3/31/20143/31/20143/31/2014PPASS
DetailsJim Sly
stanford Phone #: ###-####
BLD-Energy code compliance3/5/20143/6/20143/6/2014APASS
DetailsMike Jordan
Exterior insulation - Sanford Phone #: ###-####
BLD-Energy code compliance2/25/20142/26/20142/26/2014APASS
DetailsMike Jordan
Stanford Phone #: ###-####
BLD-Framing/Rough-in2/21/20142/24/20142/24/2014PPASS
DetailsMike Jordan
sanford Phone #: ###-####. Ok to insulate exterior walls. Ok to cover interior walls.
BLD-Wall Bracing2/20/20142/21/20142/21/2014APASS
DetailsMike Jordan
Water proofing - Sanford Phone #: ###-#### . Remainder of exterior shear walls ok to cover.
BLD-Energy code compliance2/6/20142/7/20142/7/2014PPART
DetailsJim Sly
Sanford Phone #: ###-####
Walls each side of store front, North 1/4th of East wall, and all of North wall OK to cover. Inspection of approved washers on bolts at bottom wall track......OK.
BLD-Framing/Rough-in2/5/20142/6/20142/6/2014PPART
DetailsMike Jordan
Partial - Sanford Phone #: ###-####. Exterior shear wall at souh west corner at exterior cooler, interior steel stud framed walls at north wall and partial east wall at interior cooler. Interior cooler portion ok to insulate. Per shear wall notes, needs to provide plate washers at shearwall areas on anchor bolts. Will verify at energy code inspection.
BLD-Foundation1/10/20141/13/20141/13/2014APASS
DetailsMike Jordan
foundation insulation - Sanford Phone #: ###-####
BLD-Foundation1/7/20141/9/20141/9/2014APART
DetailsMike Jordan
sanford Phone #: ###-####.
perimeter stemwalls. Work in progress, pending special inspection.
BLD-Footing1/2/20141/6/20141/6/2014APASS
DetailsMike Jordan
sanford PLEASE CALL BEFORE GOING OUT Phone #: ###-####. perimeter footings ok. Will have special inspection. also reviewed all special inspection reports to date for soils. ok.
Print Occupancy Form  12/11/2013 DONE
Permit Ready to Issue  12/11/2013  
Issue PAID IN FULL permit  12/11/2013 DONE
Routing Off Site - STRUCTURAL11/13/2013 11/29/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/29/2013 DONE
Routing - PLUMBING11/29/2013 11/29/2013 PASS
DetailsCarl D Madsen
See E-Plan review
Plan assigned to (CDM)10/15/2013 11/29/2013 PASS
DetailsCarl D Madsen
First review completed
Routing - PLANNING Land Div10/15/2013 11/29/2013 PASS
DetailsDave Abo
Routing PW Solid Waste10/15/2013 11/29/2013 PASS
DetailsPeter J. McCullough
Routing PW Drainage11/13/2013 11/20/2013 PASS
DetailsBrian Murphy
Routing PW Street Lights11/13/2013 11/14/2013 PASS
DetailsMike D Hedge
Street light reuirement dropped for this project. No street light required.
Routing - PUBLIC WORKS11/13/2013 11/13/2013 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK11/13/2013 11/13/2013 PASS
DetailsCarl D Madsen
Routing PW Drainage10/15/2013 11/6/2013 FAIL
DetailsBrian Murphy
needs absorbent for hydrocarbons
1st review completed  11/6/2013 FAIL
Routing Off Site - STRUCTURAL10/15/2013 11/6/2013 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK10/15/2013 11/6/2013 FAIL
DetailsCarl D Madsen
Routing PW Sewer Design10/15/2013 10/25/2013 PASS
DetailsKyle S. Rosenmeyer
Add Note - Contact Boise City Public Works for plug permit prior to plugging existing sewer service.
Routing - PLUMBING10/15/2013 10/22/2013 FAIL
DetailsDaryl Spivey
1) vents must be 6" above flood level before connecting to other vents.UPC 605.3
2)provide dcva on service line of provide 4" floor sink. upc603.3.9
3)provide RP upstream of filter water system. United Water rquirement.
4) provide RP upstream of the pressure water system. UPC table 6-2
Route to Impact Fee Review10/15/201310/18/201310/18/2013 PASS
DetailsCindy M. Gould
Routing - FIRE10/15/201310/15/201310/17/2013 PASS
DetailsCraig D. Hanson
Routing - Design Review10/15/2013 10/17/2013 PASS
DetailsJosh Wilson
Ok per conditions of approval for DRH13-00192. JGW 10-17-13
Routing PW Sewer Rating10/15/2013 10/16/2013 PASS
DetailsConnie Baumgartner
Routing PW Street Lights10/15/2013 10/16/2013 PASS
DetailsMike D Hedge
Street lights required, none shown on plans. See E-Plan review
Intake Approval  10/15/2013 PASS
fees paid
Routing PW Environmental10/15/2013 10/15/2013 PASS
DetailsWalt Baumgartner
GI indicated on plans for kitchen drainage
Routing - Addressing10/15/2013 10/15/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/15/2013 10/15/2013 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment10/15/2013 10/15/2013 PASS
DetailsEvan Jenkins
Intake Approval  10/3/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Please see change marks on 518 check list
Intake Approval  9/25/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Please see change marks on 518 check list and change marks on drawings for items that need to be addressed.
Application received  9/20/2013 DONE
Application submitted via PDS Online on Sep 20 2013 10:50AM
Pending Assignment by JCM10/15/2013    
DetailsJohn Menard