Permit Information
Permit NumberBLD13-02609
StatusFinaled
Name BECK CONSTRUCTION INC
Site Address 1218 E BANNOCK ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the addition of 455 sq. ft (5-20-14 per CDM changed from 299 sq.ft. to 455 sq ft) to the main level and 560 sq. ft. to the basement of the existing structure , construction of a 720 sq. ft. detached garage and the interior renovation of the existing structure per the attached engineering and any notations. R-2H zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/10/201412/10/201412/10/2014PPASS
DetailsDave Hannah
Final Building Inspection has been completed. Final sign off was pending until zoning approval. Zoning approved this am by Sarah Shafer. Phone #: ###-#### Inspection requested via web by Gary Beck
DOC - Permit Finaled12/10/201412/10/201412/10/2014PPASS
DetailsDave Hannah
Zoning Approval12/10/201412/10/201412/10/2014 PASS
DetailsSarah Schafer
BLD-Final12/1/201412/1/201412/1/2014PPEND
DetailsDave Hannah
For access, please call Gary 30-40 min prior to inspection. Thanks. Phone #: ###-#### Inspection requested via web by Gary Beck needs zoning final ok after that
BLD-Framing/Rough-in6/18/20146/18/20146/18/2014PPASS
DetailsTom Arcoraci
Request is for framing inspection on the detached garage Phone #: ###-#### >> Inspection requested via web by Gary Beck garage ok for cover 408
BLD-Energy code compliance5/22/20145/23/20145/23/2014APASS
DetailsDave Hannah
>> Inspection requested via web by Gary Beck
BLD-Wall cover5/22/20145/23/20145/23/2014APASS
DetailsDave Hannah
>> Inspection requested via web by Gary Beck
BLD-Framing/Rough-in5/18/20145/19/20145/19/2014PPART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Gary Beck needs mec rough in needs windows removed and screens installed on back porch.
Plan Modification Accepted  5/19/2014 DONE
new manual j
Routing - MECHANICAL5/19/2014 5/19/2014 PASS
DetailsTroy James
manual j report
BLD-Foundation4/23/20144/24/20144/24/2014APASS
DetailsDave Hannah
Jay Phone #: ###-####
BLD-Footing4/22/20144/22/20144/23/2014PPASS
DetailsDave Hannah
Ben Phone #: ###-####
BLD-Foundation2/6/20142/6/20142/6/2014APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Ben Sears
BLD-Footing2/4/20142/4/20142/5/2014PPART
DetailsDave Hannah
Jay Phone #: ###-#### basement ftgs crew will tent and heat
Issue PAID IN FULL permit  12/10/2013 DONE
DetailsTisha Gallop
OVERRIDE  11/13/2013  
Telephone call  11/13/2013 DONE
DetailsChristina Prado
Gave Catherine fees due and advised GC form is required prior to issuance
Permit Ready to Issue  11/13/2013 DONE
DetailsChristina Prado
Routing Walk-In (BLD)11/12/201311/12/201311/12/2013PPASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/12/2013 DONE
Case Summary (BLD)  11/12/2013 DONE
Inspection Record Card- Bld  11/12/2013 DONE
Application received 9/24/20139/24/2013 DONE
DetailsBarbara Stitt
Routing Walk-In (Zoning)9/24/20139/24/20139/24/2013PPASS
DetailsSarah Schafer
Approved per DRH13-00066.
Routing Walk-In (BLD)9/24/20139/24/20139/24/2013PFAIL
DetailsPerry Paine
Need existing structure eng analysis, engineered foundation design and helicle pier design and proceedure for helical pier installation. pep 9-24-2013 3:34 p.m.
1st review completed  9/24/2013 DONE