BLD-Final | 8/7/2014 | 8/8/2014 | 8/8/2014 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 8/8/2014 | 8/8/2014 | 8/8/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 4/29/2014 | 5/5/2014 | 5/5/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/29/2014 | 5/1/2014 | 5/1/2014 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | PART |
Tom Arcoraci
|
|
|
Clint Phone #: ###-#### can light sheet rocked
|
BLD-Other | 4/18/2014 | 4/21/2014 | 4/21/2014 | A | PASS |
Dave Hannah
|
|
|
sheet rock for fire rating in basement// Celo Phone #: ###-####
|
BLD-Wall Bracing | 4/7/2014 | 4/8/2014 | 4/8/2014 | P | PASS |
Dave Hannah
|
|
|
Rudy Phone #: ###-####
|
BLD-Wall Bracing | 4/2/2014 | 4/3/2014 | 4/4/2014 | P | PART |
Dave Hannah
|
|
|
Rudy Phone #: ###-#### ok to cover second level
|
BLD-Foundation | 10/29/2013 | 10/29/2013 | 10/29/2013 | P | PASS |
Tom Arcoraci
|
|
|
will be ready at 2:30 // Juan Phone #: ###-####
|
BLD-Concrete | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | PASS |
Jim Sly
|
|
|
juan Phone #: ###-#### Footing subgrade OK'd by Jason Taylor.
|
PubWorks Subgrade Approval | 10/28/2013 | 10/28/2013 | 10/28/2013 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/15/2013 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/14/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/14/2013 | | |
|
|
|
|
Telephone call | | | 10/14/2013 | | |
|
|
|
10-14-13 called left message permit ready and fee given ///dld
|
Routing - Erosion and Sediment | 10/10/2013 | | 10/14/2013 | | PASS |
Evan Jenkins
|
|
|
|
Plan assigned to (PEP) | 10/9/2013 | 10/9/2013 | 10/10/2013 | | FAIL |
Perry Paine
|
|
|
(Structural review completed need ESC and PW Hillside signoff
|
Application received | | 9/25/2013 | 10/10/2013 | | FAIL |
|
|
|
(Structural review completed need ESC and PW Hillside signoff
|
Routing - PLAN CHECK | | | 10/10/2013 | | PASS |
Perry Paine
|
|
|
need ESC & Public Works-Hillside signoff
|
1st review completed | | | 10/10/2013 | | FAIL |
|
|
|
|
Routing PW Grading-Hillside | 10/10/2013 | | 10/10/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan assigned to (JG) | | 9/25/2013 | 10/9/2013 | | DEFR |
Javier Guzman
|
|
|
Due 10/14 L2-
|
Routing - FIRE | 10/2/2013 | 9/25/2013 | 10/8/2013 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 9/30/2013 | | 10/2/2013 | | FAIL |
Evan Jenkins
|
|
|
ESC Plan Waiver Letter was not submitted with application. Please submit waiver letter for approval.
|
Routing - MECHANICAL | | | 9/30/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/26/2013 | | 9/30/2013 | | PASS |
Joshua Johnson
|
|
|
Does not meet front setback
|
Route to Impact Fee Review | 9/25/2013 | 9/30/2013 | 9/27/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 9/25/2013 | 9/28/2013 | 9/27/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 9/25/2013 | | 9/26/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 9/26/2013 | | 9/26/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 9/25/2013 | | 9/26/2013 | | FAIL |
Jason C. Taylor
|
|
|
Grading plans are not signed by the engineer. Please re-submit 3 signed copies of the grading plan. Jason Taylor ###-####
|
Plan resubmittals received | | | 9/26/2013 | | DONE |
Tisha Gallop
|
|
|
received three coipes of plan sheet G1; put with plans currently in Planning.
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/25/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/25/2013 | | DONE |
Christina Prado
|
|
|
|