Case Summary (BLD) | | | 9/10/2015 | | DONE |
|
|
|
|
Second Notice | | 6/16/2014 | 6/11/2014 | | DONE |
|
|
|
This permit finaled on the web by Robert Carlton
|
First Notice | 4/25/2014 | 4/25/2014 | 6/6/2014 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/24/2014 | 4/25/2014 | 4/25/2014 | A | PASS |
Tom Arcoraci
|
|
|
robert Phone #: ###-####
|
DOC - Permit Finaled | 4/25/2014 | 4/25/2014 | 4/25/2014 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 4/24/2014 | 4/24/2014 | 4/24/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 4/22/2014 | 4/23/2014 | 4/23/2014 | P | NR |
Tom Arcoraci
|
|
|
Jerry Crawford Phone #: ###-####
|
FIRE-Final Inspection | 4/22/2014 | 4/23/2014 | 4/23/2014 | A | FAIL |
Forrest France
|
|
|
HVAC unit did not shut down upon smoke detection. Verified new annunciator and repaired exit signs and emergency lights. Need to remove non-applicable address numbers adjacent to the main entry exit doors.
|
FIRE-Final Inspection | 4/3/2014 | 4/4/2014 | 4/4/2014 | P | FAIL |
Troy Cobbley
|
|
|
Repair the exit sign and the exit discharge lights. One hvac unit has a duct smoke detector that did not shut down the unit upon activation and does not have the required remote annunciator. Fire extinguishers have been mounted.
|
Plan Reviewer's activity | | | 3/14/2014 | | DONE |
Sam Zahorka
|
|
|
No occupancy group or occupant load for means of egress has been determined. A separate T.I. is required for occupancy. All exit door hardware will be required to meet the 2012 IBC and 2012 IFC prior to occupancy of this tenant space. I have spoken with the Fire inspector and building inspector.
|
BLD-Final | 1/24/2014 | 1/27/2014 | 1/27/2014 | P | NR |
Tom Arcoraci
|
|
|
Robert Phone #: ###-####
|
FIRE-Final Inspection | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide duct smoke detector and remoter annunciator in hvac unit 5 as per the plans (and test), hvac unit 6 shows a duct smoke detector as well and if installed will need an annunciator and tested too. Also need panic hardware on the two north exits as per the door schedule, need to repair the two exit discharge lights at the north exits and mount the four fire extinguishers as discussed.
|
FIRE-Final Inspection | 1/24/2014 | 1/27/2014 | 1/27/2014 | A | FAIL |
Troy Cobbley
|
|
|
Contractor was not on site and I could not locate any city approved drawings.
|
BLD-Framing/Rough-in | 12/17/2013 | 12/18/2013 | 12/18/2013 | A | PASS |
Tom Arcoraci
|
|
|
Jerry Crawford Phone #: ###-####
|
BLD-Footing | 11/14/2013 | 11/14/2013 | 11/14/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 11/13/2013 | 11/14/2013 | 11/14/2013 | A | PASS |
Tom Arcoraci
|
|
|
jerry Phone #: ###-#### spec insp on site
|
Permit Ready to Issue | | | 11/6/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 11/6/2013 | | DONE |
Christina Prado
|
|
|
emailed Chris Miles with Hansen Rice fee due
|
Inspection Record Card- Bld | | | 11/6/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 11/6/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | 11/4/2013 | 11/4/2013 | 11/5/2013 | | PASS |
Craig D. Hanson
|
|
|
|
Plan assigned to (SRZ) | 10/2/2013 | 10/2/2013 | 11/5/2013 | | PASS |
Sam Zahorka
|
|
|
Pending Fire to PASS -
2nd review completed. Level 3 TI - ePlanReview - 5823 Franklin
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2013 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 11/5/2013 | | DONE |
Tisha Gallop
|
|
|
received phone call from Miguel Gaddi (tenant) and told him need GC Initial Value, GC form and ACHD then pay permit fees.
|
Routing - FIRE | 10/31/2013 | 10/31/2013 | 11/4/2013 | | FAIL |
Craig D. Hanson
|
|
|
Failed per SRZ. No Fire Code plan review report attached at this time.
|
Routing - PLAN CHECK | 11/4/2013 | | 11/4/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/31/2013 | | 11/1/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - FIRE | 10/2/2013 | 10/2/2013 | 10/31/2013 | | FAIL |
Craig D. Hanson
|
|
|
Plans checking on history of building and sprinkler conditions stated.
|
Routing - Erosion and Sediment | 10/2/2013 | | 10/31/2013 | | PASS |
Evan Jenkins
|
|
|
|
Routing PW Drainage | 10/2/2013 | | 10/31/2013 | | PASS |
Brian Murphy
|
|
|
|
1st review completed | | | 10/28/2013 | | |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/2/2013 | | 10/24/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLUMBING | 10/2/2013 | | 10/4/2013 | | PASS |
Bill VanDegrift
|
|
|
no new plumbing
|
Routing - Design Review | 10/2/2013 | | 10/4/2013 | | PASS |
Josh Wilson
|
|
|
Ok per CZC13-00210
|
Route to Impact Fee Review | 10/2/2013 | 10/7/2013 | 10/3/2013 | | PASS |
Cindy M. Gould
|
|
|
No new sq footage no impact fees applied
|
Routing PW Sewer Rating | 10/2/2013 | | 10/2/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 10/2/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Tim Woodard and Plan Review Fees paid.
|
Pending Assignment by JCB | 10/2/2013 | | 10/2/2013 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 10/2/2013 | | 10/2/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/2/2013 | | 10/2/2013 | | PASS |
Beverly Mountain
|
|
|
Roof drain plumbing and groundwater letter attached in ePlanReview.
|
Application received | | | 9/26/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 26 2013 2:04AM
|