BLD-Final | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PASS |
Jim Storey
|
|
|
Ray Phone #: ###-####
|
DOC - Permit Finaled | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | DEFR |
Jim Storey
|
|
|
Ray Phone #: ###-####
|
PubWorks Occupancy Approval | 8/11/2014 | 8/11/2014 | 8/11/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 7/31/2014 | 8/1/2014 | 8/1/2014 | A | NR |
Jim Storey
|
|
|
Ray-call for access Phone #: ###-#### need pw sign off
|
BLD-Energy code compliance | 5/9/2014 | 5/12/2014 | 5/12/2014 | A | PASS |
Jim Storey
|
|
|
Ray Phone #: ###-####
|
BLD-Framing/Rough-in | 5/8/2014 | 5/8/2014 | 5/8/2014 | P | PASS |
Jim Storey
|
|
|
Ray Phone #: ###-#### phone # could be ###-####5072fire blk entry at ceilling line/ web brace a26/ foam seal vent pipe. ok to insulate
|
Plan Modification Accepted | | | 4/28/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 4/28/2014 | | 4/28/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Wall Bracing | 4/22/2014 | 4/23/2014 | 4/23/2014 | A | PASS |
Jim Storey
|
|
|
carlos Phone #: ###-####
|
BLD-Footing | 3/19/2014 | 3/20/2014 | 3/20/2014 | A | PASS |
Jim Storey
|
|
|
jared Phone #: ###-####
|
BLD-Footing | 3/19/2014 | 3/19/2014 | 3/19/2014 | P | NR |
Jim Storey
|
|
|
Jared Phone #: ###-#### need pw sign off
|
PubWorks Subgrade Approval | 3/19/2014 | 3/19/2014 | 3/19/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/27/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 11/26/2013 | | |
|
|
|
|
Plan assigned to (JG) | 10/29/2013 | 10/29/2013 | 11/26/2013 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 11/15 L2 ePlan
|
Routing - PLAN CHECK | 11/25/2013 | | 11/26/2013 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/26/2013 | | 11/26/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan reviewed in ePlan. Approved.
|
CHANGE STATUS TO (REV) | | | 11/26/2013 | | DONE |
Tisha Gallop
|
|
|
change status out of FEE, routed to Erosion
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 11/25/2013 | | 11/25/2013 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 11/25/2013 | | 11/25/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 11/14/2013 | | 11/25/2013 | | FAIL |
Javier Guzman
|
|
|
Need engineering for footing and foundations
|
Routing - Addressing | 10/29/2013 | | 11/25/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PLAN CHECK | 10/29/2013 | | 11/14/2013 | | FAIL |
Javier Guzman
|
|
|
PRJ DOX CASE
|
1st review completed | | | 11/14/2013 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 11/5/2013 | | 11/5/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to Legend
|
Routing - MECHANICAL | 11/5/2013 | | 11/5/2013 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 10/29/2013 | | 11/1/2013 | | FAIL |
Troy James
|
|
|
eplan
|
Route to Impact Fee Review | 10/29/2013 | 11/1/2013 | 10/30/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 10/29/2013 | 11/1/2013 | 10/30/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 10/29/2013 | 10/29/2013 | 10/30/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - PLANNING | 10/29/2013 | | 10/30/2013 | | PASS |
Colleen T Carroll
|
|
|
|
Payment Received | | | 10/29/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 10/29/2013 | | PASS |
|
|
|
|
Routing PW Grading-Hillside | 10/29/2013 | | 10/29/2013 | | FAIL |
Jason C. Taylor
|
|
|
Geotechnical report gives a five foot setback from the toe of the slope. Slope has been modified with a retaining wall which puts the toe of the slope at the base of the wall. Grading plan shows the structure closer than five feet from this wall. Pleae revise grading plan to reflect the five foot separation of structure to wall or have geotechnical engineer revise geotechnical report to reflect closer setback. Jason Taylor ###-####.
|
Routing - PUBLIC WORKS | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | | 9/26/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 26 2013 10:18AM
|