BLD-Final | 10/9/2013 | 10/9/2013 | 10/9/2013 | P | PASS |
Mike Jordan
|
|
|
call 10 min before to meet // Ayad Phone #: ###-####. Ok for porm. occ.
|
Permanent Occupancy | | | 10/9/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/7/2013 | 10/8/2013 | 10/8/2013 | A | FAIL |
Troy Cobbley
|
|
|
I left a voice message on the contacts phone that I was on the way. I arrived at the job site and was locked up with no access. No inspection was performed. ayad Phone #: ###-####
|
BLD-Final | 10/7/2013 | 10/8/2013 | 10/8/2013 | P | CANC |
Mike Jordan
|
|
|
ayad Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/7/2013 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 9/26/2013 | | 10/3/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/26/2013 | | 10/3/2013 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 10/3/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/3/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 10/3/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2013 | | |
|
|
|
|
Telephone call | | | 10/3/2013 | | |
|
|
|
10-3-13 called Ayad permit ready for pick up ///dld
|
Plans ACCEPTED BY PLAN TECH | | | 9/26/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/26/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 9/26/2013 | | | |
|
|
|
|