Permit Information
Permit NumberBLD13-02646
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5618 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2,366 sq. ft., two story (first story 1,106 sq. ft., second story 1,260 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 164 sq. ft. of covered patio/porch and a 629 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-1C zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/22/20149/22/20149/22/2014APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled9/22/20149/22/20149/22/2014PPASS
DetailsPhil Shearer
BLD-Final8/29/20149/2/20149/2/2014ACANC
DetailsPhil Shearer
Phone #: ###-#### >> Inspection requested via web by Clint Wall
PubWorks Subgrade Approval8/29/20148/29/20148/29/2014 DONE
DetailsJason C. Taylor
*LATE* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####. (This was not recieved prior to footing being poured)
PubWorks Occupancy Approval8/29/20148/29/20148/29/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance7/17/20147/18/20147/18/2014APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in7/14/20147/16/20147/16/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Other7/11/20147/14/20147/15/2014PPASS
DetailsJim Sly
Fire Sofits inspection Phone #: ###-####
BLD-Wall Bracing6/30/20146/30/20146/30/2014PPASS
DetailsJim Storey
Joey Phone #: ###-####
BLD-Foundation5/7/20145/7/20145/8/2014PPASS
DetailsJim Sly
Jaun Phone #: ###-####
BLD-Footing5/5/20145/5/20145/5/2014PPASS
DetailsDave Hannah
juan Phone #: ###-####
Issue PAID IN FULL permit  4/24/2014 DONE
DetailsChristina Prado
Extend Review Timeline  3/18/2014 DONE
DetailsChristina Prado
180 day extension 3/18/14
Expiration Notice3/5/20143/26/20143/5/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  10/16/2013  
Telephone call  10/16/2013  
10-16-13 called Tahoe Homes permit ready and fee given ///dld
Plan assigned to (JG)9/26/20139/26/201310/15/2013 PASS
DetailsJavier Guzman
1st review completed, Due 10/15 L2-
Routing - Erosion and Sediment  10/15/2013 PASS
DetailsEvan Jenkins
Routing - PLAN CHECK10/14/2013 10/15/2013 PASS
DetailsJavier Guzman
Case Summary (BLD)  10/15/2013 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/15/2013 DONE
Inspection Record Card- Bld  10/15/2013 DONE
DetailsTisha Gallop
Routing - FIRE  10/14/2013 PASS
No Comments
Routing - PLAN CHECK10/7/2013 10/14/2013 FAIL
DetailsJavier Guzman
Pending ESC sign off
1st review completed  10/14/2013 FAIL
DetailsJavier Guzman
Routing - MECHANICAL9/30/2013 10/7/2013 PASS
DetailsTroy James
Routing - PLANNING9/30/2013 9/30/2013 PASS
DetailsJoshua Johnson
Routing PW Grading-Hillside9/27/2013 9/30/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS9/27/2013 9/30/2013 PASS
DetailsConnie Baumgartner
Route to Impact Fee Review9/26/201310/1/20139/27/2013 PASS
DetailsCindy M. Gould
Application received 9/26/20139/27/2013 DONE
Routing - Addressing9/27/2013 9/27/2013 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  9/26/2013 DONE
DetailsTisha Gallop
Intake Approval  9/26/2013 PASS
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/26/2013 DONE
DetailsTisha Gallop