Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD13-02671
StatusFinaled
Name BRIGHTON HOMES IDAHO INC
Site Address 4120 S MACBETH AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone B, Class A Roof, Permit for the construction of a new 3430 sq. ft., two story (first story 1970 sq. ft., second story 1460 sq. ft.) single family dwelling with 6 bedrooms, 3.5 bathrooms, approximately 805 sq. ft. of covered patio/porch and a 930 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. SP-02 zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/16/20144/16/20144/16/2014PPASS
DetailsDave Hannah
Garage code is 1424. Thank you Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
DOC - Permit Finaled4/16/20144/16/20144/16/2014PPASS
DetailsDave Hannah
BLD-Energy code compliance1/13/20141/14/20141/14/2014APASS
DetailsTony Young
Please inspect as early as possible.
Thanks Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
BLD-Framing/Rough-in1/9/20141/10/20141/10/2014APART
DetailsDave Hannah
Please inspect as early as possible. Thanks Phone #: ###-#### >> Inspection requested via web by Braxton Hansen c/n on site ok to insulate after mec rough in is oked
BLD-Wall Bracing12/30/201312/31/201312/31/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen. braced walls 1st. floor ok. Contractor had engineering for repair of portal frame areas at 1st. floor. Will have scanned in.
BLD-Wall Bracing12/17/201312/18/201312/19/2013APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen second level ok but ground floor portal framing still needs to be done.
BLD-Wall Bracing12/16/201312/17/201312/17/2013AFAIL
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen. Install all missing blocking at 2nd. floor (east wall and south east corner) and nail off. Noted all portal frames, except garage, headers not installed to end of wall, panel splices not within 2ft. of panel mid height. Correction notice posted.
BLD-Foundation11/12/201311/12/201311/12/2013PPASS
DetailsMike Jordan
Doug Phone #: ###-####
BLD-Footing11/8/201311/8/201311/12/2013PPASS
DetailsDave Hannah
Doug Phone #: ###-####
Issue PAID IN FULL permit  10/28/2013 DONE
DetailsTisha Gallop
OVERRIDE  10/9/2013  
Plan assigned to (JG)9/30/20139/30/201310/9/2013 PASS
DetailsJavier Guzman
Due 10/11 L1-
1st review completed  10/9/2013 DONE
DetailsJavier Guzman
Case Summary (BLD)  10/9/2013 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/9/2013 DONE
Inspection Record Card- Bld  10/9/2013 DONE
DetailsTisha Gallop
Permit Ready to Issue  10/9/2013 DONE
Telephone call  10/9/2013 DONE
emailed seth
Routing - PLAN CHECK10/3/2013 10/9/2013 PASS
DetailsJavier Guzman
Routing - MECHANICAL  10/3/2013 PASS
Route to Impact Fee Review9/30/201310/3/201310/1/2013 PASS
DetailsCindy M. Gould
Routing - PUBLIC WORKS9/30/2013 10/1/2013 PASS
DetailsConnie Baumgartner
Routing - PLANNING10/1/2013 10/1/2013 PASS
DetailsLeon Letson
Plan assigned to (AJS)9/30/20139/30/20139/30/2013 DEFR
DetailsAdele J Schaffeld-Griffin
Application received 9/27/20139/30/2013 DONE
Plans ACCEPTED BY PLAN TECH  9/30/2013 DONE
Intake Approval  9/30/2013 PASS
Routing - Addressing9/30/2013 9/30/2013 PASS
DetailsJason C. Taylor