Permit NumberBLD13-02700
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5742 E MILLET DR
Project NameGRAMECY I (T2)
Customer Number 
ePlanReviewNo
Description
To construct a new 2485s.f. 3-story; 3-bedroom; 2 & 3/4 bathrooms. There is to be 629s.f. on the main level, 1296s.f. on the 2nd level that extends over the 700s.f. 3-car garage and the 3rd level to be a master suite of 560s.f. There are 2-above grade decks totaling 192s.f. and 620s.f. of exterior concrete slab with 320s.f. covered. R-1 C ok per Josh Johnson. All per the approved plans as marked REScheck, ACCA report and engineer's details with calculations along with the plan review notes. A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor at 384-3946. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/24/20149/25/20149/25/2014APASS
DetailsPhil Shearer
Contact Cllnt with any issues please. Phone #: ###-#### Inspection requested via web by Leonard Dooms
DOC - Permit Finaled9/25/20149/25/20149/25/2014PPASS
DetailsPhil Shearer
PubWorks Occupancy Approval9/24/20149/24/20149/24/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####
BLD-Energy code compliance6/10/20146/11/20146/11/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in6/4/20146/9/20146/9/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Other6/3/20146/3/20146/3/2014PPASS
DetailsDave Hannah
Clint-fire Soffit Phone #: ###-####
Plan Modification Accepted  5/29/2014 DONE
new manual j
Routing - MECHANICAL5/29/2014 5/29/2014 PASS
DetailsTroy James
resubmitted manual j
BLD-Wall Bracing5/15/20145/15/20145/16/2014PPASS
DetailsJim Sly
Joey Phone #: ###-####
BLD-Foundation3/28/20143/31/20143/31/2014APASS
DetailsDave Hannah
Nick-Late morning like 11:30 please Phone #: ###-####
BLD-Footing3/27/20143/27/20143/27/2014PPASS
DetailsDave Hannah
requests 4pm - Wes Phone #: ###-####
PubWorks Subgrade Approval3/26/20143/26/20143/26/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  3/18/2014 DONE
DetailsTisha Gallop
Expiration Notice3/10/20143/31/20143/10/2014 DONE
DetailsChristina Prado
OVERRIDE  10/21/2013  
Inspection Record Card- Bld  10/21/2013 DONE
DetailsChristina Prado
Inspection Record Card- Bld  10/21/2013 DONE
DetailsBarbara Stitt
Telephone call  10/21/2013 DONE
DetailsChristina Prado
called Tahoe to advise permit is ready and gave fees due
Permit Ready to Issue  10/21/2013 DONE
DetailsChristina Prado
Plan assigned to (JG)10/1/201310/1/201310/18/2013 PASS
DetailsJavier Guzman
Due 10/18 L2-
Routing - PLAN CHECK10/1/2013 10/18/2013 PASS
DetailsPerry Paine
Routing - PLAN CHECK10/10/2013 10/18/2013 PASS
DetailsPerry Paine
1st review completed  10/18/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/18/2013 DONE
Routing - Erosion and Sediment10/7/2013 10/10/2013 PASS
DetailsEvan Jenkins
Routing - FIRE10/10/2013 10/10/2013 PASS
DetailsScott Arellano
No comments.
Routing - MECHANICAL  10/7/2013 PASS
DetailsTroy James
Route to Impact Fee Review10/1/201310/4/201310/3/2013 PASS
DetailsCindy M. Gould
Route to Impact Fee Review10/1/201310/4/201310/3/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING10/3/2013 10/3/2013 PASS
DetailsLeon Letson
Routing - PUBLIC WORKS10/1/2013 10/3/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing10/1/2013 10/2/2013 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside10/1/2013 10/2/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Application received 10/1/201310/1/2013 DONE
Plans ACCEPTED BY PLAN TECH  10/1/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/1/2013 DONE
DetailsTisha Gallop
Intake Approval  10/1/2013 PASS
DetailsTisha Gallop